Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202G997 | 2 February 1999 | Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) | |
ML20196D471 | 30 November 1998 | Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl | Shutdown Margin |
ML20237E254 | 26 August 1998 | Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 | |
ML20216F428 | 14 April 1998 | Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV | |
ML20203K163 | 18 December 1997 | Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 | |
ML20210Q779 | 27 August 1997 | Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 | |
ML20148G273 | 27 May 1997 | Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer | |
ML20134J877 | 10 February 1997 | Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities | |
ML20132B261 | 11 December 1996 | Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound | |
ML20117M746 | 20 August 1996 | Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) | |
ML20116B360 | 18 July 1996 | Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering | |
ML20113D695 | 28 June 1996 | Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent | Hydrostatic |
ML20100R636 | 19 February 1996 | Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique | |
ML20096E817 | 16 January 1996 | Advises Jg Gilligan Named Dean of Engineering (Interim) | |
ML20197J940 | 16 January 1996 | Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld | |
ML20096H150 | 4 December 1995 | Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 | |
ML20094R135 | 29 November 1995 | Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) | |
ML20092G400 | 15 September 1995 | Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations | |
ML20087H276 | 10 August 1995 | Requests Time Extension in Responding to RAI | |
ML20083A477 | 1 May 1995 | Requests Addl 90 Days to Respond to NRC 950209 RAI | |
ML20197J983 | 1 May 1995 | Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl | |
ML20078B359 | 14 September 1994 | Provides Status of North Caroline State Univ Pulstar RCS Water Leakage | |
ML20072P227 | 24 August 1994 | Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 | |
ML20197J964 | 24 August 1994 | Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl | |
ML20072K001 | 23 August 1994 | Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change | |
ML20072E426 | 15 August 1994 | Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk | |
ML20072E411 | 20 July 1994 | Advises of Listed Personnel Changes for License R-120 | |
ML20064H037 | 15 March 1994 | Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec | |
ML20063B554 | 24 January 1994 | Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys | |
ML20059C931 | 6 December 1993 | Provides 1993 Annual Pulstar Emergency Drill Critique | |
ML20059G689 | 22 September 1993 | Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 | |
ML20057E889 | 31 August 1993 | Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 | |
ML20045J019 | 19 July 1993 | Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College | |
ML20198A521 | 15 June 1993 | Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld | |
ML20044C031 | 11 March 1993 | Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes | |
ML20127P809 | 30 November 1992 | Forwards Offsite Dose Calculation for Noble Gases, in Response to 900418 Request for Addl Info in Support of 880419 License Renewal Application.Analysis Addresses Dose to Receptor in Unrestricted Areas Proximate to Facility | |
ML20114B942 | 27 August 1992 | Responds to NRC Re Violations Noted in Insp Rept 50-297/92-01.Corrective Actions:Emergency Plan & Procedures Currently Under Review & self-contained Breathing Apparatus Placed on Maint Contract W/Approved Vendor | |
ML20099K265 | 21 August 1992 | Forwards Pulstar Annual Rept to NRC for Jul 1991-June 1992, North Carolina State Univ Nuclear Reactor Program & Environ Radiation Surveillance Rept for Jul 1991-June 1992 | |
ML20091Q319 | 22 January 1992 | Notifies That Pb Perez Assigned Assoc Director,Nuclear Reactor Program Effective 920201 | |
ML20086C638 | 13 November 1991 | Submits Info to Correct Data Base & for Consideration When Reviewing Written Exam Administered on 911112 by P Isaac | |
ML20082H812 | 21 August 1991 | Forwards Pulstar Annual Rept to NRC for Jul 1990 to June 1991 & Environ Radiation Surveillance Rept for Jul 1990 to Jul 1991 | |
ML20082E332 | 27 June 1991 | Submits Listing of Personnel Changes Identified in Figure 6.1-1 of Amend 8 to Tech Specs.G Miller Resigned Position as Associate Director on 910625.Univ Anticipates Hiring Individual to Fill Position in Fourth Quarter 1991 | |
ML20073B990 | 18 June 1991 | Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors | |
ML20070N890 | 15 March 1991 | Forwards Decommissioning Funding Statement of Intent,Per 10CFR50.75 for Pulstar Reactor Facility | |
ML20066D778 | 7 January 1991 | Submits List of Personnel Changes in Positions Identified by Figure 6.1-1 of Tech Specs (Amend 8).Mailing List Should Be Corrected to Reflect Changes | |
ML20059D139 | 31 August 1990 | Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 | |
ML20055H916 | 24 July 1990 | Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility | |
ML20055G644 | 20 July 1990 | Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) | |
ML20055H083 | 18 July 1990 | Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info | |
ML20042E295 | 17 April 1990 | Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) |