Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G79530 September 1999Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2
ML20217H02030 September 1999Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217F36622 September 1999Rev 18 to McGuire Unit 1 Cycle 14 ColrBoric Acid
Shutdown Margin
ML20212D19120 September 1999SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2
ML20216E5407 September 1999Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826
ML20212B47131 August 1999Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217G81031 August 1999Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2
ML20217H03231 August 1999Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20216E88531 August 1999Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2
ML20211B12831 August 1999Dynamic Rod Worth Measurement Using Casmo/Simulate
ML20211G52624 August 1999SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1VT-2
Incorporated by reference
Dissimilar Metal Weld
Unidentified leakage
ML20211A97920 August 1999Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2Incorporated by reference
ML20211C12917 August 1999ISI Rept Unit 1 Catawba 1999 RFO 11Dissimilar Metal Weld
ML20211F34417 August 1999Updated non-proprietary Page 2-4 of TR DPC-NE-2009
ML20210R1056 August 1999Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced
ML20212B48731 July 1999Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2
ML20210S28931 July 1999Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2
ML20210S23731 July 1999Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2
ML20216E89531 July 1999Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2
ML20209E4369 July 1999SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation
ML20196K6637 July 1999Safety Evaluation Supporting Licensee 990520 Position Re Inoperable SnubbersOperability Determination
ML20209H45030 June 1999Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2
ML20210S29530 June 1999Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2
ML20209H16330 June 1999Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2
ML20210S24930 June 1999Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2
ML20196A00031 May 1999Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2
ML20209H45631 May 1999Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206T47731 May 1999Rev 3 to UFSAR Chapter 15 Sys Transient Analysis MethodologyBoric Acid
Shutdown Margin
Loop seal
Fuel cladding
Coast down
Affidavit
Manual Operator Action
ML20195K36931 May 1999Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2
ML20196L18831 May 1999Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response MethodologyGOTHIC
ML20209H17331 May 1999Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2
ML20206P52014 May 1999Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated ValvesStroke time
Power Uprate
ML20206N35111 May 1999Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related MovsStroke time
ML20206N8394 May 1999Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 ColrBoric Acid
ML20206R18130 April 1999Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20196A00430 April 1999Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206R08930 April 1999Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2
ML20195K37630 April 1999Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2
ML20206N82622 April 1999Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not IncludedBoric Acid
Shutdown Margin
ML20205S55521 April 1999Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions
ML20205N36512 April 1999Safety Evaluation Accepting IPE of External Events SubmittalFire Barrier
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205L2345 April 1999SFP Criticality Analysis
ML20206R19331 March 1999Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2
ML20206R09331 March 1999Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205P95231 March 1999Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2
ML20205P89931 March 1999Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205C41725 March 1999Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings ReviewedSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Backfit
ML20207K2055 March 1999Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed
ML20205P95628 February 1999Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2