Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G795 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20217H020 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20217F366 | 22 September 1999 | Rev 18 to McGuire Unit 1 Cycle 14 Colr | Boric Acid Shutdown Margin |
ML20212D191 | 20 September 1999 | SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 | |
ML20216E540 | 7 September 1999 | Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 | |
ML20212B471 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20217G810 | 31 August 1999 | Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 | |
ML20217H032 | 31 August 1999 | Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20216E885 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20211B128 | 31 August 1999 | Dynamic Rod Worth Measurement Using Casmo/Simulate | |
ML20211G526 | 24 August 1999 | SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 | VT-2 Incorporated by reference Dissimilar Metal Weld Unidentified leakage |
ML20211A979 | 20 August 1999 | Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 | Incorporated by reference |
ML20211C129 | 17 August 1999 | ISI Rept Unit 1 Catawba 1999 RFO 11 | Dissimilar Metal Weld |
ML20211F344 | 17 August 1999 | Updated non-proprietary Page 2-4 of TR DPC-NE-2009 | |
ML20210R105 | 6 August 1999 | Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced | |
ML20212B487 | 31 July 1999 | Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20210S289 | 31 July 1999 | Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20210S237 | 31 July 1999 | Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20216E895 | 31 July 1999 | Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20209E436 | 9 July 1999 | SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation | |
ML20196K663 | 7 July 1999 | Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers | Operability Determination |
ML20209H450 | 30 June 1999 | Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20210S295 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20209H163 | 30 June 1999 | Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20210S249 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20196A000 | 31 May 1999 | Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20209H456 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology | Boric Acid Shutdown Margin Loop seal Fuel cladding Coast down Affidavit Manual Operator Action |
ML20195K369 | 31 May 1999 | Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20196L188 | 31 May 1999 | Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology | GOTHIC |
ML20209H173 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206P520 | 14 May 1999 | Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves | Stroke time Power Uprate |
ML20206N351 | 11 May 1999 | Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs | Stroke time |
ML20206N839 | 4 May 1999 | Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr | Boric Acid |
ML20206R181 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20196A004 | 30 April 1999 | Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206R089 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20195K376 | 30 April 1999 | Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206N826 | 22 April 1999 | Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included | Boric Acid Shutdown Margin |
ML20205S555 | 21 April 1999 | Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions | |
ML20205N365 | 12 April 1999 | Safety Evaluation Accepting IPE of External Events Submittal | Fire Barrier Internal Flooding Probabilistic Risk Assessment Earthquake |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205L234 | 5 April 1999 | SFP Criticality Analysis | |
ML20206R193 | 31 March 1999 | Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20206R093 | 31 March 1999 | Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205P952 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20205P899 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205C417 | 25 March 1999 | Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Backfit |
ML20207K205 | 5 March 1999 | Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed | |
ML20205P956 | 28 February 1999 | Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 |