Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides Project stage: Request ML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure Project stage: Request PMNS20220271, Meeting with Constellation Energy Generation, LLC Regarding Defense-in-Depth and Diversity Common Cause Failure Coping Analysis Request for Limerick Generating Station, Units 1 and 22022-03-17017 March 2022 Meeting with Constellation Energy Generation, LLC Regarding Defense-in-Depth and Diversity Common Cause Failure Coping Analysis Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML22084A1142022-03-25025 March 2022 Supplement to Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1, February 2022 Project stage: Request PMNS20220709, Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units2022-07-22022 July 2022 Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units 1 an Project stage: Request ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital Project stage: Request PMNS20221157, Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request2022-11-0707 November 2022 Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML23009A5622022-11-0707 November 2022, 14 November 2022, 11 January 2023 Summary of December 15, 2022 Public Meeting on Limeric Digital I&C LAR Acceptance Project stage: Request ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC Project stage: Request ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22333A8172022-11-29029 November 2022 Response to Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests for the Limerick Generating Station Project stage: Supplement ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22339A0642022-12-0909 December 2022 Generation Station, Unit Nos. 1 and 2 Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Acceptance Review ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request Project stage: Meeting ML23003A1702022-12-15015 December 2022 Official Transcript of the 12/15/22 Meeting with Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE 603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Project stage: Meeting ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Meeting ML22353A6322023-01-17017 January 2023 Supplement to Regulatory Audit Plan in Support of Review of Digital I&C Upgrade to Protection Systems (EPID L-2022-LLA-0140) - Non-Proprietary Project stage: Other PMNS20230026, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-01-20020 January 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1062023-01-20020 January 2023, 12 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23032A2442023-02-0606 February 2023 Regulatory Audit Plan for Review of Human Factors Engineering Portion of Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Other ML23046A2662023-02-15015 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement PMNS20230032, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-02-23023 February 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23121A0042023-03-0606 March 2023, 12 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230033, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-0606 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230254, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-17017 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3792023-03-17017 March 2023, 9 June 2023 April 12, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23095A2232023-04-0505 April 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors Project stage: Supplement PMNS20230423, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-04-17017 April 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23132A3092023-04-17017 April 2023, 18 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230627, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-15015 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A4172023-05-16016 May 2023, 9 June 2023 Summary of May 24, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230606, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-16016 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . Project stage: Supplement ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Other ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request Project stage: Meeting ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Other ML24026A2922024-01-26026 January 2024 Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request Project stage: RAI 2023-01-20
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides ML21294A3692021-11-15015 November 2021 Summary of October 6, 2021, Public Observation Meeting with Exelon Generation Company, LLC Proposed License Amendment Request to Modify Emergency Diesel Generator and Emregency Core Cooling System Surveillance Requirements ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21174A0852021-06-23023 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21063A1192021-03-0404 March 2021 Digital Modernization Project LAR Pre-submittal Meeting - March 16, 2021 (EPID L-2020-LRM-0041) (Slides) ML21049A3102021-02-19019 February 2021 CFR 50.69 Alternative Categorization LAR ML21034A6032021-02-0303 February 2021 External Presentation Am Connelly_ISG-6 Workshop Presentation ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20162A0192020-06-10010 June 2020 NRC Staff Presentation for June 12, 2020, Public Pre-Application Meeting: ISG-06 Alternate Review Process Lessons Learned from Pre-Application Meetings ML20160A0532020-06-0808 June 2020 Digital Modernization Project LAR - Presubmittal Meeting - NRC Presubmittal Meeting Telecon June 12, 2020 ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18142A3872018-05-22022 May 2018 05 - BWR OE Presentation 2024-01-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22195A2172022-07-12012 July 2022 D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides ML21294A3692021-11-15015 November 2021 Summary of October 6, 2021, Public Observation Meeting with Exelon Generation Company, LLC Proposed License Amendment Request to Modify Emergency Diesel Generator and Emregency Core Cooling System Surveillance Requirements ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 ML21294A3792021-10-0606 October 2021 WCAP-17308 Implementation Licensing Amendment Request Pre-Submittal Meeting Presentation, October 6, 2021 ML21175A1732021-06-29029 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21174A0852021-06-23023 June 2021 Digital Modernization Project LAR Pre-submittal Meeting ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21063A1192021-03-0404 March 2021 Digital Modernization Project LAR Pre-submittal Meeting - March 16, 2021 (EPID L-2020-LRM-0041) (Slides) ML21049A3102021-02-19019 February 2021 CFR 50.69 Alternative Categorization LAR ML21034A6032021-02-0303 February 2021 External Presentation Am Connelly_ISG-6 Workshop Presentation ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20162A0192020-06-10010 June 2020 NRC Staff Presentation for June 12, 2020, Public Pre-Application Meeting: ISG-06 Alternate Review Process Lessons Learned from Pre-Application Meetings ML20160A0532020-06-0808 June 2020 Digital Modernization Project LAR - Presubmittal Meeting - NRC Presubmittal Meeting Telecon June 12, 2020 ML19304A8752019-11-0505 November 2019 Presentation Slides for Limerick/Nrc Pre-Submittal Meeting (Technical Specification 4.05 License Amendment Request) - November 5, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18142A3872018-05-22022 May 2018 05 - BWR OE Presentation 2024-01-30
[Table view] |
Text
Limerick Generating Station Digital Modernization Project LAR Technical Specifications Changes NRC Pre-submittal Meeting January 11, 2022 Exelon~
Agenda / Opening Remarks
-Introductions
-Response to NRC feedback from December 7, 2021 presubmittal meeting
-Follow-up item from December 7, 2021 presubmittal meeting
-Changes from December 7, 2021 presentation
-Next Steps 1 : ' Exelon.
Introductions - Exelon Project Team
- Darani Reddick, Licensing Director
- Dave Helker, Licensing Manager
- Frank Mascitelli, Licensing Lead
- Pareez Golub, Digital Licensing SME
- Brian Mann, Technical Specifications SME
- John Connelly, Central Design Organization (CDO) Manager
- Mark Samselski, CDO - Lead Responsible Engineer
- George Bonanni, CDO - Senior Staff Engineer
- Mike Foote, CDO - Senior Staff Engineer
- Scott Schumacher, Systems Engineering (continued) 2 : ' Exelon.
Introductions - Exelon Project Team
- Steve Hesse, Project Director
- Dave Molteni, Senior Manager and Station Lead
- Jerry Segner, Principal Project Manager
- Kayla Marriner, Project Manager
- Paul Krueger, Operations (continued) 3 : ' Exelon.
Introductions - Westinghouse Project Team
- Tom Pietryka, Program Manager
- Terry Tuite, PPS Lead - Engineering
- Warren Odess-Gillett, Lead - Licensing
- Cal Tang, BWR Technical Advisor 4 : ' Exelon.
Response to NRC feedback from Dec 7, 2021 Presubmittal Meeting 5 : ' Exelon.
Item 1 How 3 channels (2 out of 3 channel logic vs. 2 out of 4) meets all design requirements. The NRC staff agrees that the 2 of 3 condition represents a system that is capable of performing its safety functions however, there remains a question of whether a system in this state continues to meet all design requirements. In particular, the single failure criteria of IEEE 603 or IEEE 279 in conjunction with surveillance testing requirements does not appear to be satisfied with a system in this condition. Refer to IEEE 279 clause 4.11, During such operation the active parts of the system shall of themselves continue to meet the single failure criterion. Bullet 4 on slide 21 of Exelons December 7th presentation states:
Only three channels are needed to meet all design requirements for voted channels.
Please explain how a system in this state meets single failure criteria when a channel is out of service for surveillance testing purposes. Under the new TS, one channel can be removed for testing or otherwise be inoperable within entering an Action (as stated on 7th bullet of slide 21).
6
Single Failure Criterion (SFC)
- The safety systems shall perform all safety functions required for a design basis event in the presence of: (1) any single detectable failure within the safety systems concurrent with all identifiable but non-detectable failures; (2) all failures caused by the single failure; and (3) all failures and spurious system actions that cause or are caused by the design basis event requiring the safety functions.
- The PPS is designed to meet the SFC with 3 channels
- Channel 1: Detectable Failure - Channel defaults to trip condition on failure
- Channel 2: Undetectable Failure - Channel may not respond to trip condition
- Channel 3: Functioning Channel
- 3 Operable Channels with 2oo3 logic meets design requirements for SFC (e.g., Channels 1 and 3 trip the reactor with single failure) 7 : ' Exelon.
Item 2.a Demonstrating three channels provides lowest functional capability of the system.
- In absence of a limiting condition for operability, operation of the system with only three functioning channels would need to demonstrate not only functional capability but would also have to show compliance with the performance criteria of IEEE 279 or IEEE 603 which include maintaining single failure criteria during periodic surveillance testing activities during which only two channels would remain operable. The NRC staff referred to several TS examples for plants with similar designs that include limiting conditions for operability that must be considered during the time in which the safety system is in a 2 of 3 logic condition. Though the LCO times vary significantly between plants, all of the example TSs include descriptions of conditions of operation that must be considered when the system is in a 2 of 3 configuration.
8
Test Capability with 3 channels
- Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions. The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function.
- The PPS is designed to meet this criterion with 3 channels
- Channels 2 - 4 required and operational (i.e., LCO is met)
- For example, to test Channel 2:
- Channel 1 is placed into the trip condition and TS Action is entered,
- Channel 2 bypassed for testing,
- A trip signal from Channel 3 or 4 initiates a reactor trip (2oo3)
TS Actions represent a temporary relaxation of the single failure criteria.
9
Item 2.b Please provide a description using a staged approach to loss of protection channels, and associated example Action Statements for required actions to take in the event of a loss of one of the four channels, and then for a loss of two channels, and then for a loss of two or more of the four channels of the Plant Protection System. Describe the minimum number of channels that are required to be operable for each of the Modes of Operation. Demonstrate how the design meets the requirements of IEEE 603. For example, for operations with three operable channels, describe how the design requirements of IEEE 603 are still being met if one more channel becomes inoperable.
10 : ' Exelon.
Response to Item 2.b The required number of channels will be specified in the TS for each Operating Condition.
The LAR will describe the Actions for loss of one or more TS required channels and why the Actions are appropriate for the condition.
11 : ' Exelon.
Item 3 Reestablish basis for continued elimination of previously removed response times from the TS.
The NRC staff pointed out that if the licensee wants to retain the existing exemption from time response testing provisions, they will need to review the bases for these exemptions. If the replacement system diagnostic functions are to be credited in lieu of the current calibration and functional test surveillance tests as described in the licensees presentation, then a new basis for these time response test exemptions may need to be established. If a basis for these exemptions is not reestablished in the LAR, then the TR test exemptions may become invalid and new test requirements would be needed.
Please discuss how the proposed relocation satisfies Criterion 2 and 3 of 10CFR 50.36(c)(2)(ii),
which require an LCO to be included in the TSs:
- Criterion 2- A process variable, design feature, or operating restriction that is an initial condition of a design basis accident (DBA) or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier; and
- Criterion 3 - A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
12
Response to Item 3 No response time testing is being eliminated in the LAR. All functions that currently require response time testing will continue to be tested.
The current TS permits using assigned response times for some components in a function. The LAR will describe the basis for the existing allocated times and justify that the basis is still valid.
Credit for existing TS surveillance tests that verify sensor functionality is one of the bases for allowing this exclusion. Although Channel Check, Channel Functional Testing, and Logic System Functional Testing are being eliminated by PPS self-diagnostics, the PPS application diagnostic Channel Comparison performs the same automatic function as the manual Channel Check. This PPS application diagnostic can detect sensor malfunction by comparing sensors across four channels and annunciating when a channel sensor is deviating. The LAR will describe that the application diagnostic, Channel Comparison, and the new Sensor Channel Calibration provide sufficient verification of the operability of the sensors currently eliminated from response time testing.
The LAR will also justify using assigned response times for additional portions of the tested functions performed by the digital platform.
The relocation of the response time limits to licensee control follows the NRC guidance in Generic Letter 93-08, Relocation of Technical Specification Tables of Instrument Response Time Limits.
Criterion 2 and 3 of 10 CF 50.36(c)(2)(ii) describe requirements for establishing LCOs. The proposed changed does not alter the LCO requirement that structures, systems, and components respond within the assumed response time.
13 : ' Exelon.
Item 4 Please describe any potential impact on each ESFAS Actuation System LCOs/surveillance requirements and ECCS System-Level LCOs/surveillance requirements (i.e., RCIC, ECCS and NSSSS system) based on operability of the Plant Protection System. For example, what will be the limiting conditions for operation of HPCI, RCIC, ADS, Core Spray A, Core Spray B, NSSSS Isolation, etc. based on the operability condition of the Plant Protection System with one or more, and then two or more channels INOP?
14 : ' Exelon.
Response to Item 4 The proposed TS 3.3.2, "Plant Protection System Divisions," will contain TS Actions that recognize the impact of inoperable divisions on actuated equipment. The LAR will describe and justify that the TS contain appropriate mitigating actions for the specific degradation.
No changes to the actuated system TS (HPCI, RCIC, ADS, Core Spray, Primary Containment Isolation Valves, etc.) will be proposed.
15 : ' Exelon.
Item 5 Please describe any potential impact associated with the surveillance testing requirements for each of the Manual Initiation Functions at the system level for each subsystem of the ECCS/NSSSS systems. Which portions of the circuits for manual initiation are covered by these surveillance tests?
16 : ' Exelon.
Response to Item 5 The LTR SR Elimination Appendix will include the analysis of those manual actuations credited in the Safety Analysis.
For those manual actuations credited in the safety analysis:
- The LTR will evaluate the equipment in the manual actuation path and the self-diagnostics that cover that equipment
- Equipment not covered by the self-diagnostics will require some periodic test that will confirm operability 17 : ' Exelon.
Follow-up item from December 7, 2021 Presubmittal Meeting 18 : ' Exelon.
Additional Allowable Value Limits NRC/Summer Sun question:
NRC described that in some ITS conversions for ECCS, licensee added additional Allowable Values associated with the relocation of the trip setpoints or added a new upper or lower Allowable Value.
NRC asked if Limerick, similarly, intended to do add Allowable Values.
Exelon response:
We discussed the question with the Excel Services ITS conversion team and reviewed four of the most recent ITS conversions that relocated trip setpoints to licensee control. Excel could not recall, nor could we find any instances in which a licensee added additional Allowable Values associated with the relocation of the trip setpoints or added a new upper or lower Allowable Value.
We reviewed the LGS TS and did not discover any instrumentation functions with a two-sided limit for the trip setpoint and a single-sided limit for the Allowable Value.
A review of the Standard TS for BWR/4 plants (NUREG-1433) did not discover any functions with two-sided Allowable Values that had an equivalent function in the LGS.
Therefore, we do not believe this is an issue for the LSG LAR.
19
Changes from December 7, 2021 Presentation 20 : ' Exelon.
Changes from December 7, 2021 Presentation In the December presentation on Slides 18 and 25, we stated that the new TS would include a specification 3.3.3, "Reactor Trip Units," which would provide requirements on the trip system from the division reactor trip matrix through the scram valves. On further review, we've determined that a new TS is not required and the existing requirements in Specification 3.1.3.1, "Control Rod Operability," and a new SR in the new TS 3.3.2, "Plant Protection System Divisions," will provide "end-to-end" verification of the operability of the reactor trip system.
21 : ' Exelon.
Next Steps 22 : ' Exelon.
Next Steps
- Determine any follow-up topics for the next NRC presubmittal meeting.
23 : ' Exelon.
Thank you 24 : ' Exelon.