RAI, Security Plan Sections 1-9 (TAC MC2888 and MC2889)
ML041970166
Person / Time
Site: Beaver Valley
Issue date: 06/28/2004
From: Spaulding D
NRC/NRR/DLPM/LPD2
To: Pearce L
FirstEnergy Nuclear Operating Co
Spalding D, NRR/DLPM/LPD3-1, 415-2928
References
TAC MC2888, TAC MC2889
Download: ML041970166 (3)


Text

SAFEGUARDS INFORMATION June 28, 2004 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Route 168 P.O. Box 4 Shippingport, PA 15077-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 AND - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TACMC2888 AND MC2889)

Dear Mr. Pearce:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Beaver Valley Power Station, Units 1 and 2 and .

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 and

Enclosure:

As stated cc w/o encl: See next page NOTICE: The enclosed information contains Safeguards WARNING: Violation of Section 147 Information. Upon separation from the enclosure, this of the Atomic Energy Act, letter is DECONTROLLED.

Safeguards Information is subject to Civil and Criminal Penalties SAFEGUARDS INFORMATION

June 28, 2004 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Route 168 P.O. Box 4 Shippingport, PA 15077-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 AND - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TACMC2888 AND MC2889)

Dear Mr. Pearce:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Beaver Valley Power Station, Units 1 and 2 and .

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 and

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION: PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041970166 C:\ORPCheckout\FileNET\ML041970166.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME DSpaulding JPeralta JNakoski DATE 6/26/04 6/28/04 6/28/04 OFFICIAL RECORD COPY

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney Rachel Carson State Office Building FirstEnergy Nuclear Operating Company P.O. Box 8469 FirstEnergy Corporation Harrisburg, PA 17105-8469 76 South Main Street Akron, OH 44308 Mayor of the Borough of Shippingport P O Box 3 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Regulatory Affairs/Performance Improvement Regional Administrator, Region I Larry R. Freeland, Manager U.S. Nuclear Regulatory Commission Beaver Valley Power Station 475 Allendale Road Post Office Box 4, BV-A King of Prussia, PA 19406 Shippingport, PA 15077 Resident Inspector Commissioner James R. Lewis U.S. Nuclear Regulatory Commission West Virginia Division of Labor Post Office Box 298 749-B, Building No. 6 Shippingport, PA 15077 Capitol Complex Charleston, WV 25305 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Director, Utilities Department ATTN: R. G. Mende, Director Public Utilities Commission Work Management (BV-IPAB) 180 East Broad Street Post Office Box 4 Columbus, OH 43266-0573 Shippingport, PA 15077 Director, Pennsylvania Emergency FirstEnergy Nuclear Operating Company Management Agency Beaver Valley Power Station 2605 Interstate Dr. Mr. B. F. Sepelak Harrisburg, PA 17110-9364 Post Office Box 4, BV-A Shippingport, PA 15077 Ohio EPA-DERR ATTN: Zack A. Clayton Mr. L. William Pearce Post Office Box 1049 Vice President Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Dr. Judith Johnsrud Beaver Valley Power Station National Energy Committee Post Office Box 4 Sierra Club Shippingport, PA 15077 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection