Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20205N98714 April 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11Safe Shutdown
Packing leak
High Radiation Area
Stroke time
Post Accident Monitoring
Operating Basis Earthquake
Temporary Modification
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Earthquake
Downpower
ML20207L56712 March 1999Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18Boric Acid
High winds
Shutdown Margin
High Radiation Area
Time to boil
Job Performance Measure
Deep Dose Equivalent
Downpower
Unidentified leakage
ML20207E6093 March 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26
ML20203G00812 February 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06
ML20236Y6308 August 1998Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld
ML20237A0017 August 1998Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl
ML20248L8629 June 1998Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld
ML20203M66823 February 1998Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 MemoAnticipated operational occurrence
ML20202E01425 November 1997Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially DeletedBoric Acid
Fitness for Duty
Foreign Material Exclusion
Fire Watch
Scaffolding
Stolen
Backfit
IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted25 November 1997Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially DeletedBoric Acid
Fitness for Duty
Foreign Material Exclusion
Fire Watch
Scaffolding
Stolen
Backfit
ML20211M5673 October 1997Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910
ML20205D42815 August 1997Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump
IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump15 August 1997Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump
ML20205M33328 July 1997Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow ProcedureFire Watch
Hourly Fire Watch
IR 05000335/199700517 July 1997Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116Foreign Material Exclusion
ML20149D78514 July 1997Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes
ML20202E02623 April 1997Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251Safe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
Packing leak
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Commercial Grade Dedication
Enforcement Discretion
Coatings
Nondestructive Examination
VT-2
Locked High Radiation Area
Foreign Material Exclusion
Process Control Program
Systematic Assessment of Licensee Performance
Operability Determination
Exemption Request
Maintenance Rule Program
Control of Heavy Loads
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Fire Protection Program
Scaffolding
Power change
Downpower
Operability Assessment
ML20137L29731 March 1997Forwards Matrix Containing Answer to Listed Questions in ,Rev 1Safe Shutdown
Boric Acid
Maintenance Rule Program
Fire Protection Program
ML20137R88327 March 1997Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing BasisSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Fire Barrier
Contraband
Past operability
Probabilistic Risk Assessment
Coatings
Temporary Modification
Fire Protection Program
Backfit
Unidentified leak
ML20137L09825 March 1997Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl
ML20137L23125 March 1997Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl
ML20137C92020 March 1997Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated EnforcementUnanalyzed Condition
ML20136E9266 March 1997Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222Fitness for Duty
Nondestructive Examination
Missed surveillance
Foreign Material Exclusion
Systematic Assessment of Licensee Performance
Liquid penetrant
Fire Protection Program
ML20136A92428 February 1997Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J GoldbergFire Barrier
Systematic Assessment of Licensee Performance
ML20134P59321 February 1997Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl
ML20132F54219 December 1996Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11Coast down
ML20137L27516 December 1996Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate EvaluationFitness for Duty
ML20136A6759 December 1996Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie
ML20137R53822 November 1996Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping
ML20136E62219 November 1996Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed
ML20136E69919 November 1996Requests Info Re Sheron St Lucie Visit.Info Requested by 961120Boric Acid
Fitness for Duty
Shutdown Margin
Packing leak
Grab sample
Fire Barrier
Stroke time
Commercial Grade Dedication
Missed surveillance
Foreign Material Exclusion
Through-Wall Leak
Fire Protection Program
Scaffolding
Downpower
ML20136E67918 November 1996Forwards Background Info on St Lucie Nuclear Instrumentation InspCondition Adverse to Quality
ML20136E68818 November 1996Forwards Background Info on St Lucie Nuclear Instumentation InspCondition Adverse to Quality
ML20136E60815 November 1996Provides List of Corrective Actions That Have Been Rolled Into Speakout Program
ML20136E54614 November 1996Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93
ML20136E49113 November 1996Forwards Updated Schedule for St Lucie FY1
ML20140E65912 November 1996Provides Revs of Plant Violations for Current HourSafe Shutdown
Boric Acid
Shutdown Margin
Probabilistic Risk Assessment
Fire Protection Program
Fire Watch
Overexposure
ML20140E53612 November 1996Forwards Plant EA Worksheet
ML20138G41312 November 1996Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants
ML20140E5308 November 1996Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation
ML20140E6207 November 1996Provides Two Violations That Are Subjects of EA Worksheet
ML20140E6527 November 1996Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet
ML20140E5946 November 1996Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested
ML20137R9036 November 1996Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by ResidentsShutdown Margin
Grab sample
Locked High Radiation Area
Fuel cladding
Fire Protection Program
Backfit
Downpower
ML20138G3655 November 1996Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted
ML20137Y5405 November 1996Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted
ML20136E30131 October 1996Forwards Schedule for Activities at Plant for Next Few Months
ML20136E39631 October 1996Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant
ML20136E46931 October 1996Discusses Criticality Monitoring Ltr & Requests Response to Listed Question
ML20134E91929 October 1996Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps