Issue date | Title | Topic | |
---|---|---|---|
ML21260A007 | 9 September 2021 | Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay | |
ML18191B171 | 5 July 2018 | Emerson - Submittal of Information Notice, (FIN) 2018-02, Licensees or Purchaser of Deviations or Failures to Comply | Commercial Grade Dedication |
ML18022A282 | 5 January 2018 | Engine Systems, Inc., Submittal of Defects and Non-Compliance Thermostatic Valve Assembly, P/N 6BOCF14001 | Hydrostatic Dedication package |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17090A397 | 28 March 2017 | Part-21 Notification - Willful Misconduct and Falsification of Records | VT-2 |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16209A050 | 13 July 2016 | Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML15103A485 | 7 April 2015 | Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing | |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14261A150 | 17 September 2014 | Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14113A398 | 17 April 2014 | Part 21 - Bearing Defect | Overspeed |
ML14079A353 | 17 March 2014 | Notification of Part 21 Re Bearing Defect | |
ML14042A202 | 5 February 2014 | Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies | Stress corrosion cracking |
ML13277A010 | 23 September 2013 | Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) | Stress corrosion cracking |
ML13246A084 | 23 August 2013 | Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies | |
ML13211A168 | 26 July 2013 | Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing | FLEX Large early release frequency Fire Protection Program |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve | Anchor Darling |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12318A041 | 8 November 2012 | Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves | Commercial Grade Dedication Condition Adverse to Quality |
ML12075A106 | 14 March 2012 | Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML101530564 | 28 May 2010 | Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries | |
ML101530108 | 28 May 2010 | Notification of Potential Part 21 Re Interim Report - Inability to Complete 10 CFR Part 21 Evaluation Regarding Post Corrosion for Dcu Batteries | |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML090350217 | 27 January 2009 | Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency | |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | Commercial Grade |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML080990634 | 4 April 2008 | Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items | Commercial Grade |
ML080810431 | 20 March 2008 | Part 21 Report Involving Potential Failure of Certain Rosemount Pressure Transmitters | |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | Commercial Grade |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML060950401 | 3 April 2006 | Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 | |
ML060330345 | 23 January 2006 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0091, Rev. 0., Woodward DRU Controls (Manufactured Between November 2000 and November 2005) | |
ML050110223 | 7 January 2005 | Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys | |
ML041140335 | 21 April 2004 | Part 21 Notification Involving Voltage Monitoring Relays | |
ML031200116 | 21 April 2003 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR 21-0086, Rev. 0 | Commercial Grade Dedication |
ML021510295 | 15 May 2002 | 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems | |
ML021550249 | 10 May 2002 | Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems |