Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24012A142 | 31 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
IR 05000416/2023004 | 25 January 2024 | Integrated Inspection Report 5000416/2023004 | |
ML24018A022 | 18 January 2024 | Core Operating Limits Report (COLR) Cycle 24, Revision 2 | |
IR 05000458/2023040 | 18 January 2024 | 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter | |
IR 05000416/2024301 | 16 January 2024 | NRC Initial Operator Licensing Examination Approval 05000416/2024301 | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | 12 January 2024 | Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | |
ML24011A174 | 11 January 2024 | Security Baseline Inspection Report (Cover Letter) | Affidavit |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23348A371 | 14 December 2023 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23340A222 | 13 December 2023 | Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
IR 05000458/2023010 | 12 December 2023 | Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 | Boric Acid Past operability Condition Adverse to Quality Significance Determination Process Operability Determination Through-Wall Leak Through Wall Leak |
RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | 7 December 2023 | Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | Ultimate heat sink |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A142 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A143 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23310A032 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000458/2023003 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000416/2023403 | 13 November 2023 | Security Baseline Inspection Report 05000416/2023403 Cover Letter | Affidavit |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
ML23311A432 | 9 November 2023 | Notification of NRC Supplemental Inspection (95001) and Request for Information | |
IR 05000416/2023003 | 8 November 2023 | Integrated Inspection Report 05000416/2023003 | Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Stroke time Enforcement Discretion Met Tower Functionality Assessment Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program |
RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | 6 November 2023 | Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | |
RBG-48260, Notification of Readiness for Supplemental Inspection | 12 October 2023 | Notification of Readiness for Supplemental Inspection | |
ML23278A240 | 6 October 2023 | Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 | Internal Flooding Probabilistic Risk Assessment FLEX |
RBG-48258, Notification of Readiness for Supplemental Inspection | 5 October 2023 | Notification of Readiness for Supplemental Inspection | |
RBG-48259, Revision to Reply to Notice of Violation; EA-23-055 | 3 October 2023 | Revision to Reply to Notice of Violation; EA-23-055 | |
ML23270B993 | 29 September 2023 | Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary | |
ML23269A124 | 27 September 2023 | Request for Withholding Information from Public Disclosure | |
ML23270B189 | 27 September 2023 | Evacuation Time Estimate Study | Pandemic Coronavirus COVID19 Siren |
IR 05000458/2023401 | 26 September 2023 | Cyber Security Inspection Report 05000458/2023401 | Cyber Security Affidavit |
IR 05000458/2023001 | 21 September 2023 | NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded | |
RBG-48254, Report of Changes and Errors to 10CFR50.46 | 21 September 2023 | Report of Changes and Errors to 10CFR50.46 | |
IR 05000458/2023403 | 21 September 2023 | NRC Security Inspection Report 05000458/2023403 (Cover Letter) | Affidavit |
RBG-48249, Reply to a Notice of Violation, EA-23-071 | 14 September 2023 | Reply to a Notice of Violation, EA-23-071 | |
RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 22 | 12 September 2023 | Submittal of Owner'S Activity Report Form for Cycle 22 | |
IR 05000458/2023012 | 1 September 2023 | Comprehensive Engineering Team Inspection Report 05000458/2023012 | |
ML23240A395 | 28 August 2023 | Reply to a Notice of Violation; EA-23-019 | |
IR 05000416/2023005 | 21 August 2023 | Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) | Cyber Security License Renewal |
IR 05000458/2023005 | 21 August 2023 | Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal |
RBG-48247, Reply to Notice of Violation; EA-23-055 | 21 August 2023 | Reply to Notice of Violation; EA-23-055 | Temporary Modification |
ML23226A100 | 18 August 2023 | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 | Internal Flooding Probabilistic Risk Assessment FLEX Open Phase Condition Tornado Missile Risk Evaluator |
IR 05000458/2023092 | 15 August 2023 | Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 | Significance Determination Process Preliminary White Finding |
IR 05000458/2023002 | 9 August 2023 | Integrated Inspection Report 05000458/2023002 | High Radiation Area Ultimate heat sink Enforcement Discretion Functionality Assessment Operability Determination Time Critical Operator Action Fire Protection Program Substantial potential for overexposure Substantial potential for an overexposure Power Uprate Overexposure |
IR 05000416/2023002 | 8 August 2023 | Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 | Stroke time Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Unidentified leakage |
IR 05000416/2023404 | 7 August 2023 | Material Control and Accounting Program Inspection Report 05000416/2023404 | Affidavit |