| Site: | Millstone, Dresden, Peach Bottom, Nine Mile Point, Grand Gulf, Cooper, Brunswick, Vermont Yankee, Farley, Cook, Quad Cities, Shoreham (DPR-002, DPR-012, DPR-019, DPR-021, DPR-029, DPR-030, DPR-044, DPR-046, DPR-056, DPR-058, DPR-062, DPR-063, DPR-065, DPR-071, DPR-074, NPF-002, NPF-008, NPF-029, NPF-037, NPF-049, NPF-066, NPF-069) |
| Issue date: | 01/07/2005 |
| From: | Kwasny M Whiting Corp |
| To: | NRC/RGN-III |
| References | |
| 41318 | |
| Download: ML050110223 (4) | |
Text
N 1
I I
0110712005 U.S. Nuclear Regulatory Comnnmission Operations Center Event Report Pace I General Information or Other (PAR)
Event#
41318 Rep Org: WHITING CORPORATION Notification Date I Time: 01/07/2005 14:47 (EST)
Supplier: WHITING CORPORATION Event Date I Time: 01/05/2005 (CST)
Last Modification: 01/07/2005 Region: 3 Docket #:
City: MONEE Agreement State: Yes County:
License #:
State: IL NRC Notified by: MARK KWASNY Notifications: SONIA BURGESS R3 HQ Ops Officer: JOHN KNOKE GLENN MEYER R1 Emergency Class: NON EMERGENCY MARK LESSER
- R2 10 CFR Section:
LINDA SMITH R4 21.21 UNSPECIFIED PARAGRAPH VERN HODGE NRR OVERSTRESS CONDITION ON SINGLE FAILURE PROOF CRANE TROLLEYS "On January 5, 2005 as a part of a crane re-rate analyses and study Whiting Corporation identified an overstress condition on some hoist equalizer plates and welds. This condition is limited to the hoists of some redundant (single failure proof) cranes.
"Whiting Corporation has performed a preliminary review and have isolated the problem to the family of redundant trolleys also known as single failure proof trolleys. No other types of cranes are affected. It has not been established at this time which specific redundant trolleys are impacted. This assessment will require a cases by case review.
'Whiting Corporation have or are attempting to contact these customers directly to notify them of this circumstance. These are the only potentially impacted customers.
"The hoist units identified above, are to be inspected as follows and then limited to 50% of rated capacity until such time as the units can be evaluated and/or upgraded. The following specific serial numbers can be operated at 100 Tons (SN 10403, 10388, 10389, 10510). SN 10698 is currently being evaluated and is limited in capacity by other factors being addressed with the customer. The area to visually inspect, for cracks in the plates or welds, is the assembly, adjacent to the rope termination, at each end of the equalizer arm, that the nut on the rope fitting bears against. Suspicious visual indications of potential cracks can be further examined by Magnetic Particle testing if warranted. A lack of any visible cracks during visual examination will allow the unit to be placed in operation at the 50% reduced capacity. Please note no reports of field failures or cracks have been reported as of the issuance of this notice.
'The following is a list of the family of redundant (single failure proof) cranes that will require a detailed evaluation.
Niagara Mohawk Power - Nine Mile Point -125 Ton Exelon Corporation (Commonwealth Edison) - Dresden Station -125 Ton 1
II 01/07/2005 U.S. Nuclear Regulatory Commission Operations Center Event Report Paze 2 General Information or Other (PAR)
Event#
41318 Exelon Corporation (Commonwealth Edison) - Quad Cities Station -125 Ton Dominion Nuclear Connecticut-North East Utilities-Millstone (Believed to be Unit 1 in Waterford)-Reactor Room Entergy Nuclear (Vermont Yankee) - Vernon Station - Reactor Room-1 10 Ton Neb. Public Power - Cooper Nuclear Station - Reactor Room -100 Ton Exelon Corporation (Philadelphia Electric) - Peach Bottom -125 Ton (2)
(AEP) (Indiana Michigan power) - D. C. Cook Station -150 Ton Carolina Power & Light - Brunswick Station -125 Ton Southern Nuclear (Alabama Power) - Farley Plant - 125 Ton Energy Northwest (WPPSS) -Hanford Unit # 2 - Reactor Room -125 Ton Progress Energy (PGN) (Carolina Power & Light) - Robinson Station -125 Ton Mississippi Power & Light - Grand Gulf Station -150 Ton (2)
Long Island Lighting - Shoreham Station -125 Ton Constellation Nuclear (Niagara Mohawk Power) - Nine Mile Point Station -125 Ton AEP (Indiana Michigan power) - D. C. Cook Station -150 Ton Indiana Michigan power - D. C. Cook Station - 20 Ton"
It A
IHi FIE WHITING CORPORATION 26000 Whiting Way eMonee, IL 60449-8060 * (708) 587-2000
- FAX: (708) 587-2001 owww.whitingcorp.com January 7, 2005 Nuclear Regulatory Commission USNRC Washington, D. C. 20555 Re: Director Office of Inspection & Enforcement
Reference:
10 CFR 21 Notification Dear Director.
On January 5, 2005 as a part of a crane re-rate analyses and study we identified an overstress condition on some hoist equalizer plates and welds. This condition Is limited to the hoists of some redundant (single failure proof) cranes.
We have performed a preliminary review and have Isolated the problem to the family of redundant trolleys also known as single failure proof trolleys. No other types of cranes are affected. It has not been established at this time which specific redundant trolleys are Impacted. This assessment will require a cases by case review.
The following Is a list of the family of redundant (single failure proof) cranes that will require a detailed evaluation.
Site Bridge Trolley SN SN Niagara Mohawk Power - Nine Mile Point - 125 Ton 9335*
10510' Exelon CorporatIon (Commonwealth Edison) - Dersden Station - 125 Ton 9492 10779 Exelon Corporation (Commonwealth Edison) - Quad Cities Station - 125 Ton 9643 10780 Dominion Nuclear Connecticut-North East Utilities-Mlilstone (Believed to be Unit I In 9655 10727 Waterford)-Reactor Room -
Entergy Nuclear (Vermont Yankee) - Vernon Station - Reactor Room-110 Ton 9975 10680 Neb. Public Power - Cooper Nuclear Station - Reactor Room -100 Ton 9976 10630 Exelon Corporation (Philadelphia Electric) - Peach Bottom -125 Ton 9979 10387 Exelon Corporation (Philadelphia Electric) - Peach Bottom - 125 Ton 9980 10379 (AEP) (Indiana Michigan power) - D. C. Cook Station -150 Ton 10038 12124 Carolina Power & Light - Brunswick Station -.125 Ton 10388' 10388*
Carolina Power & Light - Brunswick Station - 125 Ton 10389*
10389*
Southern Nuclear (Alabama Power) - Farley Plant - 125 Ton 10403*
10403*
Energy Northwest (WPPSS) -Hanford Unit # 2 - Reactor Room - 125 Ton 10541 10541 Progress Energy (PGN) (Carolina Power & Light) - Robinson Station - 125 Ton 10698*
10698*
Mississippi Power & Light - Grand Gulf Station - 150 Ton 10857 10857 Mississippi Power & Light - Grand Gulf Station - 150 Ton 10858 10858 Long Island Ughting - Shoreham Station - 125 Ton 11008 11008
a Constellation Nuclear (Niagra Mohawk Power) - Nine Mile Point Station - 125 Ton 11470 11470 AEP (Indiana Michigan power) - D. C. Cook Station -150 Ton 12115 12115 Indiana Michigan power - D. C. Cook Station - 20 Ton 12115 12115
- = See below for additional details We have or are attempting to contact these customers directly to notify them of this circumstance. These are the only potentially Impacted customers.
The hoist units Identified above, are to be Inspected as follows and then limited to 50% of rated capacity until such time as the units can be evaluated andlor upgraded.
- The following specific serial numbers can be operated at 100 Tons (SN 10403,10388, 10389, 10510). SN 1 0698 Is currently being evaluated and Is limited In capacity by other factors being addressed with the customer. The area to visually inspect, for cracks in the plates or welds, Is the assembly, adjacent to the rope termination, at each end of the equalizer arm, that the nut on the rope fitting bears against. Suspicious visual Indications of potential cracks can be further examined by Magnetic Particle testing if warranted. A lack of any visible cracks during visual examination will allow the unit to be placed In operation at the 50% reduced capacity. Please note no reports of field failures or cracks have been reported as of the Issuance of this notice.
Questions or concerns by crane owners should be addressed to:
whltlna-nuclearSbwhitingcorp.com Please provide the following Information with any requests:
Customer Name, contact person, title, mailing address, e-mall address, telephone #, Whiting Crane serial
- , fax #, date of next scheduled outage, earliest critical lift date, and any specific requests or Information you require.
A hot line has also been established at 708-587-2000 ext 2550.
We will reply as soon as possible, upon completing any necessary research and based on the dates of the earliest critical lift. Thank you for your patience, cooperation and understanding.
If there are any further questions on the part of your regulatory agency please contact me at mikwasnv(Thwhitinpcor.com.
Respectfully, Mark J. Kwasny QA Manager - Whiting Corporation