L-04-079, May 2004 Monthly Operating Report for Beaver Valley Power Station

From kanterella
Jump to navigation Jump to search
May 2004 Monthly Operating Report for Beaver Valley Power Station
ML041700058
Person / Time
Site: Beaver Valley
Issue date: 06/07/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-04-079
Download: ML041700058 (3)


Text

FENOC

,riscnf gyvhd#cp#at.ng Carter y Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-04-079 June 7, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the -Monthly Operating Report'"', and. Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of May, 2004. This information has also been inputted into :the INPO Consolidated Data Entry (CDE) System.

No regulatory commitments are contained in this submittal.

Respectfully, Vice-President BVPS DTJ/jmm Enclosures C

t i

,;,,+s;Xt i 3 s~j 0

J,; ; ;

a;,;.A 0!

c NRC Regional Offile"

\\

D

'1/4 ioP.

n fPs-.si9a,,P Li

.TA

i'N-OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-334 Beaver Valley I June 01.2004 David T. Jones (724) 6824962 REPORTING PERIOD:

May 2004

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 835.00 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,647.00 171,674.27
4. Number of Hours Generator On-line 744.00 3,647.00 169,144.82

__ 5._ Reserve Shutdown Hours O

.0.00 0.00 0.00

6.

Net Electrical Energy Generated (MWHrs) 621,290.00 3,025,460.00 127,666,832.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments NONE.

I Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-412 Beaver Valley 2 June 01, 2004 David T. Jones (724) 682-4962 REPORTING PERIOD:

May 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe

3.

Number of Hours the Reactor was Cril

4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours_
6. Net Electricai Energy Generated (MWI

-Net) 836.00 831.00 This Month Yr-to-Date Cumulative tical 744.00 3,647.00 121,255.48 744.00 3,647.00 120,511.38 0.00 000.

000_

irs) 604,030.00 3,038,449.00 94,857,847.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments NONE.

I Reason:

-A. Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 5/15104 at 0327 hours0.00378 days <br />0.0908 hours <br />5.406746e-4 weeks <br />1.244235e-4 months <br />, the Unit began a power reduction to approximately 62% output in order to repair the "B" Main Feedwater Pump Shaft-Driven Main Lube Oil Pump suction pipe (located inside the oil reservoir) that had vibrated loose. An output of approximately 62% was achieved at 0643 hours0.00744 days <br />0.179 hours <br />0.00106 weeks <br />2.446615e-4 months <br /> on 5/15/04. Output was further reduced from approximately 62% to approximately 59% from 1200 to 1400 on 5/15/04 in order to clear a Feedwater Pump Flow high alarm. Following completion of repairs, the Unit commenced to return to full power at 2332 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.87326e-4 months <br /> on 5/16/04. A nominal value of 100% output was achieved at 0337 hours0.0039 days <br />0.0936 hours <br />5.57209e-4 weeks <br />1.282285e-4 months <br /> on 5/17/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1