ML20149D785

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes
ML20149D785
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9707170251
Download: ML20149D785 (5)


Text

i 1** " " ' - UNIT E D STA TES f .\ NUCLEAR REGULATORY COMMISSION '

h -

i RE GION IV 611 RY AN PL AZ A DRIV E SUIT E 400 c ARLINGTON TE X AS 760118064 JUL I 41997 l NOTICE OF LICEN3EE MEETING l

Name of Licensee: Washington Public Power Supply System Name of Facility: Washington Nuclear Plant 2 l Docket: 50-397 Date and Time July 31,1997 of Meeting: 1 p.m. - 5 p.m. l Location of Meeting: NRC Region IV, Training Conference Room Arlington, Texas Purpose of Meetin;: Regulatory Interface Workshop - Discussion of Case Studies (Response Time Testing and Reactor Feedwater Pump Trip Test) and Common Themes NRC Attendees: E. W. Merschoff, Regional Administrator R. P. Zimmerman, Associate Director for Projects, Office of Nuclear Reactor Regulation (NRR)

J. E. Dyer, Deputy Regional Administrator J. W. Roe, Director, Division of Reactor Projects Ill/IV, NRR T. P. Gwynn, Director, Division of Reactor Projects (DRP)

W. H. Bateman, Director, Project Directorate IV-2, NRT' A. T. Howell, Director, Division of Reactor Safety H. J. Wong, Chief, Reactor Project Branch E, DRP T. G. Colburn, Project Manager, NRR G. D. Replogie, Resident Inspector, DRP Licensee Attendees: J. V. Parrish, Chief Executive Officer P. R. Bemis, Vice President for Nuclear Operations I R. L. Webring, Vice President for Operations Support D. A. Swank, Manager, Regulatory Affairs P. J. Inserra, Manager, Licensing P. Berghausen, Consultant 9707170251 970714 PDR ADOCK 05000397 P PDR l

h(! bb l l

1 l

Washington Public Power l Supply System l

l l NOTE:

(1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify H. J. Wong at (510) 975-0296 by COB on July 25,1997.

l l

l Approved By: _[\ h 1 Thomas P. Gwynn, Director iM b Division of Reactor Projects l l

CC: l Mr. J. V. Parrish (Mail Drop 1023) l Chlef Executive Officer '

Washington Public Power Supply System P.O. Box 968 i Richland, Washington 99352-0968 l Chairman Energy Facility Site Evaluation Council P.O. Box 43172 i Olympia, Washington 98504-3172 l Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support /PIO l Washington Public Power Supply System l P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System i P.O. Box 968 l Richiarsd, Washington 99352-0968 1

Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Aff airs .

Washington Public Power Supply System l P.O. Box 968 i Richland, Washington 99352-0968 l l

l l

! I

Washington Public Power Supply System l

l l

I Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

! Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

l Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 1

l l

l l

l l

{

Washington Public Power -4 g l 4 lgg-[

! Supply System E-Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO I GFS G. F. Sanborn, EO l BWH B. Henderson, PAO i MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries I LAT, DLF, CAM 3 DRP Secretaries l CLG, LMB DRS Secretaries NLH, WSW DNMS Secretaries

)

LSO L. S. Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File l WCFO File 1

l l

DOCUMENT NAME: R:\_WN2\WN7-31 MN.DRP '

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy i

RIV:C:DRP/E D:WCF0 ,/{ / PA0 l/4 RSLO (7/// l D:DRP l()

HJWong:df. KEPerkibsO BWHenderson CAHackne9 TPGwynn t 7/ // /97 /E) 7/i' /97 7/14/97 7// 4-/97 7/ (C/97 M DFFICIAL RECORD COPY l ._ __ _ ___

_ . - . _ ._ -. _ ___,m... . . . . . . _ - ._ _ _ . _ . . . . _ . _ . , _ . _ . _ . . _ _ _ _ - = _ _ _ . _ _ . _ .

I: .

l. f I
  • Q_

Washington 'Public Power J1JL i 4 1997 -

Supply System E Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator

'JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAIL J. Lieberman, D/OE LJC- L. J. Chandle , OGC l- CAH C. A. Hackner, RSLO.

j. DMK1 D. M. Kunihiro, WCFO l GFS G. F. Sanborn, EO BWH B. Henderson, PAO l MFH2 M. Hammond, PAO  ;
KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Secretaries CLG, LMB DRS Secretaries NLH, WSW DNMS Secretaries LSO L. S. Ousley l cc

I DMB (IE 45) l OEDO RIV Coordinator (17G21)

! Receptionist

i. ORA File RIV File DRP File l WCFO File i

i-i DOCUMENT NAME: R:\_WN2\WN7-31 MN.DRP

- To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy wdh enclosures "N" = No copy RIV:C:DRP/E l D:WCFO ,4 / PA0 l/W RSLO (T N l D:DRP lf) 4 HJWong:df KEPerkiheO BWHenderson CAHackne9 TPGwynn %

l 7/ // /97 /6) 7/N /97 7/ly/97 7// t /97 7/ (C/97 $

. OFFICIAL RECORD COPY i

L

.- - - _ . _ _ -- - ._ _.