|
---|
Category:Inspection Report
MONTHYEARIR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report IR 05000334/20230102023-03-0808 March 2023 Biennial Problem Identification and Resolution Inspection Report 05000334/2023010 05000412/2023010 IR 05000334/20220062023-03-0101 March 2023 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006) IR 05000334/20220042023-02-0909 February 2023 Integrated Inspection Report 05000334/2022004 and 05000412/2022004 IR 05000334/20224012023-01-0909 January 2023 Security Baseline Inspection Report 05000334/2022401 and 05000412/2022401 (Cover Letter Only) ML22314A2682022-12-16016 December 2022 Review of the Fall 2021 2R22 Steam Generator Tube Inspection 180 Day Report IR 05000334/20220032022-11-10010 November 2022 Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001 IR 05000334/20220052022-08-31031 August 2022 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005) IR 05000334/20220022022-08-12012 August 2022 Integrated Inspection Report 05000334/2022002 and 05000412/2022002 IR 05000334/20224022022-08-12012 August 2022 Cyber Security Problem Identification and Resolution Inspection Report 05000334/2022402 and 05000412/2022402 (Cover Letter Only) IR 05000334/20225012022-06-29029 June 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2022501 and 05000412/2022501 IR 05000334/20220112022-06-29029 June 2022 Temporary Instruction 2515/194 Inspection Report 05000334/2022011 and 05000412/2022011 IR 05000412/20223012022-06-14014 June 2022 Initial Operator Licensing Examination Report 05000412/2022301 IR 05000334/20220102022-05-12012 May 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000334/2022010 and 05000412/2022010 IR 05000334/20224202022-05-11011 May 2022 Security Baseline Inspection Report 05000334/2022420 and 05000412/2022420 - Cover Letter IR 05000334/20220012022-05-10010 May 2022 Integrated Inspection Report 05000334/2022001 and 05000412/2022001 IR 05000334/20210062022-03-0202 March 2022 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006) IR 05000334/20210042022-02-14014 February 2022 Integrated Inspection Report 05000334/2021004 and 05000412/2021004 L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage IR 05000334/20210032021-11-0909 November 2021 Integrated Inspection Report 05000334/2021003 and 05000412/2021003 IR 05000334/20210112021-10-19019 October 2021 Temporary Instruction 2515/194 Inspection Report 05000334/2021011 and 05000412/2021011 IR 05000334/20210102021-09-29029 September 2021 Triennial Fire Protection Inspection Report 05000334/2021010 and 05000412/2021010 IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) IR 05000334/20214022021-08-18018 August 2021 Security Baseline Inspection Report 05000334/2021402 and 05000412/2021402 IR 05000334/20214012021-08-12012 August 2021 Material Control and Accounting Program Inspection Report 05000334/2021401 and 05000412/2021401 (Cover Letter Only) IR 05000334/20210022021-08-11011 August 2021 Integrated Inspection Report 05000334/2021002 and 05000412/2021002 IR 05000334/20214032021-05-13013 May 2021 Cyber Security Problem Identification and Resolution Inspection Report 05000334/2021403 and 05000412/2021403 (Cover Letter Only) IR 05000334/20210012021-05-13013 May 2021 Integrated Inspection Report 05000334/2021001 and 05000412/2021001 ML21097A1142021-04-19019 April 2021 Review of Steam Generator Tube Inspection Report for the Spring 2020 Refueling Outage 2024-08-05
[Table view] Category:Inspection Report Correspondence
MONTHYEARML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML20057D4142020-02-24024 February 2020 Ti 2515/194 Inspection Documentation Request IR 05000334/20164032016-08-18018 August 2016 Security Inspection Report 05000334/2016403 and 05000412/2016403 (Cover Letter-PUBLIC) ML13114A9602013-05-0202 May 2013 No. 1 - Review of Steam Generator Tube Inspection Report for Spring 2012 Refueling Outage IR 05000041/20090082009-10-15015 October 2009 IR 05000334-09-008, and IR 0500041-09-008, Beaver Valley Problem Identification & Resolution Inspection - Request for Documents ML0929200622009-10-15015 October 2009 IR 05000334-09-008, and IR 0500041-09-008, Beaver Valley Problem Identification & Resolution Inspection - Request for Documents ML0929200762009-10-15015 October 2009 IR 05000334-09-008, and IR 05000412-09-008, Beaver Valley Problem Identification and Resolution - Entrance Meeting Attendees IR 05000334/20090082009-10-15015 October 2009 IR 05000334-09-008, and IR 05000412-09-008, Beaver Valley Problem Identification and Resolution Inspection - Exit Meeting Attendees IR 05000334/20074052007-12-0505 December 2007 IR 05000334-07-405, and IR 05000412-07-405, on 10/22/2007, Beaver Valley Power Stations, Units 1 and 2, Access Control IR 05000334/20052012007-10-0303 October 2007 Letter to Mr. P. Sena Beaver Valley Power Station - NRC Material Control and Accounting Program Inspection - Report 05000334/2005201 and 05000412/2005201 IR 05000334/20060112006-10-0303 October 2006 IR 05000334/2006011 and 05000412/2006011; Beaver Valley Power Station, Units 1 and 2; Ti 2515/168 ML0626203412006-09-18018 September 2006 IR 05000334-06-009, 05000412-06-009; on 06/26/2006 - 08/22/2006; Beaver Valley Nuclear Power Station, Units 1 and 2; Exercise Evaluation IR 05000334/20050052005-06-29029 June 2005 IR 05000334-05-005, IR 05000412-05-005, Beaver Valley PI&R Inspection Request Form with CR Lists IR 05000334/20040092004-05-27027 May 2004 IR 05000334-04-009, & IR 05000412-04-009, on 04/19/2004 Through 04/23/2004, for Beaver Valley Power Station, Physical Security Baseline Inspection ML0327403282003-10-0101 October 2003 Beaver Valley Unit 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0312108572003-04-30030 April 2003 Attachment 3 - Tabular Results from the Expanded Extent of Condition for CR 02-02202 ML0312108422003-04-30030 April 2003 Attachment 4 - Corrective Action ML0312108152003-04-30030 April 2003 Attachment 3 - Corrective Action 02-02202-24 Expanded Extent of Condition IR 05000334/20020022002-04-24024 April 2002 IR 05000334/2002-002, IR 05000412/2002-002, on 02/10-03/30/2002; Firstenergy Nuclear Operating Company; Beaver Valley Power Station; Units 1 & 2. Event Follow-up. One Issue of Very Low Safety Significance Identified IR 05000334/20020032002-04-12012 April 2002 IR 05000334/2002-003, IR 05000412/2002-003, on 09/01/01-03/15/2002; Firstenergy Nuclear Operating Company; Units 1 and 2; Alert and Notification System. One Yellow Violation Identified 2024-05-29
[Table view] |
Text
SUBJECT:
BEAVER VALLEY POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NOS. 05000334/2004009 AND 05000412/2004009
Dear Mr. Pearce:
On April 23, 2004, the U.S. Nuclear Regulatory Commission (USNRC) completed the onsite portion of an inspection at your Beaver Valley Power Station (Beaver Valley). The enclosed report documents the inspection findings, which were discussed on April 23, 2004, with Mr.
James Lash, Plant Manager, Mr. Kenneth Halliday, Manager of Security, and other members of your staff.
This inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. Within these areas, the inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Mr. L. William Pearce 2 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA by R. V. Crlenjak Acting for/
John R. White, Chief Radiation Safety and Safeguards Branch Division of Reactor Safety Docket Nos. 50-334, 50-412 License No. DPR-66, NPF-73 Enclosure: NRC Inspection Report Nos. 05000334/2004009 and 05000412/2004009 w/Attachment: Supplemental Information (CONTAINS (SGI))
cc w/o encl w/o SGI:
J. Lash, Plant General Manager V. Kaminskas, Director, Nuclear Maintenance R. Mende, Director, Nuclear Work Management T. Cosgrove, Director, Nuclear Engineering/Projects L. Freeland, Manager, Nuclear Regulatory Affairs & Corrective Actions M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio D. Hill, Chief Radiological Health Program, State of West Virginia Mr. L. William Pearce 3 Distribution w/o encl w/o SGI:
Region I Docket Room (with concurrences)
H. Miller, RA/J. Wiggins, DRA P. Eselgroth, DRP R. Barkley, DRP J. Jolicoeur, OEDO R. Laufer, NRR R. Guzman, NRR T. Colburn, PM, NRR W. Lanning, DRS R. Crlenjak, DRS J. White, DRS Distribution w/encl w/SGI:
D. Caron, DRS A. Dimitriadis, DRS P. Cataldo - NRC Senior Resident Inspector K. Halliday, Manager of Security, Beaver Valley B. Westreich, NSIR E. McNeil, NSIR DOCUMENT NAME: C:\ORPCheckout\FileNET\ML041530575.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS NAME ADimitriadis DCaron JWhite (GCS for)
DATE 05/27/04 05/27/04 05/27/04 OFFICIAL RECORD COPY