Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000354/1999005 | 1 October 1999 | Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification | Safe Shutdown Fire Barrier Fire impairment Significance Determination Process Operability Determination Maintenance Rule Program Continuous fire watch Fire Watch Hourly Fire Watch |
IR 05000354/1999004 | 11 August 1999 | Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification | |
IR 05000354/1999003 | 21 June 1999 | Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Operability Determination |
IR 05000354/1999002 | 14 May 1999 | Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support | Shutdown Margin Condition Adverse to Quality Corrosion bonding Double blade guide |
IR 05000354/1999001 | 19 April 1999 | Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support | High Radiation Area Nondestructive Examination Missed surveillance Foreign Material Exclusion Excess Flow Check Valve |
IR 05000272/1999001 | 1 April 1999 | Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown High Radiation Area Fire Barrier Condition Adverse to Quality Maintenance Rule Program Biofouling Unidentified leakage |
IR 05000354/1998011 | 22 December 1998 | Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support | Packing leak High Radiation Area Operability Determination |
IR 05000354/1998010 | 23 November 1998 | Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering | High Radiation Area Temporary Modification Operability Determination Maintenance Rule Program |
IR 05000354/1998008 | 9 October 1998 | Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | High winds Shutdown Margin High Radiation Area Temporary Modification Condition Adverse to Quality Operability Determination Downpower |
IR 05000354/1998009 | 2 October 1998 | Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering | Safety Limit Minimum Critical Power Ratio Ultimate heat sink Temporary Modification Emergency Lighting Battery sizing Fire Protection Program |
IR 05000354/1998007 | 25 August 1998 | Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Ultimate heat sink Emergency Lighting Process Control Program Operability Determination Fire Protection Program |
IR 05000354/1998006 | 21 July 1998 | Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Hot Short Boric Acid Enforcement Discretion Operability Determination |
IR 05000272/1998202 | 9 July 1998 | Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities | |
IR 05000354/1998080 | 10 June 1998 | Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering | Safe Shutdown Unanalyzed Condition Ultimate heat sink Temporary Modification Emergency Lighting Condition Adverse to Quality Missed surveillance Operability Determination Battery sizing Fire Protection Program |
IR 05000354/1998005 | 4 June 1998 | Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Ultimate heat sink Excess Flow Check Valve Scaffolding |
IR 05000354/1998002 | 23 April 1998 | Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program | Fire Barrier Temporary Modification Operability Determination Continuous fire watch Fire Protection Program Fire Watch Overexposure |
IR 05000354/1998001 | 16 March 1998 | Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Hydrostatic Past operability Condition Adverse to Quality Excess Flow Check Valve Operability Determination Scaffolding Grace period Operability Assessment |
ML20199L532 | 3 February 1998 | Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Half scram Ultimate heat sink Enforcement Discretion Anchor Darling Temporary Modification Condition Adverse to Quality |
ML20197D211 | 10 December 1997 | Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs | Unanalyzed Condition Fitness for Duty Shutdown Margin Ultimate heat sink Non-Destructive Examination Weld Overlay Condition Adverse to Quality Foreign Material Exclusion Scram Discharge Volume Through Wall Leak |
ML20199D343 | 13 November 1997 | Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | Half scram Weld Overlay Hydrostatic Nondestructive Examination Temporary Modification VT-2 Design basis earthquake Scram Discharge Volume Earthquake Liquid penetrant Through Wall Leak Grace period |
IR 05000354/1997005 | 15 September 1997 | Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support | |
IR 05000354/1997006 | 4 September 1997 | Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering | Ultimate heat sink Enforcement Discretion Biofouling |
ML20210N913 | 11 August 1997 | Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Ultimate heat sink Temporary Modification Foreign Material Exclusion Process Control Program Power change |
ML20140J387 | 12 June 1997 | Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Temporary Modification Condition Adverse to Quality Annual Radiological Environmental Operating Report Scaffolding |
ML20148D230 | 23 May 1997 | Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted | Temporary Modification Scaffolding |
ML20137W781 | 14 April 1997 | Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support | Time of Discovery Half scram Ultimate heat sink Internal Flooding Anchor Darling Condition Adverse to Quality Fire Protection Program Scaffolding |
ML20135A390 | 21 February 1997 | Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support | |
IR 05000272/1997003 | 5 February 1997 | Attachment to Insp Repts 50-272/97-03 & 50-311/97-03 ,consisting of 970205 Slide Presentation Inadvertently Omitted from Repts | |
IR 05000354/1996010 | 27 January 1997 | Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan | Unanalyzed Condition Ultimate heat sink Stroke time Squib Foreign Material Exclusion Through-Wall Leak Operability Assessment |
IR 05000354/1996009 | 5 December 1996 | Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Safe Shutdown Unanalyzed Condition Half scram Grab sample Temporary Modification Squib Annual Radioactive Effluent Release Report Battery sizing Scaffolding |
IR 05000272/1996013 | 3 December 1996 | Insp Repts 50-272/96-13 & 50-311/96-13 on 960812-0920. Violations Noted.Major Areas Inspected:Engineering Performance Issues That Require Resolution Prior to Plant Restart | Safe Shutdown Temporary Modification Emergency Lighting Foreign Material Exclusion Operability Determination Fire Protection Program |
ML20129D089 | 18 October 1996 | Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | Grab sample Hydrostatic Past operability Process Control Program Fire Watch |
IR 05000354/1995015 | 14 February 1996 | Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process | Reactor Vessel Water Level High Radiation Area Excess Flow Check Valve |
ML20084L769 | 30 May 1995 | Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 | Offsite Dose Calculation Manual Temporary Modification |
IR 05000354/1993023 | 15 December 1993 | Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings | |
IR 05000354/1992019 | 15 December 1992 | Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition | Earthquake |
IR 05000354/1991013 | 21 June 1991 | Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation | Temporary Modification Scaffolding |
IR 05000354/1990013 | 26 July 1990 | Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined | Nondestructive Examination Liquid penetrant |
IR 05000354/1990015 | 19 July 1990 | Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls | |
ML20246C400 | 15 August 1989 | Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 | |
IR 05000354/1989013 | 20 July 1989 | Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys | |
IR 05000354/1989011 | 10 July 1989 | Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup | Packing leak High Radiation Area |
IR 05000354/1989009 | 10 May 1989 | Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup | High Radiation Area Scaffolding Grace period Inattentive |
ML20247B665 | 9 May 1989 | Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs | Ultimate heat sink Temporary Modification Scaffolding |
IR 05000354/1989002 | 31 March 1989 | Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support | Packing leak Temporary Modification |
IR 05000354/1989006 | 29 March 1989 | Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training | Fire Barrier Fire Protection Program |
IR 05000354/1989005 | 23 March 1989 | Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing | High Radiation Area |
IR 05000354/1989003 | 28 February 1989 | Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements | Liquid penetrant |
IR 05000354/1988023 | 1 November 1988 | Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support | Missed surveillance Grace period Inattentive |
IR 05000354/1988020 | 24 October 1988 | IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate | Water level shrink Emergency Lighting Scram Discharge Volume Fire Protection Program |