Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML24003A181 | 8 January 2024 | Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 | |
ML23345A036 | 11 December 2023 | ATWS Uet December 11, 2023 Pre-submittal Meeting Slides | Probabilistic Risk Assessment Large early release frequency |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23272A062 | 29 September 2023 | Ultimate Heat Sink Temperature Tech Spec Limit Change | Ultimate heat sink |
ML23262B260 | 19 September 2023 | Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout | |
ML23251A078 | 6 September 2023 | DRE1 Decom Pre-Submittal Slides | FLEX Aging Management Exemption Request |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23170A008 | 29 June 2023 | Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 | |
ML23172A209 | 28 June 2023 | LRA - NRC Pre-Submittal Meeting Slides | |
ML23172A210 | 28 June 2023 | CPS Lr Pre-Submittal Meeting Presentation | Coatings Aging Management |
ML23145A134 | 14 June 2023 | June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides | Probabilistic Risk Assessment License Renewal Power Uprate |
ML23165A016 | 14 June 2023 | June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides | Environmental Justice |
ML23163A164 | 12 June 2023 | 2022 Braidwood/Byron End-of-Cycle Meeting Presentation | |
ML23157A035 | 6 June 2023 | Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides | |
ML23103A407 | 13 April 2023 | Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative | Weld Overlay Dissimilar Metal Weld |
ML23094A149 | 11 April 2023 | Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 | Exemption Request COVID-19 |
ML23080A297 | 21 March 2023 | Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative | Weld Overlay |
ML23076A044 | 16 March 2023 | Pb U2 Scram Barrier Presentation KT Session | Internal Flooding |
ML23053A156 | 23 February 2023 | NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML23076A281 | 23 February 2023 | Licensee Presentation on Pressure Boundary Process | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Large early release frequency License Renewal |
ML23076A282 | 23 February 2023 | Licensee Presentation on Defense-in-Depth Process | Internal Flooding |
NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | 21 February 2023 | Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML23033A667 | 30 January 2023 | Public Call with Constellation January 30, 2023 (Slides) | |
ML23006A257 | 10 January 2023 | Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) | Water Inventory Control Operator Manual Action Exemption Request |
ML22347A153 | 13 December 2022 | Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request | |
ML22319A001 | 14 November 2022 | Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC | Incorporated by reference |
ML22305A592 | 3 November 2022 | Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated | Safe Shutdown High winds |
ML22301A013 | 3 November 2022 | Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments | |
ML22250A437 | 8 September 2022 | NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline | |
ML22249A097 | 8 September 2022 | Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting | Water Inventory Control Surveillance Frequency Control Program |
ML22249A220 | 6 September 2022 | Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 | Safe Shutdown Earthquake Incorporated by reference Scram Discharge Volume Earthquake |
ML22222A112 | 4 August 2022 | NMP1 Torus Corrosion Presentation for August 2022 Final | Finite Element Analysis |
ML22195A217 | 12 July 2022 | D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted | |
ML22164A808 | 13 June 2022 | Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 | |
ML22153A360 | 9 June 2022 | Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project | Safe Shutdown Earthquake Operating Basis Earthquake Incorporated by reference Scram Discharge Volume |
ML22159A333 | 9 June 2022 | Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting | Coronavirus |
ML22187A065 | 8 June 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides | Coronavirus |
ML22124A148 | 10 May 2022 | (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) | |
ML22124A149 | 10 May 2022 | (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) | |
ML22076A194 | 23 March 2022 | Constellation Presentation March 23, 2022 NRC Di_C Workshop | |
ML22080A152 | 21 March 2022 | Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 | Water Inventory Control Safe Shutdown Earthquake Temporary Modification Incorporated by reference Scram Discharge Volume Earthquake |
ML22028A011 | 31 January 2022 | Slides for Fbra Pre-submittal Meeting of 2022-01-31 | Tornado Missile Tornado Missile Protection |
ML22013A394 | 13 January 2022 | Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System | |
ML22010A069 | 10 January 2022 | Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides | |
ML21335A077 | 7 December 2021 | Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
ML21320A067 | 17 November 2021 | NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides) | Aging Management Pressure and Temperature Limits Report |
ML21294A369 | 15 November 2021 | Summary of October 6, 2021, Public Observation Meeting with Exelon Generation Company, LLC Proposed License Amendment Request to Modify Emergency Diesel Generator and Emregency Core Cooling System Surveillance Requirements | Probabilistic Risk Assessment Surveillance Frequency Control Program Power change |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |