Issue date | Title | Topic | |
---|---|---|---|
ML20197H858 | 14 November 1990 | Summarizes ACRS 367th Meeting on 901108-10 Re SECY-90-353 Concerning Licensing Review Basis Document for C-E | |
ML20059L007 | 12 September 1990 | Notification of 901003 Meeting W/Abb C-E in Rockville,Md to Discuss Sys 80+ Seismic Envelope & Design | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20248E939 | 29 September 1989 | Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed | |
ML20248C831 | 20 September 1989 | Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action | |
ML20247H926 | 9 September 1989 | Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 | Systematic Assessment of Licensee Performance |
ML20246E292 | 17 August 1989 | Forwards Licensing Review Basis for CESSAR-DC.Document Establishes Schedule & Process for Design Certification Review of C-E Sys 80+ | Safe Shutdown Ultimate heat sink Mission time Probabilistic Risk Assessment Earthquake Control of Heavy Loads Weak link |
ML20245E850 | 7 August 1989 | Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate | |
ML20245H645 | 4 August 1989 | Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR | |
ML20248D143 | 27 July 1989 | Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants | |
ML20247B754 | 19 July 1989 | Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete | |
ML20247E672 | 17 July 1989 | Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List | |
ML20246K599 | 12 July 1989 | Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl | |
ML20246L680 | 10 July 1989 | Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization | |
ML20247A956 | 6 July 1989 | Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS | |
ML20246H377 | 12 May 1989 | ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 | |
ML20246P960 | 10 May 1989 | Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl | |
ML20245H765 | 25 April 1989 | Requests Input Re Acceptability of C-E 890330 Design Certification Application for Sys 80+ Std Design | |
ML20245E978 | 17 April 1989 | Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) | |
ML20245B619 | 15 April 1989 | Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both | |
ML20245B642 | 15 April 1989 | Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart | |
ML20245B653 | 15 April 1989 | Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys | |
ML20245B750 | 15 April 1989 | Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart | |
ML20244E268 | 12 April 1989 | Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl | Reverse polarity |
ML20244A546 | 10 April 1989 | Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS | |
ML20244A557 | 10 April 1989 | Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports | |
ML20247B735 | 24 March 1989 | Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants | |
ML20236A972 | 7 March 1989 | Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project | |
ML20235S627 | 28 February 1989 | Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl | |
ML20246N317 | 23 February 1989 | Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects | |
ML20245E944 | 31 January 1989 | Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant | Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Backfit |
ML20196C270 | 2 December 1988 | Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 | |
ML20196B608 | 29 November 1988 | Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews | |
ML20195K348 | 28 November 1988 | Notification of 881220 Meeting w/C-E in Rockville,Md to Discuss Seismic Issues Involved in Containment Design for CESSAR-DC Sys 80e Re Soil/Structure Interaction Phase | |
ML20206M923 | 23 November 1988 | Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 | Fatality |
ML20195J014 | 22 November 1988 | Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants | |
ML20206J644 | 16 November 1988 | Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 | |
ML20206E636 | 14 November 1988 | Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues | |
ML20206J574 | 10 November 1988 | Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC | |
ML20206J557 | 9 November 1988 | Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl | |
ML20195G258 | 8 November 1988 | Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc | |
ML20205T582 | 7 November 1988 | Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule | |
ML20205T649 | 7 November 1988 | Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn | |
ML20205R673 | 4 November 1988 | Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence | |
ML20205N369 | 28 October 1988 | Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 | |
ML20206B248 | 27 October 1988 | Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt | |
ML20205K332 | 26 October 1988 | Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls | |
ML20195B613 | 26 October 1988 | Forwards Status Rept on Std Plant Design Technical Reviews | |
ML20155H362 | 18 October 1988 | Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 | |
ML20204G074 | 17 October 1988 | Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER |