ML030590219

From kanterella
Jump to navigation Jump to search
Long Range Planning Program (Lrpp) Annual Update of Integrated Schedule ABC Project Listing
ML030590219
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/15/2003
From: George Gellrich
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
5928-03-20023
Download: ML030590219 (14)


Text

AmerGea.,

AmerGen Energy Company, LLC Telephone 717-944-7621 An Exelon/Brntish EneTgy Company Three Mile Island Unit Route 441 South, P 0 Box 480 Middletown, PA 17057 February 15, 2003 5928-03-20023 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT NO. I (TMI-1)

DOCKET NO. 50-289 OPERATING LICENSE NO. DPR-50 LONG RANGE PLANNING PROGRAM (LRPP)

ANNUAL UPDATE OF INTEGRATED SCHEDULE "ABC" PROJECT LISTING Pursuant to License DPR-50 Condition No. 2.c.9, AmerGen Energy Company, LLC (AmerGen) hereby submits the required annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule. The attachments to this letter include: 1) the ABC project listing; and, 2) a summary of changes since the last submittal forwarded by AmerGen Letter No. 5928-01-20342, dated December 13, 2001. An abstract of the attachments follows:

1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistent with cycle/year commitments. Any changes in schedule are reflected on Attachments A and B.

5928-03-20023 Page 2

2. Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The Attachment B listing also contains Category C project completions. Please note that changes to the Category C scope or schedule do not impact the Category A and B schedules.

Pursuant to the LRPP for TMI-1, AmerGen will assume that the NRC is in agreement with the above Category A and B changes, unless we are notified otherwise within 15 days of receipt. Ifadditional information is needed, please contact Adam Miller, of TMI-1 Regulatory Assurance at (717) 948-8128.

Sincerely, G. H. Gellrich Plant Manager GHG/awm Attachments File No. 01083 cc: Administrator Region I TMI-1 Senior Resident Inspector TMI-1 Project Manager Chairman, Board of Supervisors, Londonderry Township, Dauphin County, Pennsylvania Board of County Commissioners, Dauphin County, Pennsylvania Pennsylvania Department of Environmental Resources, Bureau of Radiation Protection

ATTACHMENT A TMI-1 PROJECT LISTING INTEGRATED SCHEDULE ANNUAL UPDATE (February, 2003)

TMI-1 PROJECT LISTING NRC INTEGRATED SCHEDULE CATEGORY "A" PROJECTS STATUS AS OF 1131103 OBS BIA NUMBER DESCRIPTION CYCLE/YEARS CLASSIFICATION 1 Technical When handling irradiated fuel in the Reactor Building, a On-Going commitment NRR Specification shiftly check and a daily verification (once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) (License Amendment #236, shall be performed to confirm that the Fuel Transfer dated 10/2101) 3.8.11 Canal water level is >23 feet above the reactor vessel flange.

2 Technical A minimum Reactor Coolant System (RCS) flow rate of On-Going commitment NRR Specification 2.1 105.5% of design flow (105.5% of 352,000 gpm) is (License Amendment #238, specified to offset potential mixed core DNBR penalty for dated 10123101)

TMI Unit-I Cycle 14 and any subsequent cycle. This commitment expires when a mixed core penalty is no longer required or NRC-approved statistical core design methods are utilized which provide an alternative means of addressing transition core effects.

Legend:

  • *New Projects
    • B/A Number Change

TMI-1 PROJECT LISTING NRC INTEGRATED SCHEDULE CATEGORY "B" PROJECTS Status as of 1/31/03 OBS B/A NUMBER DESCRIPTION CYCLE/ CLASSIFICATION YEARS

    • 5 TR Fuel BASELINE OUTAGE 15R NRR REFUELING, TURBINE 2003 PERFORM OUTAGE ACTIVITIES INCLUDING PM, CM, INSPECTION & OVERHAUL, ISI AND FAC ACTIVITIES AND OUTAGE PREPARATION AND SUPPORT
    • 7 N/A BASELINE OUTAGE 16R NRR REFUELING, TURBINE 2005 PERFORM OUTAGE ACTIVITIES INCLUDING PM, CM, INSPECTION & OVERHAUL, ISI AND FAC ACTIVITIES AND OUTAGE PREPARATION AND SUPPORT.
    • a T20228 REACTOR BUILDING TENDON SURVEILLANCE 16R NRR PROGRAM. 2005 PROVIDE CONTRACTOR AND PLANT SUPPORT FOR SURVEILLANCE REF NUREG 135.1; TS 4.4.2.1
    • I0 TR Fuel BASELINE OUTAGE 17R NRR REFUELING, TURBINE 2007 PERFORM OUTAGE ACTIVITIES INCLUDING PM, CM, INSPECTION & OVERHAUL, ISI AND FAC ACTIVITIES AND OUTAGE PREPARATION AND SUPPORT.

Legend:

  • *New Projects
  • B/A Number Change

TMI-1 PROJECT LISTING NRC INTEGRATED SCHEDULE CATEGORY "B" PROJECTS Status as of 1/31/03 OBS B/A NUMBER DESCRIPTION CYCLE/ CLASSIFICATION YEARS 11 T20111 TMI PRA UPDATE 2002- NRR 2_0_0_3 PERFORM PERIODIC UPDATE OF TMI PRA.

12 T20112 DEVELOP FIRE PRA 2005 NRR DEVELOP FIRE PRA FOR TMI.

Legend:

  • *New Projects
  • *
  • B/A Number Change

TMI-1 PROJECT LISTING NRC INTEGRATED SCHEDULE CATEGORY "C"'PROJECTS Status as of 1/31/03 OBS B/A NUMBER DESCRIPTION CYCLE/ CLASSIFICATION YEARS 13 C12677 COMPLETE RERACKING SPENT FUEL POOL A 2003 NRR FABRICATE, DELIVER, INSTALL 6 RACKS & LICENSE SUBMITTAL, REFURB EQUIP & ENHANCE LIFT CAPABILITIES @ NORTH END 14 T10128 BREAKER OVERHAULS 2002- MRC TO 2004 ESTABLISH A SHOP AREA AND INSTALL NECESSARY EQUIPMENT OVERHAUL AND REFURBISH BREAKERS.

    • 15 T10141 SIMULATOR SOFTWARE UPGRADES 2004- MRC 2005 VERSION OF OPEN SIM UPGRADE THE TMI SIMULATOR SOFTWARE TO LATEST AND OPEN SIM IS AT THE SAME TIME UPGRADEING THERMAL HYDRAULICS SOFTWARE TO THOR 16 T10154 PURCHASE AMD INSTALL AUX BOILERS 16R MRC MATERIAL 2005 PURCHASE AND INSTALL NEW AUX BOILERS TO UPGRADE CONDITION OF AUX BOILERS AND TO IMPROVE RELIABILITY.
    • 17 T10181 REFURBISH NATURAL DRAFT COOLING TOWERS 16R MRC TO MITIGATE 2005 PERFORM MAJOR REPLACEMENT OF MATERIAL ON THE NDCTS DEGRADATION & MAINTAIN MATERIAL CONDITION 18 T10131 PURCHASE NEW REACTOR HEAD 15R MRC 2003 VESSEL HEAD.

PURCHASE AND INSTALL NEW REACTOR 19 T10132 MOISTURE SEPERATOR INTERNALS 16R IOE REPLACE MOISTURE SEPERATOR INTERNALS TO INCREASE EFFICIENCY, AND INCREASE UNIT POWER OUTPUT.

Legend:

  • *New Projects
** B/A Number Change

TMI-1 PROJECT LISTING NRC INTEGRATED SCHEDULE CATEGORY "C" PROJECTS Status as of 1/31/03 OBS B/A NUMBER DESCRIPTION CYCLE/ CLASSIFICATION YEARS 20 T20112 BREAKER OVERHAULS 2002- MRC ESTABLISH AND IMPLEMENT BREAKER OVERHAUL PROGRAM AT TMI 2005

    • 21 TI0181 REFURBISH NATURAL DRAFT COOLING TOWERS 17R MRC NDCTS TO MITIGATE 2007 PERFORM MAJOR REPLACEMENT OF MATERIAL ON THE DEGRADATION & MAINTAIN MATERIAL CONDITION I I-_I Legend:
  • *New Projects S*
  • B/A Number Change

ABC Classifications a) Meet NRC Requirements (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.

b) Meet Environmental Requirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c) Meet Other Requirements (ORR) -Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or law suit settlement, or other guidance to which the company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

d) Increase Safety Margins (ISM) - Activities that if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulation codes or guidance.

e) Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f) Improve Radiological Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control/reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

g) Maintain Reliability/Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment.

Includes activities in response to national codes or standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently.

h) Improve Reliability/Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.

i) Improve Operational Effectiveness (ICE) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating/maintenance costs.

j) Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.

ABC Classifications

(continued) k) Provide Contingency Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

I) Improves Heat Rate Performance (HRP) - Activities that, if implemented, will increase power production by enhancing the heat rate efficiency.

m) General Working Conditions (GWC) - Activities, tools, and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback.

ATTACHMENT B TMI-1 PROJECT LISTING INTEGRATED SCHEDULE ANNUAL UPDATE (February, 2003)

ATTACHMENT B CHANGES TO TMI-1 NUCLEAR GENERATING STATION INTEGRATED SCHEDULE ANNUAL UPDATE (February, 2003)

Category 'A' Projects Additions: None Completions: None Deletions: None

ATTACHMENT B (Continued)

Category 'B' Projects Additions: None Completions: 123321 Provide Contractor and Plant Support for Reactor Building Tendon Surveillance Program Deletions: None

ATTACHMENT B (Continued)

Category 'C' Projects Additions: None Completions: None Deletions: None