Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23073A39831 March 2023TMI-2 ISFSI Biennial Update Report for 2023Coatings
Incorporated by reference
Aging Management
Fire Watch
Scaffolding
Grace period
ML22101A07923 March 2022TMI2-EN-RPT-0001, Revision 1, Determination of the Safe Fuel Mass Limit for DecommissioningGrab sample
ML22105A09316 December 2021Attachment 3 - RSCS Technical Support Document (Tsd) No. 21-078 Rev 00 TMI-2 Source Term Limitations and Administrative Controls to Prevent Exceeding the 1 Rem EPA PAGFire Protection Program
ML21236A28810 August 2021TMI-2 Pdms SAR Update 14 & QA Plan (Rev 18 & 19) Biennial Submittal 08-10-21Safe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Locked High Radiation Area
Condition Adverse to Quality
Decommissioning Funding Plan
Tornado Generated Missile
Earthquake
Fire Protection Program
Power change
ML21133A2645 May 2021Supplemental Information to License Amendment Request Decommissioning Technical SpecificationsGrab sample
ML21084A22917 March 2021Notification of Amended Post-Shutdown Decommissioning Activities Report Accordance with 10 CFR 50.82(a)(7), Revision 4Reactor Vessel Water Level
Anticipated operational occurrence
Met Tower
Temporary Modification
Locked High Radiation Area
Exemption Request
Fire Protection Program
Environmental Justice
ML21133A2651 February 2021Calculation TMI2-EN-RPT-0002, Revision 0, MCNP Version 6.2 Bias Determination for Low Enrichment Uranium Using the ENDF/B-VIII.0 Cross Section Library
RS-16-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)29 June 2016Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Temporary Modification
Emergency Lighting
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14189A28530 April 2014Topical Report 213, 40th Year Reactor Building Tendon Surveillance (Period 10), (Rev 0)Safe Shutdown
Fire Barrier
Past operability
Coatings
Nondestructive Examination
Incorporated by reference
Tornado Generated Missile
ML14189A28617 April 2014Final Report for the 40th Year (10th Period) Tendon Surveillance at Three Mile Island, Unit 1Coatings
Foreign Material Exclusion
ML13225A55217 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
Earthquake
ML13338A6719 December 2013Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Three Mile Island, Unit 1, TAC MF0803Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
Earthquake
ML14189A28712 November 2013TMI 40TH Year Tendon Surveillance, Tendon No. 1-146-34, Tendon End Buddress 4Safe Shutdown
Time of Discovery
Commercial Grade Dedication
Coatings
Nondestructive Examination
Aging Management
Foreign Material Exclusion
Moisture barrier
Scaffolding
TMI-14-061, 40th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)3 September 201340th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)Boric Acid
Commercial Grade Dedication
Nondestructive Examination
Incorporated by reference
Condition Adverse to Quality
Foreign Material Exclusion
Liquid penetrant
Scaffolding
TMI-13-107, Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 201331 August 2013Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 2013Exemption Request
ML13232A21731 July 2013Attachment 2 - Areva Document No. ANP-3102, Revision 3,Three-Mile Island Unit 1 Appendix G Pressure-Temperature Limits at 50.2 EFPY with Mur, Revision 3, Dated July 2013Hydrostatic
ML12362A0427 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page C-1 Through Page C-161Boric Acid
Safe Shutdown Earthquake
ML12362A0437 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page C-162 Through Page C-284Scaffolding
TMI-12-161, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through End7 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through EndFukushima Dai-Ichi
Seismically rugged
Earthquake
Scaffolding
Weak link
RS-12-175, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-2097 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-209Safe Shutdown
Unanalyzed Condition
Boric Acid
Packing leak
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Arc flash
Finite Element Analysis
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
Control of Heavy Loads
Scaffolding
Weak link
Seismic Walkdown Report
ML09322086727 October 2009VVR-042181- l-COIL, Rev 0, Verification and Validation Report for Square D Masterpact Circuit Breaker (Coils Only), Attachment 4Cyber Security
ML09240017616 August 2009VVR-042181-1, Rev 8, Verification and Validation Report for Square D Masterpact Circuit Breaker (Including the Micrologic Trip Unit).
ML0932208667 August 2009FAT-REPORT-6910327-1, Rev 0, Factory Acceptance Testing Report on Square-D PZ4 Rx Trip Switchgear, Attachment 3
ML11192025831 July 2009Facility Cpp Report (Final) - Structural Inspection of Horizontal Storage Modules PadTornado Missile
Coatings
Tornado Generated Missile
ML0932208656 May 2009QR-06910327-1, Rev 0, Qualification Report for Square Reactor Trip Switchgear for Three Mile Island, Attachment 2Thermoset
ML0932208685 May 2009QR-042181-5, Rev 1, Emi/Rfi Qualification Report for Masterpact Circuit Breaker Shunt Trip and Undervoltage Trip, Attachment 5
ML09117063011 February 2009Rev. 0 to E16-1555-011, Decommissioning Cost Analysis for Three Mile Island, Unit 1.Fuel cladding
Fire Watch
Scaffolding
ML08288030114 October 2008TMI-1 SEIS Nonradiological Waste Web ReferencesGrab sample
Enforcement Discretion
Coatings
Incorporated by reference
Moisture barrier
Earthquake
ML08256017810 September 2008Response to NRC Request for Additional Information Related to Three Mile Island Nuclear Station, Unit 1, License Renewal ApplicationAging Management
Dissimilar Metal Weld
Power change
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML08051038227 March 2008NRC Staff Questions Reformatted Into Three Topical AreasCoatings
ML08051036727 March 2008NRC Staff Questions for October 31, 2007 Phone Call with AlionBoric Acid
Coatings
ML08051065711 February 2008NRC Staff Questions with Problem StatementsBoric Acid
Mission time
Coatings
ML08023048514 January 2008Evaluation of 2002 USGS National Seismic Hazard Assessment, Final ReportEarthquake
ML08023048414 January 2008Evaluation of 2002 USGS National Seismic Hazard Assessment, Final ReportEarthquake
ML0634601317 December 2006Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS BarrierDeep Dose Equivalent
Fuel cladding
ML05294034714 October 2005Additional Information Regarding Kinetic Expansion Inspection and Repair CriteriaShutdown Margin
Non-Destructive Examination
Finite Element Analysis
Flow Induced Vibration
ML05257045222 August 2005(TMI-2), Update 6 of the Post-Defueling Monitored Storage Safety Analysis ReportGrab sample
Emergency Lighting
Decommissioning Funding Plan
ML0513006243 May 2005Draft ECR #02-01121, Rev. 2, Inspection Acceptance Criteria and Leakage Assessment Methodology for TMI OTSG Kinetic Expansion Examinations.Shutdown Margin
Non-Destructive Examination
Finite Element Analysis
Flow Induced Vibration
GOTHIC
ML08288073231 March 2005SEIS Ch. 8 Air Quality Web References, Technical Support DocumentCoatings
ML05077026515 March 2005PSC Precision Surveillance Corporation, Thirtieth Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume II of III
ML05077025415 March 2005PSC Precision Surveillance Corporation, 30th Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume I of III
ML05077027115 March 2005PSC Precision Surveillance Corporation, Thirtieth Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume III of III
ML0505600378 February 200512-5023272-01, Risk Assessment for Alternate STS End States.Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Mission time
Time to boil
Probabilistic Risk Assessment
Offsite Circuit
Manual Operator Action
ML04117040315 April 2004Biennial 10 CFR 50.59 and Commitment Revision Report for 2002 and 2003Safe Shutdown
ML0326601327 August 2003Update 5 of the Post-Defueling Monitored Storage Safety Analysis ReportEarthquake
ML03059021915 February 2003Long Range Planning Program (Lrpp) Annual Update of Integrated Schedule ABC Project Listing
ML0228405034 October 2002Additional Information Regarding Kinetic Expansion Inspection & Repair CriteriaShutdown Margin
Non-Destructive Examination
Finite Element Analysis
Flow Induced Vibration
ML02283070730 September 2002License Amendment Request No. 318 Integrated Leak Rate Test DeferralHigh winds
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier