MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensees Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L 2024-05-16
[Table view] |
Text
Calvert Cliffs Nuclear Power Plant Control Element Assembly Recovery Time Improvement Project LAR NRC Pre-submittal Meeting May 10, 2022 Proprietary (Redacted Version)
- Framatome Topical Report ANP-3915P, Calvert Cliffs Misaligned CEA Evaluation
- Framatome performed calculations that validate extended operation at reduced power level with a single misaligned regulating rod.
- [ The Framatome analysis considered the following conditions:
- Hot Full Power Initial-State (most limiting)
- Five (5) times in life (BOC, Early-MOC, MOC, Late-MOC and EOC)
- Location of the misaligned CEA
- Time spent at full power before power reduction (COLR Limit)
- Time at reduced power condition
- Analysis through duration of CEA recovery ]
Supporting Framatome Analysis Summary CEA Recovery Time Improvement Privileged and Confidential 1
FRAMATOME PROPRIETARY
Supporting Framatome Analysis Summary (cont.)
CEA Recovery Time Improvement Privileged and Confidential 2
- Analysis validated a reduction to 60% Reactor Thermal Power (RTP) provided adequate margin for safe operation
- [ FR T behavior for the analyzed conditions meet FR T LCO during operation at 60%
RTP
- Extended operation for up to 7 days
- 60% RTP must be maintained until the dropped CEA is fully recovered. ]
- After the recovery of the misaligned CEA
- [ Reactor can return to full power using vendor supported ramp rate limits
- Evaluation of FR T until the return of steady state conditions ]
- [ All LCOs must be met, including required actions, during the CEA misalignment and recovery ]
FRAMATOME PROPRIETARY
LAR Acceptance and Review CEA Recovery Time Improvement Privileged and Confidential 3
- The Framatome ANP-3915P Licensing Report summarizes the methodology and approach and will be submitted by Constellation with the LAR
- We intend to provide the detailed Framatome ANP-3915P Analysis Report to the NRC for review via a secure website FRAMATOME PROPRIETARY