. ._, . .- . . .. _.

T Docket No. 50-213 B12480 Attachment I Haddam Neck Plant Bimonthly Progress Report flo. 3 New Switchgear Building Construction 4

l f

1 a

April,1987 8704060026 870401 PDR R

ADOCK 05000213

, PDR

l Attachment I r B12480/Page1 Haddam Neck Plant -

Bimonthly Progress Report No. 3 New Switchgear Building Construction

SUMMARY

In a letter dated June 30,1986,(1) the Connecticut Yankee Atomic Power Company (CYAPCO) provided the NRC Staff with the conceptual design information for the new switchgear building at the Haddam Neck Plant, including a description of the new facility. The major milestone schedule for the construction and implementation phases of this project was provided to the NRC Staff in a letter dated September 30,1986(2) and committed to provide the NRC Staff with bimonthly progress reports. The following is a breakdown of the major activities accomplished and ongoing for the third reporting period.

MAJOR ACTIVITIES Switchgear Building Construction Begins o On March 30,1987, construction of the switchgear building commenced after the conclusion of groundbreaking ceremonies. Construction began two days ahead of the Major Milestone Schedule construction start date.

Project Engineering and Support Services Document Issued:

o Engineering Task Logs supplied for information

{

Work in Progress:

l o I Revision of Project Intermediate Schedule i I

o Issue updated Engineering Task Logs o Revise and issue Project Procedures Manual i

- _-b

- . . . . - .= - __

' Attachment i B12480/Page 2 Architectural Documents issued:

o Drawings Issued for Construction:

Switchgear Building Floor Plans at El.13'-6" and 27'-6" Switchgear Building Floor Plan at El. 41'-6" and Roof Plan Switchgear Building - Elevations Switchgear Building Door, Room Finish, and Painting Schedules j o Issued for bids, Technical Specification and M/R for 3 psi Pressure Resistant Doors i

! Work in Progress:

i j

o Continue design of outside stairway and walkway

o Issue for comments, drawing, Switchgear Building - Stair and Walkway Details 4

Civil 4 Documents Issued:

o Drawings Issued for Construction:

I Switchgear Building Concrete Floor Plans El.13'-6" and 27'-6" Switchgear Building Concrete Floor Plans El. 41'-6", 58'-6", and 70'-3" i -

Switchgear Building Wall Elevations Reinforcing - Embeds Details i

4

Attachment i B12480/Page 3 Structural Steel Standard Details Switchgear Building Steel Framing El. 27'-6" and 41'-6" Switchgear Building Embeds and Miscellaneous Details Switchgear Building Steel Plans - Section and Details Plant Column Grid Founda tion /Shee tpiling / Walls /Floo rs Switchgear Building Plan - Finish Grading and Drainage Drywell Switchgear Building Embeds and Misc. Details o Specifications Issued for Use:

Earthwork Construction Purchase of Structural and Miscellaneous Steel Erection of Structural and Miscellaneous Steel Placing Reinforcing Steet Purchase of Expansion Anchors Installation of Expansion Anchors o Issued for use, PDCR No. 365, New Switchgear Building o Material Requisitions Issued for Bids:

l l

j B12480/Page 4 Earthwork and Sheetpiling Material Testing Ready-Mixed Concrete Reinforcing Steel Structural and Miscellaneous Steel Work in Progress:

o Finalization of structural design and seismic analysis of new Switchgear Building o Review of ductbank routing and design o Structural design of ductbanks o Structural design of walkways Electrical / Control Systems Documents Issued:

o Drawings Issued for Comments:

One Line Diagram,480 V Power Distribution Panel Switchgear Building Lighting Layout, Materials, Lighting Distribution Panels, and Miscellaneous Details Raceway Layout, New Switchgear Building to Existing Facilities

{

Attachment i B12480/Page 5 Schematic Diagram,480 V Switchgear Bus 11 Unit 2D Service Water Pump P37-ID Schematic Diagram,480 V Bus 11 Unit 3B Residual Heat Removal Pump P14-1B

- Schematic Diagram,480 V Switchgear Bus 11 Unit 2C Component .

Cooling Water Pump P13-lC 4 - Schematic Diagram,480 V Switchgear Bus 11 Unit 2C Component Cooling Water Pump P13-IC Schematic Diagram,480 V Switchgear Bus 11 Unit IB, Bus 6 to 11 the Breaker i

Schematic Diagram,480 V Switchgear Bus 11 Unit 3A,480 V Dist.

Pnt. LP-U7-1 Schematic Diagram,480 V Switchgear Bus 11 Unit 2B,480 V MCC 12-11

) -

Schematic Diagram, Main Lube Oil Pump P-149-1 A for Charging Pump P-18-1 A

{

Schematic Diagram, Cont. Tank to Recirc. Charging Pump Valve CH-MOV-278 One Line Diagram,120 V ac Vital Distribution Panel l o Specifications Issued for Comments l

j - Class IE Motors i

l Attachment i 1312430/Page 6 Non-Class IE Motors o Emergency Lighting, material requisition issued for comments for bid o Electrical / Control Systems Design Criteria issued for use o Power Distribution Panel, material requisition for bid Issued the following for construction:

Switchgear Building Lighting Plan Switchgear Building Lighting Legend, Materials, Lighting Distribution Panels and Miscellaneous Details Switchgear Building Grounding and Lighting Protection Plans and Details Electrical Installation Specification Work in Progress:

o Preparation of the following specifications for comment issue:

Remote Instrument Panel Transfer Panel o Preparation of remaining electrical schematic diagrams o Preparation of remaining electrical loop diagrams B12480/Page 7 o Preparation of PDCRs for ductbanks and building services o Preparation of the following specifications for bid:

- DC Panels Vital AC Power Supply o Preparation of the following specifications for comment Transfer Panel Remote Instrumentation Panel o Preparation of schematic and loop diagrams o Technical evaluation of bid packages Mechanical Documents Issued:

o Issued for bid, Technical Specification for Air Handling and Condensing Unit o Issued for use, Piping Standards o Issued for use, Mechanical Design Criteria o Issued for comment, Sump Pump, Material Requisition o Issued for comment, HVAC System Description

Attachment 1 B12480/Page 8 o issued for comment, Techn: cal Specification for Fans for Category I Service o issued for comment, Technical Specification for Safety-Related HVAC Air Handling Unit o issued for comment, Technical Specification for HEPA Filter Unit o issued for comment, Technical Specification for Automatic Sprinkler Fire Suppression System o Issued for comment, Technical Specification for Halon Fire Suppression System o Issued for comment, Material Requisition for Motor-Operated Holst o issued for comment, Material Requisition for Fire Protection Valves Work in Progress:

1 o Preparation of the system description for the first and second floor HVAC system o Preparation of Technical Specification for Dampers o Preparation of design requirements for the Switchgear Building hose stations o Preparation of piping installation specification o Preparation of material requisition for sump pump discharge piping valves

. . . . - - = , _ . . _

Attachment 1 '

B12480/Page 9 o Preparation of P&lD for Switchgear Building sump pump discharge piping o Preparation of bid, Material Requisition for Sump Pumps o Preparation of Technical Specification for Fans for Category I Service j o Preparation of Technical Specification for Safety-Related HVAC Air

, Handling Unit l

3 o Preparation of bid, Technical Specification for HEPA Filter Unit o Preparation of bid, Technical Specification for Automatic Sprinkler Fire Suppression System t

i l o Preparation of bid, Material Requisition for Fire Protection Valves, 18691-P-663 1

l Plant Facilities

)

i

{ Documents Issued:

I o Drawings Issued for Construction:

I Switchgear Building Area Piping Plan El.13'-6" and 27'-6" l

Switchgear Building Area Piping Plan El. 41'-6" ,

]

Switchgear Building Floor and Equipment Drains Plan El.13'-6",

i 27'-6" aad Partial Plan El. 41'-6 1

Switchgear Building Penetration Location - Plan El.13'-6" i

i i

Attachment !

' B12480/Page 10 Switchgear Building Penetration Location - Plan El. 27'-6' Switchgear Building Penetration Location - Plan El. 41'-6" Switchgear Building Penetration Location - Roof El. 58'-6"-

Switchgear Building - General Arrangement Plan El.13'-6" Switchgear Building - General Arrangement Plan El. 27'-6" Switchgear Building - General Arrangement Plan El. 41'-6" Switchgear Building - General Arrangement Roof El. 58'-6" and 63'-6" Switchgear Building - General Arrangement Sections A and C Work in Progress:

o Finalization of HVAC duct routing o Radwaste drain piping design o Preparation for issue, HVAC design drawings Procurement Documents issued:

o issued bid requests for the following:

- Ready-Mix Concrete

Attachment 1 B12480/Page 11

- Earthwork Construction

- Reinforcing Steel I

Material Testing Services

- 430 V Load Center Substation Work in Progress:

o Bid evaluations are in progress for Earthwork Construction j

Class IE motor control center l

Class IE and non-lE battery chargers o issue bid requests for:

- Sump pumps 3 psi pressure resistant doors Structural and miscellaneous steel Distribution panels

- Class IE inverters and distribution panels I'

- Class IE electronic field instruments I

- Fans for category I service

t

Attachment 1 B12480/Page 12 i

.i l -

HVAC (non-Q) l

- Halon fire suppression system o Prepare bid evaluations for subcontract and purchase order Construction

.I Documents issued:

o Construction Procedures issued for Reviews

- General Establishment, Control and Implementation of the Construction Work Plan / Procedure Program Housekeeping for Nuclear Power Plants Document Control Change Request / Notice l

J Field Material Requisition Permanent Plant and Construction Rigging Equipment Inspection and Maintenance U

Rigging i

Testing of Holsting and Transporting Equipment l BPC Construction Safety Tagging and Clearance Procedure B12480/Page 13 Deviation Control Administrative Release Construction Test Field Fabrication Spill Prevention and Control for Oil and Hazardous Substances Safeguards System Turnover Interface Procedures Civil Concrete Operations Grout Operations Structural Steel Core Drilling Hilti Bolts Penetrations i l

Fire Proofing Concrete Joints I

l l

l B12480/Page 14 Concrete Weather Protection Concrete Placement Consolidation of Concrete Grouting Mechanical Equipment Mechanical Alignment Rotating Alignment Instrumentation Piping (Large and Small)

Embedded Piping Pipe Cleanliness Pressure Testing Pipe Hangers Valves (Install)

Valves (Disassembly / Reassembly)

Valves (Packing)

l 1

-Attachment 1 B12480/Page 15 l-Insulation I ~ Field Welds (I'D)

i Electrical Raceway
Cable i

l Terminations i Power Transformers l

j Rotating Equipment 3

j Tray Hangers

! i i

Conduit Hangers

  • i 4 Batteries 1

! Electrical Equipment r

Grounding i

j Cathodic Protection i

l Hi-Pot

Multi-Pin Connectors i

l -

t

- , _ , , . . - , . . _ . - . , - , - _ . . . - , _ , , - --.,-,._ - , ,., , . , _ - - . , a

4 Attachment 1

- B12480/Page 16 .

OCI Control and Issuing of QCis and ACIM Review of Field Material Requisitions, Review ana Approval of MRIs and Performance of Receipt Inspections for Hardware and Documentation QC Monitoring of Material Handling and Storage Processing of Nonconformance Reports Work Plan and Inspection Record Processing Concrete Installation Activities Erection of Structural Steel Backfill for Category I Expansion Anchors 4

Concrete Expansion Anchors Penetration Closures Civil QC Storage Monitoring Checklist Housekeeping Material Testing Service Control and interface Concrete Supplier Control and Interface

't Surveillance of Materials Testing Service Calibration Procedures

, , , .- - ~ ,-, - - - - - .. . . -

Attachment 1 B12480/Page 17 t

Subcontractor Control and Interface Instructions for Processing Administrative Release Packages Instructions for Processing Turnover Packages Collection and Filing of QC Records Mechanical OCis Welding Process Control Welding Documentation Requirements Piping Inspection Activities Machining and Fabrication Inspection Activities Mechanical Equipment Installation Activities System Pressure Testing Instrumentation Inspection A<.tivit; 's Electrical OCis Electrical Monitoring Checklist Inspection of Electrical Equipment Installation- .

Inspection of Electrical Raceway l

s Attachment i B12480/Page 18 i

Inspection of the Fabrication and Installation of "Q" Listed and i Seismic Raceway Hangers and Associated Supplemental Steel l

Inspection of Electrical Cable Installation

^

- Work in Progress:

o Review of engineering specifications and drawings i

o Review of project schedule o- Review of construction estimate o Review of work authorization log i o Review of action items log i

Ouality Assurance Work in Progress:

1 o Review of technical specifications o Review of supplier QA manuals t

o Review of work plans and procedures o Review of quality controlinstructions J l o Prepare Master Audit Plan and Audit Schedule o Review of Jobsite Procurement Instructions l

! i i

l w , e- g -: . - - - , , . v,,--,~,y-- -, , . - - e -, - ev- , ., -. , + --y',y a -

ww n--. ---,-c ,

Attachment 1

.B12480/Page 19

, FOOTNOTES 3

7

1) ' 3. F. Opeka letter to C. I. Grimes, dated June 30,1986, "Haddam Neck Plant, i

Conceptual Design of the New Switchgear_ Room."

a

2) 3. F. Opeka letter to C. I. Grimes, dated September 30,1986, "Haddam Neck -

Plant, Major Implementation Milestones, New Switchgear Building 4

Construction."

L i

1

{

i i

J 4

- . ,_ -, t - -- -,-_, r. - - - - , _ . . .. , - , -, ._, . - - - - ,, - , . , - , .m. .,--.- .--,,,-, ,- -~~ . 4 . - - . - , . , - . , , m--, - - --

18691-A-001 3.8 ARCHITECTURAL FINISHES Metal walls and roof panels shall be galvanized steel with manufac-turer's standard primer / finish on unexposed surfaces and Kynar 500 finish on exposed surfaces.

All structural steel shall be primed with one coat of Keeler and Long 3200 epoxy primer after SP6 cleaning. Structural steel exposed to outdoors shall have one coat of urethane finish. Structural steel which needs to be fireproofed shall not be primed.

CMU and concrete interior walls shall have one filler coat and one coat latex acrylic finish. Concrete floors shall have sealer / hardener finish, but health physics floor level shall have epoxy primer, surfacer, and finish over concrete.

Electrical cable trays and hangers shall be galvanized.

Doors shall have one coat alkyd enamel finish over manufacturer's standard primer.

Stairs and handrails shall be galvanized.

Mechanical, electrical and control equipment shall have manufacturer standard finish, ASA light gray No. 61..

Galvanized pipes shall not be coated. Uninsulated carbon steel pipes and hangers shall have manufacturer standard primer and compatible

, Keeler & Long T-1 series alkyd finish. Finish color of fire safety pipes shall be in accordance with ANSI requirements.

Embedded cast iron pipes shall not be coated.

Valves and associated assemblies shall have manufacturer standard finishas.