MONTHYEARML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML18191B1712018-07-0505 July 2018 Emerson - Submittal of Information Notice, (FIN) 2018-02, Licensees or Purchaser of Deviations or Failures to Comply ML18022A2822018-01-0505 January 2018 Engine Systems, Inc., Submittal of Defects and Non-Compliance Thermostatic Valve Assembly, P/N 6BOCF14001 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML14042A2022014-02-0505 February 2014 Part 21 Report Regarding Unqualified Material Used in Electrical Penetration Assemblies ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0842013-08-23023 August 2013 Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12075A1062012-03-14014 March 2012 Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML1015301082010-05-28028 May 2010 Notification of Potential Part 21 Re Interim Report - Inability to Complete 10 CFR Part 21 Evaluation Regarding Post Corrosion for Dcu Batteries ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0903502172009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0808104312008-03-20020 March 2008 Part 21 Report Involving Potential Failure of Certain Rosemount Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0609504012006-04-0303 April 2006 Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 ML0603303452006-01-23023 January 2006 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0091, Rev. 0., Woodward DRU Controls (Manufactured Between November 2000 and November 2005) ML0501102232005-01-0707 January 2005 Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys ML0411403352004-04-21021 April 2004 Part 21 Notification Involving Voltage Monitoring Relays ML0312001162003-04-21021 April 2003 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR 21-0086, Rev. 0 ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2021-09-09
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
ENGINE SYSTEMS, 1NC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 January 5, 2018 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21 -0120 , Rev. 0 Thermostatic Valve Assembly, P/N 6BOCF14001
Dear Sir:
The enclosed report addresses a reportable notification on a thermostatic valve assembly, P/N 6BOCF14001.
A copy of the report has been mailed to our affected nuclear customer.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:---------
93 DATE:
Quality Performance With Pride
ENGINE SYSTEMS, INC.
175 Freight Road , Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0120 Rev. 0: 01/05/18 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Thermostatic Valve Assembly P/N 6BOCF14001 SYSTEM: Emergency Diesel Generator CONCLUSION: Reportable in Accordance With 10CFR21 Prepared By: ~~~+->v--~-* _ _ _ _ _ _ _ __ J Date: ____._I........_5....,_/l_f;_
UEngineering Manager Reviewed By: _:..C::~C--
---~--'--/-~ ;-*~--_-_-:_-_-____ Date: I - fJ~1~
Quality Manager Quality Performance With Pride
Report No. 1 OCFR21-0120 Record of Revisions Page : 1 of 1 REV DATE PAGE DESCRIPTION 0 01/05/18 Initial issue.
Report No. 10CFR21-0120 Revision : 0 Date: 01/05/18 Page : 1 of 2 Pursuant to 10 CFR 21.21 (d)(4), ESI is presenting the required information as follows:
(i) Name and address of the individual or individuals informing the Commission.
Thomas Horner John Kriesel Quality Manager Engineering Manager Engine Systems Inc. Engine Systems Inc.
175 Freight Rd. 175 Freight Rd.
Rocky Mount, NC 27804 Rocky Mount, NC 27804 (ii) Identification of the basic component supplied within the United States which fails to comply or contains a defect.
Thermostatic Valve Assembly, PIN 6BOCF14001 .
(iii) Identification of the firm supplying the basic component which fails to comply or contains a defect.
Engine Systems Inc.
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect of failure to comply.
Two thermostatic valve assemblies were supplied by ES/ that were found to have retaining straps, subcomponents of the internal thermostatic element, detached from the correct position. For each valve assembly, one of the thermostatic elements (the centrally located element) contained this defect. The straps are used in conjunction with a spring to retain the element in a closed position. As the temperature of the sensed fluid increases, a temperature sensitive wax expands to open the element while acting against the spring. As the temperature of the fluid decreases, the wax contracts and the spring returns the element to its closed position. Absence or failure of the straps would prevent proper operation of the element. See Figures 1 and 2 below for visual representation of an element.
VALVE SLEEVE -
VAJ..VE SEAT FIGURE 1 FIGURE 2 (Closed) (Fully stroked)
The thermostatic valve assembly is used on an emergency diesel generator set to regulate the temperature of lubricating oil (other EDGs use this same type of valve for jacket water temperature regulation). If one of the elements within the assembly were to fail, as is the case with a missing strap, regulating capacity of the thermostatic valve could be affected. However, the failure mode in the case of missing straps is in the open position (element does not return closed) and the remaining eight elements would compensate by closing to regulate the fluid temperature. More importantly, detached retaining straps could migrate to other components in the lube oil system. Acting as foreign material, the straps could adversely affect the ability of these critical components to perform their safety-related function within the emergency diesel generator's lube oil piping. The foreign material aspect of this defect makes it a reportable issue. See Figure 3 on the following page for an outline drawing showing typical installation of elements in the valve assembly. Appendix A contains photos of the assembly.
Report No. 10CFR21-0120 Revision : 0 Date: 01 /05/ 18 Page : 2 of 2 FIGURE 3 Thermostatic Valve Assembly (v) The date on which the information of such defect or failure to comply was obtained .
November 22, 2017 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured , or being manufactured for one or more facilities or activities subject to the regulations in this part.
This issue is an isolated incident affecting two thermostatic valves supplied to one nuclear plant.
The nuclear plant detected the issue during inspection and returned the assemblies to ES/.
ES/ Sales Customer ES/ Serial Customer Qty C-of-C Date Order P.O. Numbers American Electric Power - 3016263-1 .1-1 &
3016263 01581583 2 04/03/2017 DC Cook Nuclear Plant 3016263- 1.1-2 (vii) The corrective action wh ich has been , is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action .
For DC Cook: No further action is required, the suspect assemblies have been returned to ES/ for rework.
For ES/: The dedication package for this assembly has been revised to add inspection criteria for the strap inspection and clarification has been added to the functional test procedure to ensure the assembly is drained following hydrostatic testing by tilting the assembly, not by manually actuating the element.
(viii) Any advice related to the potential defect or failure to comply about the facility, activity, or basic component that has been , is being, or will be given to purchasers or licensees .
ES/'s investigation revealed that this issue was induced by a test technician who, in an effort to minimize the amount of test fluid remaining in the assembly after pressure testing, manually actuated the center thermostatic element (there are 9 total elements) to drain a small pocket of residual fluid. This effort to prevent the formation of oxidation had an unintended consequence and resulted in a more serious issue. Though this is an isolated incident as it pertains to items supplied from ES/, this same model thermostatic valve assembly is used extensively on EDGs in the nuclear industry. Those customers that perform valve maintenance, including thermostatic element replacement, should be aware of the possibility of the straps becoming detached if care is not taken.
Report No. 10CFR21 -0120 Revision : 0 APPENDIX A - PHOTOS Page: 1 of 1 Straps missing from center element Straps in thermostatic valve assembly following element removal