ML16004A030
ML16004A030 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 12/23/2015 |
From: | Damerell P MPR Associates |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RPT-0380-0058-310, Rev. 0 | |
Download: ML16004A030 (7) | |
Text
12/23/2015 U.S. Nuclear Regulatory Commi.*.*ion Oneratinn.* *pntpr i*.vpnt Rpnnrt i*rzo !
Part 21 (PAR) Event# 51619 Rep Org: MPR ASSOCIATES, INC. Notification Date I Time: 12/23/2015 10:25 (EST)
Supplier: MPR ASSOCIATES, INC. Event Date I Time: 10/08/2015 (EST)
Last Modification: 12/23/2015 Region: 1 Docket #:
City: ALEXANDRIA Agreement State: Yes County: License #:
State: VA NRC Notified by: PAUL DAMERELL Notifications: GEORGE HOPPER R2DO HQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:
21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 REPORT - MPR EMERGENCY DIESEL ENGINE TIMING MODULE FAILURE The following is excerpted from a report submitted by MPR Associates, INC.:
"The basic component that contains a defect is an MPR Model 0380-1103 Timing Module. Six modules are in use for the three Emergency Diesel Generators (EDGs) at.Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (F.PGA) to implement a specific pre-p~rogrammed load shedding and load sequencing logic associated with the standby power source safety function of the Hatch Unit 2 EDGs.
"MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
"MPR identified a replacement capacitor model that is suitable for the application and the application is within the manufacturer's recommendations. MPR is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules."
Contact the following for additional information:
Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street' . "
Alexandria, VA 22314 ,, ,/
12/23/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 Ph: 703-519-0269
- MPR DATE: December 23, 2015 FROM: Paul S. Damerell TO; NRC Operations Center Principal Offier COMPANY: U.S. Nuclear Regulatory Commission______________________
FAX: 301-816-5151 COMPANY: MPR Associates, Inc.
PHONE: 30 1-S 16-5100 PHONEB: 703-519-0269 TOTAL PAGES: FIVE (5) - INCL, COVE*R SUBXECT: 10 CFR Part 21 Report (RPT-0380-0058-3 10. Rev.0)
Please find the above-mention document attached for your attention.
RET 20KN VA 22314-3280 Ufl40ALEXANDRIA, 703.S519.0200 FAX: 04902 FX 703-51e-02*4 320KING *'REST, SUITE 400
- MPR December 23, 2015 RPT-0380-0058-3 10, Rev. 0 Document Control Desk U.S. Nuclear Regulatory Commission Washington, 00 20555-0001
Subject:
Report in Accordance with 10 CER Part 21
Dear Sir or Madam:
MPR investigated the failure of a replacement timing module that was one of several MPR supplied to the Edwin I. Hatch Nuclear Plant.
The investigation determined that this failure is reportable based on the requirements of 10 CFR Part 21. The attached 10 CFR Part 21 Report provides the required information.
If you have any questions, please contact the undersigned.
Sincerely, Paul S. DamereUl Principal Officer Attachment
- 20 KIN{3 8TffEET ALIEXANDRIA, 320 KNGSREET VA 22314-3230 703-810.0200FX 0-1902 tpI/wGp~o FAX: 70a-E19-0224 http:l/www, mpr,om
UMPRZ Attachment to MPR Letter dated December 23, 2015 R.PT-03 80-0058-310, Rev. 0 10 CFR Part 21 Report on Replacement Timing Module Failure at Hatch Nuclear Plant This attachment provides the information required for reporting a defeat in accordance with 10 CFR Part 21I.
I1, Reporting Individual Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street Alexandria, VA 22314
- 2. Identification of the Basic Component that Contains a Defect The basic component that contains a defect is an MPR Model 0380-1103 Timing Module.
Six modules are in use at Edwin I. Hatch Nuclear Plant (Plant Hatch) for the three Emergency Diesel Generators (ED~s) at Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (FPCIA) to implement a specific pre-programmed load shedding and load sequencing logic* associated with the standby power source safety function of the Hatch Unit 2 EDGs.
The modules were designed and supplied specifically for use at Plant Hatch Unit 2. There are two modules installed in each EDO. One of the modules implements a timing sequence associated with a Loss of Off Site Power (LOSP). The other module implements a timing sequence associated with a Loss of Coolant Accident (LO CA). Both modules are required to firnction for the EDO to perform its intended safety functions. Both modules include logic for diagnostics and aununci~te an alarm upon failure. The pre-programnmed FPO}A logic cannot be modified in the field.
The extent of condition evaluation determined that all of the modules supplied to Plant Hatch are affected. The defect results from the selection of a circuit board component and is not associated with the FPGA logic. No other modules of this type were supplied by MPR.
- 3. Identification of the Supplier MPR Associates (headquarters in Alexandria, VA) supplied the timing module.
4.1. Nature of the Defect MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfiully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
The MPR investigation determined that four paralleled tantalum capacitors in the input power circuit are used beyond the manufacturer's recommendations. The manufacturer recommends use ait no more than 50% of the rated voltage. The capacitors are used in an application that applies Svoltage within the capacitor voltage rating, but above the reconunended derated voltage. The
-design life of the capacitor at the applied voltage cannot be determined with certainty from available data. y, Since no life cycle information is available for the installed condition, MPR estimated the mean time between failure (MTBF) for the four paralleled tantalum capacitors based on MIL-HDBK-217F Notice 2. The collective MTBF estimated for the 6 timing modules currently installed at Plant Hatch does not indicate an imminent failure of the modules but does show that there is an increased possibility of module failure within the next 20 months.
The module design was tested extensively as part of the equipment qualification process and duringmodule burn in. The tests bounded the installed operating conditions and verified that the design fu~nctions correctly in service. However, the module's design life is now known to be limited by the design life of the capacitors in the input power circuit. Since the design life of the capacitors, and thus the modules, cannot be determined with certainty, MPR concludes the deviation, use of capacitors beyond the manufacturer's recommendations, results in a defect.
4.2. The Safety Hazard Created by the Defect The failure of one of the modules results in 1088 of safety function, wh~ich adv*ersely impacts the ability to provide emergency power from the ED~s. The EDO loads can still be sequenced manually.
5, Date the Defect Information was Obtained One of six installed modules failed o otober 8, 201 The failed module was retured to MPR.
for failure analysis. MPR received the returned item and began troubleshooting activities on October 12, 2015. Troubleshooting activities identified the failed capacitor on October 26, 2015.
MPR Condition Report CR-15-1178 was written on October 26, 2015 to document the module failure and establish actions to address the failure.
- 6. Number and Location of these Basic Components Supplied MPR supplied fourteen Model 0380-11I03 timing modules to Plant Hatch. Six are currently installed. Eight items are in storage at Plant Hatch as spares. The failed item was returned to MPR. One of MPR's retained spare modules was provided to Plant Hatch to replace the failed module. Plant Hatch has retained the replacement module as one of the eight spares. No other timing modules were supplied by MPR.
- 7. Corrective Action Plan MPR notified Plant Hatch regarding the results of the failure analysis. MPR performed another independent review of the design to determine the adequacy of the other components on the module. This review confirmed that no other tantalum capacitors are used above the manufacturer's recommended derating. The review did not identify any other components that are unsuitable for the application.
MPR identified a replacement capacitor model that is suitable for the application and the application is within the manufacturer's recommendations. MPR. is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules.
- 8. Advice Given to Purchasers or Licensees This report generates no additional advice for purchasers or licensees.
Date: lz2/g"/zfo t-*
Michael K. Dunkelberger, QA Director Fia lApproval: Sf~
Žf$zAC Date: ,.. . / ,.-
Paul S. Damerell, Principal Officer 12/23/2015 U.S. Nuclear Regulatory Commi.*.*ion Oneratinn.* *pntpr i*.vpnt Rpnnrt i*rzo !
Part 21 (PAR) Event# 51619 Rep Org: MPR ASSOCIATES, INC. Notification Date I Time: 12/23/2015 10:25 (EST)
Supplier: MPR ASSOCIATES, INC. Event Date I Time: 10/08/2015 (EST)
Last Modification: 12/23/2015 Region: 1 Docket #:
City: ALEXANDRIA Agreement State: Yes County: License #:
State: VA NRC Notified by: PAUL DAMERELL Notifications: GEORGE HOPPER R2DO HQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:
21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 REPORT - MPR EMERGENCY DIESEL ENGINE TIMING MODULE FAILURE The following is excerpted from a report submitted by MPR Associates, INC.:
"The basic component that contains a defect is an MPR Model 0380-1103 Timing Module. Six modules are in use for the three Emergency Diesel Generators (EDGs) at.Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (F.PGA) to implement a specific pre-p~rogrammed load shedding and load sequencing logic associated with the standby power source safety function of the Hatch Unit 2 EDGs.
"MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
"MPR identified a replacement capacitor model that is suitable for the application and the application is within the manufacturer's recommendations. MPR is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules."
Contact the following for additional information:
Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street' . "
Alexandria, VA 22314 ,, ,/
12/23/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 Ph: 703-519-0269
- MPR DATE: December 23, 2015 FROM: Paul S. Damerell TO; NRC Operations Center Principal Offier COMPANY: U.S. Nuclear Regulatory Commission______________________
FAX: 301-816-5151 COMPANY: MPR Associates, Inc.
PHONE: 30 1-S 16-5100 PHONEB: 703-519-0269 TOTAL PAGES: FIVE (5) - INCL, COVE*R SUBXECT: 10 CFR Part 21 Report (RPT-0380-0058-3 10. Rev.0)
Please find the above-mention document attached for your attention.
RET 20KN VA 22314-3280 Ufl40ALEXANDRIA, 703.S519.0200 FAX: 04902 FX 703-51e-02*4 320KING *'REST, SUITE 400
- MPR December 23, 2015 RPT-0380-0058-3 10, Rev. 0 Document Control Desk U.S. Nuclear Regulatory Commission Washington, 00 20555-0001
Subject:
Report in Accordance with 10 CER Part 21
Dear Sir or Madam:
MPR investigated the failure of a replacement timing module that was one of several MPR supplied to the Edwin I. Hatch Nuclear Plant.
The investigation determined that this failure is reportable based on the requirements of 10 CFR Part 21. The attached 10 CFR Part 21 Report provides the required information.
If you have any questions, please contact the undersigned.
Sincerely, Paul S. DamereUl Principal Officer Attachment
- 20 KIN{3 8TffEET ALIEXANDRIA, 320 KNGSREET VA 22314-3230 703-810.0200FX 0-1902 tpI/wGp~o FAX: 70a-E19-0224 http:l/www, mpr,om
UMPRZ Attachment to MPR Letter dated December 23, 2015 R.PT-03 80-0058-310, Rev. 0 10 CFR Part 21 Report on Replacement Timing Module Failure at Hatch Nuclear Plant This attachment provides the information required for reporting a defeat in accordance with 10 CFR Part 21I.
I1, Reporting Individual Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street Alexandria, VA 22314
- 2. Identification of the Basic Component that Contains a Defect The basic component that contains a defect is an MPR Model 0380-1103 Timing Module.
Six modules are in use at Edwin I. Hatch Nuclear Plant (Plant Hatch) for the three Emergency Diesel Generators (ED~s) at Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (FPCIA) to implement a specific pre-programmed load shedding and load sequencing logic* associated with the standby power source safety function of the Hatch Unit 2 EDGs.
The modules were designed and supplied specifically for use at Plant Hatch Unit 2. There are two modules installed in each EDO. One of the modules implements a timing sequence associated with a Loss of Off Site Power (LOSP). The other module implements a timing sequence associated with a Loss of Coolant Accident (LO CA). Both modules are required to firnction for the EDO to perform its intended safety functions. Both modules include logic for diagnostics and aununci~te an alarm upon failure. The pre-programnmed FPO}A logic cannot be modified in the field.
The extent of condition evaluation determined that all of the modules supplied to Plant Hatch are affected. The defect results from the selection of a circuit board component and is not associated with the FPGA logic. No other modules of this type were supplied by MPR.
- 3. Identification of the Supplier MPR Associates (headquarters in Alexandria, VA) supplied the timing module.
4.1. Nature of the Defect MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfiully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
The MPR investigation determined that four paralleled tantalum capacitors in the input power circuit are used beyond the manufacturer's recommendations. The manufacturer recommends use ait no more than 50% of the rated voltage. The capacitors are used in an application that applies Svoltage within the capacitor voltage rating, but above the reconunended derated voltage. The
-design life of the capacitor at the applied voltage cannot be determined with certainty from available data. y, Since no life cycle information is available for the installed condition, MPR estimated the mean time between failure (MTBF) for the four paralleled tantalum capacitors based on MIL-HDBK-217F Notice 2. The collective MTBF estimated for the 6 timing modules currently installed at Plant Hatch does not indicate an imminent failure of the modules but does show that there is an increased possibility of module failure within the next 20 months.
The module design was tested extensively as part of the equipment qualification process and duringmodule burn in. The tests bounded the installed operating conditions and verified that the design fu~nctions correctly in service. However, the module's design life is now known to be limited by the design life of the capacitors in the input power circuit. Since the design life of the capacitors, and thus the modules, cannot be determined with certainty, MPR concludes the deviation, use of capacitors beyond the manufacturer's recommendations, results in a defect.
4.2. The Safety Hazard Created by the Defect The failure of one of the modules results in 1088 of safety function, wh~ich adv*ersely impacts the ability to provide emergency power from the ED~s. The EDO loads can still be sequenced manually.
5, Date the Defect Information was Obtained One of six installed modules failed o otober 8, 201 The failed module was retured to MPR.
for failure analysis. MPR received the returned item and began troubleshooting activities on October 12, 2015. Troubleshooting activities identified the failed capacitor on October 26, 2015.
MPR Condition Report CR-15-1178 was written on October 26, 2015 to document the module failure and establish actions to address the failure.
- 6. Number and Location of these Basic Components Supplied MPR supplied fourteen Model 0380-11I03 timing modules to Plant Hatch. Six are currently installed. Eight items are in storage at Plant Hatch as spares. The failed item was returned to MPR. One of MPR's retained spare modules was provided to Plant Hatch to replace the failed module. Plant Hatch has retained the replacement module as one of the eight spares. No other timing modules were supplied by MPR.
- 7. Corrective Action Plan MPR notified Plant Hatch regarding the results of the failure analysis. MPR performed another independent review of the design to determine the adequacy of the other components on the module. This review confirmed that no other tantalum capacitors are used above the manufacturer's recommended derating. The review did not identify any other components that are unsuitable for the application.
MPR identified a replacement capacitor model that is suitable for the application and the application is within the manufacturer's recommendations. MPR. is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules.
- 8. Advice Given to Purchasers or Licensees This report generates no additional advice for purchasers or licensees.
Date: lz2/g"/zfo t-*
Michael K. Dunkelberger, QA Director Fia lApproval: Sf~
Žf$zAC Date: ,.. . / ,.-
Paul S. Damerell, Principal Officer