 Issue dateTitleTopic
ML20199L58924 December 1997Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant
ML20210P87231 August 1997Post Decommissioning Activities Rept, for Aug 1997Coatings
ML20141A00431 May 1997Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997High Radiation Area
Locked High Radiation Area
Process Control Program
Scaffolding
ML20137H30331 March 1997Rev 2 to Nuclear Training Loit/Lout Audit ReviewsPower change
ML20137C62814 March 1997Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews
ML20135E32213 February 1997Independent Review Team Rept 1996 MP -1 Lout NRC Exam FailuresCondition Adverse to Quality
Grace period
ML20134L2753 February 1997Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis
ML20134L2918 January 1997Rev 0 to UFSAR Rev Grpi
ML20237E07531 December 1996Decommissioning Cost Study for Connecticut Yankee Nuclear Power PlantUltimate heat sink
ML20204B68131 December 1996Nuclear Lemons Assessment of America Worst Commerical Nuclear Power Plants. 5th Edition
ML20134L25931 December 1996Rev 0 to Sys Reclassification
ML20134L27231 December 1996Commitment Mgt Grpi
ML20134L24830 December 1996Rev 0 to Sys Needed for Decommissioning Sys Evaluation ProcessBoric Acid
ML20135E27126 December 1996Evaluation of Intakes by Two Workers at CT Yankee Atomic Power Co
ML20134L28423 December 1996Rev 0 to Spent Fuel Pool Island Studies
ML20134L23819 December 1996Rev 0 to Accident AnalysisAnticipated operational occurrence
ML20134L28719 December 1996Rev 0 to Grpi for Defueled Condition Fire Protection Technical RequirementsSafe Shutdown
Hydrostatic
Continuous fire watch
Fire Protection Program
Fire Watch
ML20058G34831 October 1993Nonproprietary VIPRE/WRB-1 DNBR Thermal Limit for Westinghouse Fuel Types, for Oct 1993
ML20058G67729 September 1993Rev 0 to Project Assignment 91-006, Connecticut Yankee Event V Mods
ML20058L74115 July 1993QA Svcs Dept Surveillance Rept SS-169, Assessment of Fitness for Duty ProgramFitness for Duty
ML20127J53930 November 1992Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Load Combinations Code ChangesSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Tornado Generated Missile
Tornado Missile Protection
Earthquake
ML20125E56631 March 1992Nonproprietary PWR SG Tube Repair Limits:Technical Support Document for Expansion Zone PWSCC in Roll Transitions Final ReptAnticipated operational occurrence
Nondestructive Examination
A08995, Rev 1 to Auxiliary Initiation Event Analysis14 September 1990Rev 1 to Auxiliary Initiation Event Analysis
ML20062G49531 July 1990Rev 3 to Northeast Utils USNRC Read & Sign
ML20055G49531 July 1990Decommissioning Financial Assurance Certification Rept
ML20055D89330 June 1990Fracture Mechanics Evaluation:Haddam Neck Pressurizer
ML20246N94231 August 1989Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power StationSafe Shutdown
Tornado Missile
ML20206J99931 October 1988Crdr Summary Rept, Per Suppl 1 to NUREG-0737Boric Acid
Met Tower
ML20153G4083 June 1988Rev 0 to Conneticut Yankee Replace Nuclear Instrumentation Sys, Neo Project Description
ML20153G4038 March 1988Rev 0 to, Connecticut Yankee Modernize Reactor Protection Sys - Phase 2, Conceptual Project DescriptionFuel cladding
Fire Protection Program
ML20235B59124 September 1987Undated Technical Evaluation:Haddam Neck Plant Reanalysis of Non-LOCA DBAs & Tech Spec Change Requests in Support of Reload Cycle 15Shutdown Margin
B12619, Bimonthly Progress Rept 5:New Switchgear Bldg Const31 July 1987Bimonthly Progress Rept 5:New Switchgear Bldg ConstFitness for Duty
ML20214R63730 June 1987Technical Rept Supporting Cycle 15 OperationShutdown Margin
ML20205Q70130 April 1987Bimonthly Progress Rept 3:New Switchgear Bldg ConstEmergency Lighting
B12480, Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize Encl30 April 1987Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize EnclHot Short
Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Tornado Generated Missile
Earthquake
ML20209C71631 December 1986Vols 1 & 2 to Isap,Haddam Neck Plant,Final ReptHot Short
Safe Shutdown
Boric Acid
High winds
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Emergency Lighting
Tornado Missile Protection
Systematic Assessment of Licensee Performance
TORMIS
Exemption Request
Earthquake
Control of Heavy Loads
Turbine Missile
Fuel cladding
Fire Protection Program
Fire Watch
Backfit
Failure to Scram
Affidavit
ML20238C38231 December 1986Connecticut Yankee 1986 Steam Generator Repair Outage ALARA ReptHigh Radiation Area
ML20238C37531 December 1986Connecticut Yankee 1986 Core XIII - Xiv Refueling Outage ALARA ReptBoric Acid
Fire Watch
Scaffolding
ML20202D50730 June 1986Non-LOCA Transient AnalysisBoric Acid
Shutdown Margin
Fuel cladding
ML20206J88730 June 1986Isap Public Safety Impact Model Project Analyses Summaries
ML20205T12019 May 1986Steam Generator Tube Insp Rept for 1986 Refueling Outage
ML20205T1238 May 1986Steam Generator Tube W/55% Through Wall Defect Safety Evaluation for Structural Integrity
CY-86-031, Rev 1 to 4.10.1(D) Inservice Insp of Steam Generator Tubes (Acceptance Criteria)8 May 1986Rev 1 to 4.10.1(D) Inservice Insp of Steam Generator Tubes (Acceptance Criteria)
ML20138B20031 March 1986Status of Containment Integrated Leak Rate Test Program
ML20138B18331 March 1986Schedular Exemption Requests Re Type C Leak TestingProbabilistic Risk Assessment
Exemption Request
ML20138B15631 March 1986Permanent Exemptions Re Types a & C Leak TestingExemption Request
Fire Protection Program
ML20199L07331 March 1986Probabilistic Safety Study,Northeast Util Svc Company Evaluation of Probabilistic Safety Study Results
B12020, Summary of Results of Haddam Neck Probabilistic Safety Study31 March 1986Summary of Results of Haddam Neck Probabilistic Safety Study
ML20155E75928 February 1986Best Estimate LOCA Analysis, Vol 5Loop seal
Hydrostatic
Fuel cladding
Coast down
CY-85-062, Rev 2 to Steam Generator Tube Sleeving & Plugging22 January 1986Rev 2 to Steam Generator Tube Sleeving & PluggingShutdown Margin