ML20059L007
| ML20059L007 | |
| Person / Time | |
|---|---|
| Site: | 05000470 |
| Issue date: | 09/12/1990 |
| From: | Wambach T Office of Nuclear Reactor Regulation |
| To: | Chris Miller Office of Nuclear Reactor Regulation |
| References | |
| PROJECT-675A NUDOCS 9009260028 | |
| Download: ML20059L007 (5) | |
Text
L 2
Sept:mber 12,-1990
' Project No. 675-MEMORANDUM FOR: Charles L. Miller, Director Standardization Project Directorate Division of Reactor Projects - III,'
IV, Y and Special Projects FROM:
Thomas V. Wernbach, Senior Project Manager Standardiretion Project Directorate Division of m actor Projects - III, IV, Y and Special Projects
SUBJECT:
FORTHCOMING MEETING WITH ABB COMBUSTION ENGINEERING, INC.
DATE & TIME:
October 3, 1990 8:30 e.m. - 3:00 p.m.
LOCATION:
One White Flint North 11555 Rockville Pike
~Rockville, Maryland Room 4-B-13 PURPOSE:
5YSTEM 80+ SEISMIC ENVELOPE AND DES"iN (AGENDA ENCLOSED)
PARTICIPANTS *:.
NRC Applicant W. Travers S. E. Ritterbusch, ABB-CE C. Miller L. D. Gerdes, ABB-CE T. Wambach
.J. R. Cassidy, Duke G. Bagchi R. H. Benoit, Duke R. Rothman S. Dermitzakis, Impell D. Jeng M. A. Manrique, Irpell-R. P. Kennedy', Consultant-I. M. Idriss, Consultant OriginalSigned By:
Thomas V. Wambach, Senior Project Manager Standardization Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects 4
Enclosure:
As stated cc w/ enclosure: See next page g-NM
- Meeting between NRC technical staff and applicants or licensees are open for 8
interested members of the public, petitioners, intervenors, or other parties os to attend as observers pursuant to "Open Meeting Statement of HRC Staff e
Policy," 43 Federal Register 28058, 6/28/78.
Y n
TWambu%h:cw [
P PDSTrC k'QO.
PDST:li$
\\
4 jaj PSheaJ DR3 g
09/g/
09 /2190
-au
\\t
- 0 E CEEJIE!! COPY D0'CUMENT NAME: MTG W/CE 10/3
r I
l
.-arop#'C
~
c.
- ~
.-[+[y.-
UNITED STATES g
g.
NUCLEAR REGULATORY COMMISSION
- a WASHINGTON, D. C. 20555 i
7 3
/
September 12. 1990 e...*
J IProjectNo.675-
.HEMORANDUM FOR:
Charles L. Miller, Director Standardization Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects FROM:-
Thomas V. Wambach, Senior Project Manager Standardization Project Directorate Division of Reactor Projects - III, IV, V and Special Projects
SUBJECT:
FORTHCOMING MEETING WITH ABB COMBUSTION ENGINEERING, INC.
DATE & TIME:-
October 3, 1990 8:30 a.m. - 3:00 p.m.
LOCATION:
One White Flint North e
11555 Rockville Pike Rockville, Maryland Room 4-B-13 s
PURPOSE:
SYSTEM 80+ SEISMIC ENVELOPE AND DESIGN (AGENDA ENCLOSED)
PARTICIPANTS *:
NRC Applicant W. Travers S. E. Ritterbusch, ABB-CE C. Miller
-L. D. Gerdes, ABB-CE R
T. Wambach J. R. Cassidy, Duke G. Bagchi R. H. Benoit, Duke o
l R. Rothman S. Dermitzakis, Impell D. Jeng M. A. Manrique, Impell R. P. Kennedy, Consultant I. M. Idriss, Consultant T omas V. Wambach, Senior Project na r Standardi2ation Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects
Enclosure:
As stated cc w/ enclosure: See next page 1
- Meeting between NRC technical staff and applicants or licensees are open for interested members of-the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Register 28058,6/28/78.
~'
. Combustion Engineering, Jee.
Project No. 675 r
I cc:' Mr. C. B. Brinkman, Manager Washington Nuclesr Operations.
Conbustion Engineering. Inc.
12300 Twinbrook Parkway Suite 330 Rockville, Maryland 20852 Mr. Sten Pitterbusch Nuclear Licensing' Corbustion Engineering 1000 Prospect Hill P.oad Post Office Box 500 Windsor, Connecticut 06095-0500 x
l 1
^
t
- ?:
ENCLOSURE:
+-
AGENDA FOR MEETING BETWEEN i;.--
NEC-STAFF AND ABB-COMBUSTION ENGINEERING UN SYSTEM 80+ SElstilC ENVELOPE AND DESIGN Rockville, Marylano y
'8:30 Introduction-Overview of System 80+ Seismic Program Decoupling of OBE and SSE Design Bases Site Profiles and Soil Parameters Structural and Soil Models Soil-Structure-Interaction Analyses Methods and Results
' Structural Analyses -' Methods and Results Site Acceptance Criteria
.3 OBE cemideration Seismic Design.in PRA Seismic Marg ns-Discussions 3:00 Closing n
~}
r:
g September 12, 1990
~'
l l]
.hRCl>DR FDS r/f T. Murley/F. Miraglia J. Partlow D. Cr,*,chfield W. Travers D. Scaletti Acting Chief, EAB OGC-E. Jordan B. Grimer Receptionist (OneWhiteFlintNorth)
ACRS(10)
GPA/PA Y. Wilson N. Green P. Shea M. Slosson T. Wan6ach Y..Kqnyon
,L. Donatell
- 1. Yoshida G. Bagcht R. Rotheen D. Jag J. t Ison, 11H1
+
J l
4
-