MONTHYEARML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML18159A0392018-06-0606 June 2018 National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16020A4772015-12-23023 December 2015 MPR Associates, Inc., - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML16004A0302015-12-23023 December 2015 MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML0623700952006-08-21021 August 2006 Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable ML0228102902002-09-30030 September 2002 Main Steam Line Valve Out-of-Service Final Report 2019-07-11
[Table view] Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 ML23032A3322024-04-24024 April 2024 Issuance of Amendments Nos. 322 and 267, Regarding LAR to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in TS Table 1.1-1, Modes 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML23275A2402024-03-22022 March 2024 SNC Fleet - Issuance of Environmental Assessment and Finding of No Significant Impact Regarding Exemption from the Requirements of 10 CFR Part 73, Section 73.2, Definitions (EPID Nos. L-2023-LLE-0018 & L-2023-LLE-0021) - Letter NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 2024-09-09
[Table view] |
Text
SMPR December 23, 2015 RPT-0380-0058-3 10, Rev. 0 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Report in Accordance with 10 CFR Part 21
Dear Sir or Madam:
MPR investigated the failure of a replacement timing module that was one of several MPR supplied to the Edwin I. Hatch Nuclear Plant.
The investigation determined that this failure is reportable based on the requirements of 10 CFR Part 21. The attached 10 CFR Part 21 Report provides the required information.
If you have any questions, please contact the undersigned.
Sincerely, Paul S. Damerell Principal Officer Attachment N
320 KING STREET ALEXANDRIA, ,VA 22314-3230'. 32KNGSRET LXADRA V2314320 703-519-0200 FAX: 703-519-0224 ht:/w~p~o http://www.mpr.com
.,,;i :..-.. '" " . ', . *.": : *. 'i ; " ,"
!AMPR Attachment to MPR Letter dated December 23, 2015 RPT-0380-0058-3 10, Rev. 0 10 CFR Part 21 Report on Replacement Timing Module Failure at Hatch Nuclear Plant This attachment provides the information required for reporting a defect in accordance with 10 CFR Part 21.
1o Reporting Individual Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street Alexandria, VA 22314
- 2. Identification of the Basic Component that Contains a Defect The basic component that contains a defect is an MPR Model 0380-1103 Timing Module.
Six modules are in use at Edwin I. Hatch Nuclear Plant (Plant Hatch) for the three Emergency Diesel Generators (EDGs) at Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (FPGA) to implement a specific pre-progranmmed load shedding and load sequencing logic associated with the standby power source safety.,
function of the Hatch Unit 2 EDGs.
The modules were designed and supplied specifically for use at Plant Hatch Unit 2. There are two modules installed in each EDG. One of the modules implements a timing sequence associated with a Loss of Off Site Power (LOSP). The other module implements a timing sequence associated with a Loss of Coolant Accident (LOCA). Both modules are required to function for the EDG to perform its intended safety functions. Both modules include logic for diagnostics and annunciate an alarm upon failure. The pre-programmed FPGA logic cannot be modified in the field.
The extent of condition evaluation determined that all of the modules supplied to Plant Hatch are affected. The defect results from the selection of a circuit board component and is not associated with the FPGA logic. No other modules of this type were supplied by MPR.
- 3. Identification of the Supplier MPR Associates (headquarters in Alexandria, VA) supplied the timing module.
- 4. Nature of the Defect and the Safety Hazard Created 4.1. Nature of the Defect MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
The MPR investigation determined that four paralleled tantalum capacitors in the input power circuit are used beyond the manufacturer's recommendations. The~manufacturer recommends use at no more than 50% of the rated voltage. The capacitors are used in an application that applies voltage within the capacitor voltage rating, but above the recommended derated voltage. The design life of the capacitor at the applied voltage cannot be determined with certainty from available data.
Since no life cycle information is available for the installed condition, MPR estimated the mean time between failure (MTBF) for the four paralleled tantalum capacitors based on MIL-HDBK-217F Notice 2. The collective MTBF estimated for the 6 timing modules currently installed at Plant Hatch does not indicate an imminent failure of the modules but does show that there is an increased possibility of module failure within the next 20 months.
The module design was tested extensively as part of the equipment qualification process and during module bum in. The tests bounded the installed operating conditions and verified that the design functions correctly in service. However, the module's design life is now known to be limited by the design life of the capacitors in the input power circuit. Since the design life~ of the capacitors, and thus the modules, cannot be determined with certainty, MPR concludes the deviation, use of capacitors beyond the manufacturer's recommendations, results in a defect.
4.2. The Safety Hazard Created by the Defect The failure of one of the modules results in loss of safety function, which adversely impacts the ability to provide emergency power from the EDGs. The EDG loads can still be sequenced manually.
- 5. Date the Defect Information was Obtained One of six installed modules failed on October 8, 2015. The failed module was returned to MPR for failure analysis. MPR received the returned item and began troubleshooting activities on October 12, 2015. Troubleshooting activities identified the failed capacitor on October 26, 2015.
MPR Condition Report CR-15-178 was written on October 26, 2015 to document the module failure and establish actions to address the failure.
- 6. Number and Location of these Basic Components Supplied MPR supplied fourteen Model 0380-1103 timing modules to Plant Hatch. Six are currently installed. Eight items are in storage at Plant Hatch as spares. The failed item was returned to MPR. One of MPR's retained spare modules was provided to Plant Hatch to replace the failed module. Plant Hatch has retained the replacement module as one of the eight spares. No other timing modules were supplied by MPR.
- 7. Corrective Action Plan MPR notified Plant Hatch regarding the results of the failure analysis. MPR performed another independent review of the design to determine the adequacy of the other'components on the module. This review confirmed that no other tantalum capacitors are used above the manufacturer's recommended derating. The review did not identify any other components that are unsuitable for the application.
MPR identified a replacement capacitor model that is suitable for the application and the:
application is within the manufacturer's recommendations. MPR is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules.
- 8. Advice Given to Purchasers or Licensees This report generates no additional advice for purchasers or licensees.
QA Approval: **JA- Date: 1l_7Z3/Zolu Michael K. Dunkelberger, QA Director Final Approval: ___________4.¢. Date: /2.-/2 */2. 1S-Paul S. Damnerell, Principal Officer SMPR December 23, 2015 RPT-0380-0058-3 10, Rev. 0 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Report in Accordance with 10 CFR Part 21
Dear Sir or Madam:
MPR investigated the failure of a replacement timing module that was one of several MPR supplied to the Edwin I. Hatch Nuclear Plant.
The investigation determined that this failure is reportable based on the requirements of 10 CFR Part 21. The attached 10 CFR Part 21 Report provides the required information.
If you have any questions, please contact the undersigned.
Sincerely, Paul S. Damerell Principal Officer Attachment N
320 KING STREET ALEXANDRIA, ,VA 22314-3230'. 32KNGSRET LXADRA V2314320 703-519-0200 FAX: 703-519-0224 ht:/w~p~o http://www.mpr.com
.,,;i :..-.. '" " . ', . *.": : *. 'i ; " ,"
!AMPR Attachment to MPR Letter dated December 23, 2015 RPT-0380-0058-3 10, Rev. 0 10 CFR Part 21 Report on Replacement Timing Module Failure at Hatch Nuclear Plant This attachment provides the information required for reporting a defect in accordance with 10 CFR Part 21.
1o Reporting Individual Paul Damerell, Principal Officer MPR Associates, Inc.
320 King Street Alexandria, VA 22314
- 2. Identification of the Basic Component that Contains a Defect The basic component that contains a defect is an MPR Model 0380-1103 Timing Module.
Six modules are in use at Edwin I. Hatch Nuclear Plant (Plant Hatch) for the three Emergency Diesel Generators (EDGs) at Plant Hatch Unit 2. Eight modules are at Plant Hatch as spares. The modules use a field programmable gate array (FPGA) to implement a specific pre-progranmmed load shedding and load sequencing logic associated with the standby power source safety.,
function of the Hatch Unit 2 EDGs.
The modules were designed and supplied specifically for use at Plant Hatch Unit 2. There are two modules installed in each EDG. One of the modules implements a timing sequence associated with a Loss of Off Site Power (LOSP). The other module implements a timing sequence associated with a Loss of Coolant Accident (LOCA). Both modules are required to function for the EDG to perform its intended safety functions. Both modules include logic for diagnostics and annunciate an alarm upon failure. The pre-programmed FPGA logic cannot be modified in the field.
The extent of condition evaluation determined that all of the modules supplied to Plant Hatch are affected. The defect results from the selection of a circuit board component and is not associated with the FPGA logic. No other modules of this type were supplied by MPR.
- 3. Identification of the Supplier MPR Associates (headquarters in Alexandria, VA) supplied the timing module.
- 4. Nature of the Defect and the Safety Hazard Created 4.1. Nature of the Defect MPR Timing Module Part Number 0380-1103, Serial Number 16 failed after operating successfully, along with five other installed modules, for more than eight months. The module failure resulted from a capacitor short in the input power circuit. When the capacitor shorted, the module ceased to function and annunciated its failure in the Main Control Room. The other five installed modules have given no indication of failure to date.
The MPR investigation determined that four paralleled tantalum capacitors in the input power circuit are used beyond the manufacturer's recommendations. The~manufacturer recommends use at no more than 50% of the rated voltage. The capacitors are used in an application that applies voltage within the capacitor voltage rating, but above the recommended derated voltage. The design life of the capacitor at the applied voltage cannot be determined with certainty from available data.
Since no life cycle information is available for the installed condition, MPR estimated the mean time between failure (MTBF) for the four paralleled tantalum capacitors based on MIL-HDBK-217F Notice 2. The collective MTBF estimated for the 6 timing modules currently installed at Plant Hatch does not indicate an imminent failure of the modules but does show that there is an increased possibility of module failure within the next 20 months.
The module design was tested extensively as part of the equipment qualification process and during module bum in. The tests bounded the installed operating conditions and verified that the design functions correctly in service. However, the module's design life is now known to be limited by the design life of the capacitors in the input power circuit. Since the design life~ of the capacitors, and thus the modules, cannot be determined with certainty, MPR concludes the deviation, use of capacitors beyond the manufacturer's recommendations, results in a defect.
4.2. The Safety Hazard Created by the Defect The failure of one of the modules results in loss of safety function, which adversely impacts the ability to provide emergency power from the EDGs. The EDG loads can still be sequenced manually.
- 5. Date the Defect Information was Obtained One of six installed modules failed on October 8, 2015. The failed module was returned to MPR for failure analysis. MPR received the returned item and began troubleshooting activities on October 12, 2015. Troubleshooting activities identified the failed capacitor on October 26, 2015.
MPR Condition Report CR-15-178 was written on October 26, 2015 to document the module failure and establish actions to address the failure.
- 6. Number and Location of these Basic Components Supplied MPR supplied fourteen Model 0380-1103 timing modules to Plant Hatch. Six are currently installed. Eight items are in storage at Plant Hatch as spares. The failed item was returned to MPR. One of MPR's retained spare modules was provided to Plant Hatch to replace the failed module. Plant Hatch has retained the replacement module as one of the eight spares. No other timing modules were supplied by MPR.
- 7. Corrective Action Plan MPR notified Plant Hatch regarding the results of the failure analysis. MPR performed another independent review of the design to determine the adequacy of the other'components on the module. This review confirmed that no other tantalum capacitors are used above the manufacturer's recommended derating. The review did not identify any other components that are unsuitable for the application.
MPR identified a replacement capacitor model that is suitable for the application and the:
application is within the manufacturer's recommendations. MPR is working with Plant Hatch to develop a schedule for rework to restore the expected design life of the timing modules.
- 8. Advice Given to Purchasers or Licensees This report generates no additional advice for purchasers or licensees.
QA Approval: **JA- Date: 1l_7Z3/Zolu Michael K. Dunkelberger, QA Director Final Approval: ___________4.¢. Date: /2.-/2 */2. 1S-Paul S. Damnerell, Principal Officer