IR 05000269/2024301 | 23 September 2024 | NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 | |
IR 05000269/2024005 | 26 August 2024 | Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) | Commercial Grade Dedication Cyber Security Aging Management |
IR 05000269/2024010 | 1 August 2024 | Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 | Coatings Aging Management License Renewal Maintenance Rule Program |
IR 05000269/2024002 | 25 July 2024 | Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 | Safe Shutdown Boric Acid Mission time Fire Barrier Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Foreign Material Exclusion Operability Determination Commercial Grade Control of Heavy Loads Fire Protection Program Hourly Fire Watch Power Uprate Measurement Uncertainty Recapture |
IR 05000269/2024001 | 3 May 2024 | Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 | Unanalyzed Condition Time of Discovery Enforcement Discretion Temporary Modification Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination Fuel cladding Fire Protection Program Power change |
IR 05000269/2024402 | 24 April 2024 | Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 | Fitness for Duty |
IR 05000269/2024401 | 28 March 2024 | – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 | |
IR 05000269/2023006 | 28 February 2024 | Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) | Commercial Grade Dedication Cyber Security |
IR 05000269/2023004 | 13 February 2024 | Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 | Safe Shutdown Boric Acid Time of Discovery High Radiation Area Fire Barrier Nondestructive Examination VT-2 Functionality Assessment FLEX Significance Determination Process Foreign Material Exclusion Eddy Current Testing Operability Determination Earthquake Maintenance Rule Program Control of Heavy Loads Power Operated Valves Fuel cladding Fire Protection Program Fire Watch |
ML23331A798 | 14 December 2023 | Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) | |
IR 05000269/2023003 | 14 November 2023 | Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion | Unanalyzed Condition Fire Barrier Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Earthquake Maintenance Rule Program Fire Protection Program Dissimilar Metal Weld |
IR 05000269/2023005 | 25 August 2023 | Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) | Commercial Grade Dedication Aging Management License Renewal |
IR 05000269/2023011 | 25 August 2023 | Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 | Mission time Arc flash Aging Management Open Phase Condition Foreign Material Exclusion Time Critical Operator Action Battery sizing GOTHIC Operability Assessment Loss of condenser vacuum Water hammer |
IR 05000269/2023002 | 28 July 2023 | Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 | Grab sample Fire Barrier Internal Flooding Enforcement Discretion Met Tower Temporary Modification Functionality Assessment Feedwater Heater Operability Determination Fire Protection Program Downpower |
IR 05000269/2023010 | 19 July 2023 | Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation | Internal Flooding Condition Adverse to Quality Aging Management Significance Determination Process Maintenance Rule Program Water hammer Control Room Habitability |
RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report | 18 May 2023 | Refuel 32 (O1R32) Steam Generator Tube Inspection Report | |
IR 05000269/2023001 | 12 May 2023 | Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 | Boric Acid Fire Barrier Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Eddy Current Testing Operability Determination Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Power change Operational leakage |
IR 05000269/2023401 | 14 April 2023 | Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 | |
IR 05000269/2022006 | 1 March 2023 | Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) | Commercial Grade Dedication Cyber Security Aging Management License Renewal Exemption Request Coronavirus |
ML23037A077 | 6 February 2023 | 402 Cyber Notification and RFI Letter Final | Cyber Security |
IR 05000269/2022004 | 2 February 2023 | Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 | Boric Acid High Radiation Area Fire Barrier Weld Overlay Temporary Modification Functionality Assessment Locked High Radiation Area FLEX Aging Management Significance Determination Process Foreign Material Exclusion Maintenance Rule Program Liquid penetrant Fire Protection Program Substantial potential for overexposure Operability Assessment Overexposure |
IR 05000269/2022003 | 7 November 2022 | Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 | Fire Barrier Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Operability Determination Fire Protection Program Skill of the craft |
IR 05000269/2022011 | 26 September 2022 | NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 | Mission time Surveillance Frequency Control Program Control of Heavy Loads Turbine Missile Overspeed |
IR 05000269/2022005 | 26 August 2022 | Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000269/2022401 | 26 August 2022 | Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) | Affidavit |
IR 05000270/2022002 | 29 July 2022 | Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 | Boric Acid High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Coatings Functionality Assessment Aging Management Flow Accelerated Corrosion Feedwater Heater Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
IR 05000269/2022010 | 30 June 2022 | Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 | Safe Shutdown Probabilistic Risk Assessment Operability Determination Fire Protection Program Incremental Core Damage Probability Deficit |
IR 05000269/2022403 | 4 May 2022 | Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 | |
IR 05000269/2022001 | 4 May 2022 | Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 | Safe Shutdown Unanalyzed Condition Internal Flooding Enforcement Discretion Coatings Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Feedwater Heater Large early release frequency Operability Determination Fire Protection Program Power change |
IR 05000269/2022404 | 27 April 2022 | Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 | |
IR 05000269/2022301 | 7 March 2022 | Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 | |
IR 05000269/2021006 | 2 March 2022 | Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) | Cyber Security License Renewal Exemption Request Coronavirus |
IR 05000269/2022012 | 24 February 2022 | Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 | |
IR 05000269/2022402 | 16 February 2022 | Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 | Fitness for Duty Enforcement Discretion |
IR 05000269/2021004 | 14 February 2022 | Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation | Boric Acid High Radiation Area Fire Barrier Time to boil Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Eddy Current Testing Battery sizing Control of Heavy Loads Fire Protection Program Incremental Core Damage Probability Deficit Coast down Operability Assessment |
IR 05000269/2021003 | 28 October 2021 | Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 | Safe Shutdown Boric Acid Fire Barrier Internal Flooding Probabilistic Risk Assessment Operator Manual Action Functionality Assessment Aging Management Significance Determination Process Open Phase Condition Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program Incremental Core Damage Probability Deficit GOTHIC Unidentified leakage |
IR 05000269/2021010 | 17 September 2021 | Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 | Mission time Significance Determination Process Power-Operated Valves Coronavirus COVID-19 Weak link |
IR 07200004/2021001 | 26 August 2021 | Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 | |
IR 05000269/2021005 | 26 August 2021 | Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) | Fitness for Duty Cyber Security Open Phase Condition License Renewal Exemption Request Coronavirus |
IR 05000269/2021002 | 4 August 2021 | Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 | Safe Shutdown Fire Barrier Stroke time Probabilistic Risk Assessment Operator Manual Action Temporary Modification Functionality Assessment FLEX Significance Determination Process Coronavirus COVID-19 Fire Protection Program GOTHIC Operability Assessment |
IR 05000269/2021301 | 6 July 2021 | NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 | |
IR 05000269/2021011 | 2 June 2021 | Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 | Battery sizing Fire Watch |
IR 05000269/2021001 | 23 April 2021 | Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 | Mission time Fire Barrier Stroke time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Coronavirus COVID-19 Fire Protection Program Substantial potential for overexposure Power change Overexposure Water hammer Control Room Habitability |
IR 05000269/2021401 | 22 April 2021 | Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) | Affidavit |
IR 05000269/2020006 | 3 March 2021 | Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 | Fitness for Duty Operator Manual Action Open Phase Condition License Renewal Exemption Request Power-Operated Valves Coronavirus |
IR 05000269/2020004 | 22 February 2021 | Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Nondestructive Examination VT-2 Cyber Security Functionality Assessment Foreign Material Exclusion Eddy Current Testing Coronavirus COVID-19 Liquid penetrant Fire Protection Program Operability Assessment |
ML21036A001 | 4 February 2021 | Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Nondestructive Examination VT-2 Cyber Security Functionality Assessment Foreign Material Exclusion Eddy Current Testing Coronavirus Liquid penetrant Fire Protection Program Operability Assessment |
IR 05000269/2020010 | 22 January 2021 | NRC Design Bases Assurance Inspection (Team) Report 05000269/2020010 and 05000270/2020010 and 05000287/2020010 and Notice of Violation | Stroke time Cyber Security Functionality Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency Battery sizing Coronavirus COVID-19 Water hammer |
IR 05000269/2020401 | 13 November 2020 | Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401 | Coronavirus COVID-19 |
IR 05000269/2020003 | 4 November 2020 | Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 | Safe Shutdown Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Aging Management Missed surveillance Significance Determination Process Feedwater Heater Operability Determination Annual Radiological Effluent Release Report License Renewal Earthquake Coronavirus COVID-19 Fire Protection Program |