 Issue dateTitleTopic
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
ML20246C40015 August 1989Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14
ML20246Q03010 August 1989Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage8 August 1989PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No DamageEarthquake
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred5 July 1989PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage OccurredEarthquake
IR 05000157/198900111 May 1989Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors
ML20247B6659 May 1989Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment ProgramsUltimate heat sink
Temporary Modification
Scaffolding
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred3 April 1989PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release OccurredEarthquake
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
IR 05000321/19880379 March 1989Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling
IR 05000213/198802115 November 1988Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
IR 05000280/198804026 October 1988Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup ItemsSafe Shutdown
IR 05000369/198802113 October 1988SALP Repts 50-369/88-21 & 50-370/88-21 for Aug 1987 - Jul 1988Boric Acid
High Radiation Area
Hydrostatic
Missed surveillance
Systematic Assessment of Licensee Performance
Operability Determination
Fire Watch
Backfit
Unidentified leak
Siren
IR 05000413/198802413 October 1988SALP Repts 50-413/88-24 & 50-414/88-24 for Aug 1987 - Jul 1988Boric Acid
Systematic Assessment of Licensee Performance
Inattentive
Unidentified leakage
Unidentified leak
ML20151U77010 August 1988Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250,000.Violations Noted:Control Room Operators Observed Sleeping While on Duty,Reading Matls Not Directly Job Related & Failure to Rept Items to NRC
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley27 June 1988PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at BerkeleyEarthquake
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities13 June 1988PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at FacilitiesEarthquake
IR 05000454/198800827 May 1988Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends9 May 1988PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends
IR 05000272/198800618 March 1988Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt EffectivenessInattentive
ML20151U8784 March 1988Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item
IR 05000354/19860994 March 1988SALP Rept 50-354/86-99 on 861201-880115High Radiation Area
Grab sample
Temporary Modification
Missed surveillance
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Scaffolding
Unidentified leakage
Unidentified leak
Siren
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
IR 05000272/19860995 February 1988SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987Safe Shutdown
High Radiation Area
Fire Barrier
Weld Overlay
Locked High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Fire Protection Program
Fire Watch
Siren
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted24 November 1987PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations NotedEarthquake
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems3 November 1987PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems
ML20236B88520 October 1987Performance Appraisal Nrc/State Contracts for Environ Monitoring on 871005-06.State Fulfilled All Requirements W/ Few Exceptions.Major Areas Inspected:Repts,Correspondence, day-to-day Contacts & Promptness in Resolution of Problems
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
ML20235T25024 September 1987Notice of Violation from Insp on 870901-03.Violations Noted: None of Three Firemen from Nuclear Test Reactor Bldg Emergency Team Provided w/self-contained Breathing Apparatus Training & Failure to Maintain Records on Training
IR 05000324/198701923 September 1987SALP Repts 50-324/87-19 & 50-325/87-19 for Nov 1985 - June 1987Fitness for Duty
High Radiation Area
Weld Overlay
Probabilistic Risk Assessment
Nondestructive Examination
Missed surveillance
Systematic Assessment of Licensee Performance
Fire Protection Program
Scaffolding
IR 05000018/198700123 September 1987Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program
ML20234D24815 September 1987Notice of Violation from Insp on 870810-17.Violation Noted: Licensee Failed to Apply QA Program to Provide Control Over Activities Affecting Quality of Sys Consistent W/Importance to Safety
ML20234D25310 September 1987Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered27 July 1987PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
IR 05000263/19870088 June 1987Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing
IR 05000293/198700517 February 1987Insp Rept 50-293/87-05 on 870112-17.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Ie Bulletin 83-02 & Generic Ltr 84-11,inservice Insp Activities Including Review of Procedures & Licensee Action Re Oyster CreekWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
PNO-III-87-009, on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc14 January 1987PNO-III-87-009:on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc
PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected7 January 1987PNO-III-87-004:rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected
ML20212F55124 December 1986Notice of Violation from Insp on 861103-12Annual Radiological Environmental Operating Report
IR 05000259/198603715 December 1986Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals
IR 05000269/198603210 December 1986Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate SurveysAnnual Radiological Environmental Operating Report