Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20154C413 | 21 September 1998 | Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 | |
ML20237B156 | 7 August 1998 | Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ | |
ML20249A245 | 4 June 1998 | Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written | |
ML20216H605 | 6 April 1998 | Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced | |
ML20203F592 | 23 February 1998 | Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control | Safeguards Contingency Plan |
IR 07100102/2012013 | 12 January 1998 | Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents | |
ML20199B157 | 5 January 1998 | Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour | |
ML20203M447 | 5 January 1998 | Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect | |
ML20198N470 | 20 October 1997 | Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 | Eddy Current Testing |
ML20212A036 | 8 October 1997 | Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit | |
ML20211K943 | 26 September 1997 | Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility | Safeguards Contingency Plan |
ML20149L570 | 28 July 1997 | Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry | |
ML20149G677 | 16 June 1997 | Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 | |
ML20148B962 | 5 May 1997 | Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings | Unanalyzed Condition |
ML20137V138 | 24 March 1997 | Notice of Violation from Insp on 970112-0222.Violation Noted:Licensee Failed to Implement Appropriate Emergency Procedures,Conduct Required Drills or Renew Exemptions to Be Excluded from Stated Requirements | |
ML20134L121 | 10 February 1997 | Notice of Violation from Insp on 961201-970111.Violation Noted:Inspector Identified Modification Involving Installation of Addl Vital Area Physical Barrier | Temporary Modification |
ML20135C241 | 15 November 1996 | Notice of Violation from Insp on 960908-1019.Violation Noted:Plant Periodic Test Procedure,Annulus Ventilation Sys Train B Operability Test Not Adequate | |
ML20128H663 | 2 October 1996 | Notice of Violation from Insp on 960728-0907.Violation Noted:Licensee Failed to Demonstrate Operability of 1A EDG within Required Time After 1B EDG Was Determined to Be Inoperable | Operability Determination |
ML20059C026 | 16 December 1993 | Notice of Violation from Insp on 931017-1120.Violation Noted:On 930909,remote Visual QA Exam Performed on Weld of Tube Plug 39-72 in Unit 1 a Steam Generator Inadequate | |
ML20059K722 | 9 November 1993 | Notice of Violation from Insp on Stated Date.Violation Noted:Loss of Normal Letdown Charging or Seal Injection Flow Procedure Was Inadequate Since Failed to Require Any Cautions,Instructions or Guidance | |
ML20059K429 | 20 October 1993 | Notice of Violation from Insp on 930822-0925.Violation Noted:Vendors Replacing Roof on Unit 1 Fuel Handling Building Failed to Adhere to Requirements to Use Fire Extinguishers & Obtain Hot Work Permit | Fire Protection Program |
ML20057C161 | 14 September 1993 | Notice of Violation from Insp on 930718-0821.Violation Noted:Surveillance Procedures PT/1/A/4350/36A & PT/1/A/4350/36B Were Not Revised to Incorporate Changes to TS 4.8.1.1.2.e | |
ML20056G901 | 19 August 1993 | Notice of Violation from Insp on 930621-25 & 0729.Violation Noted:Loss of Offsite Power Event on Unit 1 Occurred on 910211 for Which Licensee Failed to Immediatley Declare Notification of Unusual Event | |
ML20056E474 | 12 August 1993 | Notice of Violation from Insp on 930628-0702 & 930712-16. Violation Noted:Licensee Failed to Notify NRC of Change in Medical Status of Licensed Operators within 30 Days as Required,Per 10CFR55.25 & 10CFR50.74 | |
ML20056E317 | 9 August 1993 | Notice of Violation from Insp on Stated Date.Violation Noted:Licensee Had No Specific Procedure in Place Nor Any Preventative Maint Schedule Developed for Lake Level Instrumentation,For Purpose of Entering Emergency Plan | |
ML20127P733 | 13 January 1993 | Notice of Violation from Insp on 921115-1219.Violation Noted:On 921105,licensee Completed PIR-0-M92-0140 W/O Identifying Root Cause or Actions Necessary to Prevent Recurrence | |
ML20217B873 | 19 February 1991 | Notice of Violation from Insp on 910106-0202.Violation Noted:Measures Not Adequate to Assure Prompt Corrective Action Taken in Correction of Generic Fuse Installation Problems Originally Identified in March 1989 | |
ML20056A584 | 24 July 1990 | Notice of Violation from Insp on 900522-0625.Violations Noted:Both Units Operated W/Two of Four Control Room Ventilation (VC) Sys Intakes Closed from 900525-0603 & Failure to Report Inoperable VC Trains in Required Time | |
ML20246N647 | 21 August 1989 | Notice of Violation from Insp on 890707-18.Violation Noted: Core Operated in Excess of 102% of 3,411 Thermal MW Limit Briefly & in Excess of 101% for Nearly 3 H | |
ML20245L428 | 8 August 1989 | Notice of Violation from Insp on 890622-28.Violation Noted: Design Control Measures for Changes to Plant Inadequate, Leading to Confusing Instructions to Craft Personnel Which Resulted in Installation of nonsafety-related Positioner | |
ML20236E644 | 17 July 1989 | Notice of Violation from Insp on 890422-0601.Violation Noted:Procedures PT/1 & 2/A/4255/03A Deemed Inadequate in That Procedures Specified Testing of MSIVs W/Air Assist, Contrary to Assumed Conditions in FSAR | |
ML20244E586 | 8 June 1989 | Notice of Violation from Insp on 890330-0421.Violation Noted:Electrical Drawing MCM-1399.03-0300-001 Inadequate in That It Was Not Properly Updated Contributing to Personnel Error & Temporary Loss of RHR Sys on 881201 | |
ML20247N824 | 24 May 1989 | Notice of Violation from Insp on 890424-28.Violation Noted: 1987 Semiannual Effluent Release Rept Listed Two Abnormal Releases But Did Not Include Descriptions of Events | |
ML20246J651 | 5 May 1989 | Notice of Violation from Insp on 890213-17 & 0227-0303. Violations Noted:On 890215,maint Crew Observed Working on Work Request W/O Following Appropriate Procedure & with Inadequate Preplanning,Procedures & Instructions | |
ML20245G964 | 21 April 1989 | Notice of Violation from Insp on 890228-0329.Violation Noted:Failure to Follow Procedures Re Diesel Generator Starting Air Tank 1B2 Drain Valve | |
ML20244A880 | 30 March 1989 | Notice of Violation from Insp on 890120-0227.Violations Noted:Control Room Door Seals Repaired on 890117 W/O Authorization on Work Request & Auxiliary Feedwater Resistance Temp Detectors Installed W/O Authorized Request | |
ML20235P522 | 14 February 1989 | Notice of Violation from Insp on 881122-890119.Violation Noted:Procedure Not Properly Implemented in That 1A Emergency Diesel Generator Started on 881206 Using 2A Emergency Diesel Generator Test Procedure | |
ML20206A555 | 4 November 1988 | Notice of Violation from Insp on 880924-1020.Violation Noted:Personnel Training Not Completed Prior to Returning low-Tave Setpoint Circuitry to Svc Following Setpoint Change & Unit Not Placed in Hot Shutdown within 6 H | |
ML20154F980 | 6 September 1988 | Notice of Violation from Insp on 880723-0819.Violation Noted:Procedure OP/2/A/6250/02, Auxiliary Feedwater Sys, Step 2.5 Not Performed as Written & Procedure Not Written & Procedure PT/2/A/4204/05 Inadequate | |
ML20151Z874 | 19 August 1988 | Notice of Violation from Insp on 880625-0722.Violations Noted:Procedure for Steam Generator Cold Wet Lay Up Recirculation Inadequate in That Performance of Procedure Caused ESF Actuation | |
ML20151E604 | 8 July 1988 | Notice of Violation from Insp on 880521-0624.Violation Noted:Maint Personnel Adjusted Fuel Racks on Diesel Generator 2A to Increase Output W/O Work Request or Procedure | |
ML20195C848 | 9 June 1988 | Notice of Violation from Insp on 880502-06.Violation Noted: ASME Code Section XI Stroke Time Tests Performed in Manner That Could Be Unduly Affected by Changes in Measurements & Instruments,Contrary to Tech Spec 4.0.5,in Oct 1987 | Stroke time |
ML20155J331 | 6 June 1988 | Notice of Violation from Insp on 880423-0520.Violation Noted:Procedure PT/1/A/4252/01, Auxiliary Feedwater Pump Number 1 Performance Test Inadequate in That Horizontal Vibration Ranges Did Not Correspond to Required Ranges | Safe Shutdown Fire Barrier Operability Determination Continuous fire watch Fire Watch Hourly Fire Watch |
ML20153F516 | 29 April 1988 | Notice of Violation from Insp on 880319-0422.Violation Noted:Procedure PT/O/A/4150/05 Not Properly Implemented & Procedure PT/2/A/4200/28A Not Properly Maintained | |
ML20148H170 | 10 March 1988 | Notice of Violation from Insp on 880121-0226.Violation Noted:Procedure IP/O/A/3061/08 Not Properly Implemented & Procedure for Removing Cation Bed Demineralizer from Svc Not Properly Maintained | |
ML20149M122 | 19 February 1988 | Notice of Violation from Insp on 871121-880120.Violations Noted:Written Procedures Covering Operation & Maint of safety-related Equipment Not Established,Implemented & Maintained Causing Reactor Trip & Sys Actuation on 871228 | |
ML20149D615 | 4 February 1988 | Notice of Violation from Insp on 871107-880113.Violation Noted:Test Program Established to Demonstrate That Component Cooling Sys Will Perform Satisfactorily in Svc Not Adequate | |
ML20149E199 | 15 January 1988 | Notice of Violation from Insp on 871215-18.Violation Noted:Failure to Rept Event within 30 Days of Occurrence in Period 870522-0611 | |
IR 07100021/2011020 | 28 December 1987 | Notice of Violation from Insp on 871021-1120.Violations Noted:Work Performed on Flow Instrument W/O Procedural Verification of safety-related Component & post-mod Test of Main Electrical Busline Exceeded Scope of Procedures | |
ML20236M292 | 28 October 1987 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violations Noted:Diesel Generator Inoperable for More than Allowed Tech Spec Limit & Operations Mgt Procedure Not Properly Implemented |