1CAN012101, Interim Report Concerning an Evaluation of Deviation | 18 January 2021 | Interim Report Concerning an Evaluation of Deviation | |
ML20296A276 | 6 October 2020 | Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19210D434 | 11 July 2019 | Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 | |
ML19190A043 | 28 June 2019 | Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19008A043 | 4 January 2019 | Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 | |
ML19029A155 | 27 December 2018 | 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 | |
ML18302A228 | 19 October 2018 | Itt Enidine - USNRC 10CFR Part 21 Notification | |
ML18243A511 | 28 August 2018 | Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification | |
ML18159A039 | 6 June 2018 | National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) | |
ML18102A529 | 3 April 2018 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. | Safe Shutdown |
ML18075A355 | 6 March 2018 | 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML17355A139 | 5 December 2017 | Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Final Report Per 10 CFR Part 21 | |
ML17286A024 | 11 October 2017 | Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers | |
ML17250A157 | 31 August 2017 | Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | Anchor Darling |
ML17142A323 | 11 May 2017 | Interim Report Concerning Supply of Stainless Steel Tubing | |
ML17114A069 | 19 April 2017 | Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides | Safe Shutdown Pressure boundary leak |
ML17101A366 | 6 April 2017 | Part 21 Notification - Failure of Vishay Diodes | |
ML17096A269 | 3 April 2017 | Part 21 Notification - Failure of Vishay Diodes | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17075A278 | 28 February 2017 | Part 21 - Potential Transducer Component Defect | |
ML16328A310 | 18 November 2016 | Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 | Foreign Material Exclusion |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML16020A477 | 23 December 2015 | MPR Associates, Inc., - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 | |
ML16004A030 | 23 December 2015 | MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 | |
ML15303A014 | 26 October 2015 | Part 21 Report Regarding Pressure Seal Valve Noncompliance, Per Millstone | Nondestructive Examination |
ML15224A543 | 10 August 2015 | Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance | Nondestructive Examination |
ML15223B266 | 7 August 2015 | Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings | Nondestructive Examination |
ML15201A287 | 8 July 2015 | Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance | Nondestructive Examination |
ML15134A017 | 1 May 2015 | Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves | Flow Induced Vibration |
ML15134A016 | 1 May 2015 | Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML14210A010 | 23 July 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | Safe Shutdown Shutdown Margin Scram Discharge Volume |
ML14204A707 | 23 July 2014 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV | |
ML14079A027 | 13 March 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13094A177 | 18 March 2013 | Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf | |
ML13044A075 | 8 February 2013 | Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology | |
ML13010A518 | 9 January 2013 | Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System | |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12283A246 | 28 September 2012 | Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak | Hydrostatic |
ML12319A012 | 27 September 2012 | Error in Main Steam Line High Flow Calculational Methodology | |
ML12158A447 | 6 June 2012 | Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12088A174 | 27 March 2012 | ATC Nuclear Part 21 Report - Defective 48 Volt DC Safety Related Power Supplies | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML11273A048 | 28 September 2011 | 10 C.F.R. Part 21 Notification of Potential Defect in Solid State Relay | |
ML112700067 | 26 September 2011 | GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Channel-control blade interference |
ML111250239 | 2 May 2011 | 10 C.F.R. Part 21 Notification of Potential Defect, P/N 611130-T13-N SS5 Solid State Relay |