 Issue dateTitleTopic
ML20079B85910 June 1991Interim Deviation/Noncompliance Rept 067 Re dry-type Insulator Cracking in Transformer Supplied by Westinghouse.Initially Reported on 910513.Util Notified Vendor on 910430 That Problem Affects Class 1E Transformer
ML20245B87021 April 1989Deficiency & Part 21 Rept Re Degradation of Nonmetallic Components & Sludge Formation in Lubricating Oil.Initially Reported on 890327.Degradation of Nonmetallic Parts & Fouled Bearings EvaluatedCoatings
ML20236P00613 November 1987Final Part 21 & Deficiency Rept Re Failure of LPSI Pump When Energized.Initially Reported on 840523.Results of C-E Analytical & Test Program Showed That Excessive Shaft Deflection Eliminated by Use of Larger Diameter Motor ShaftSafe Shutdown
ML20214M64727 May 1987Final Deficiency Rept NY-QA-8 Re Atwood & Morrill Natural Frequency ASME III Active Valves,Identified During Ebasco Engineering Review.Initially Reported on 870515.Valves Will Be Reanalyzed & Modified.Not Reportable Per 10CFR50.55(e)
ML20214E46815 May 1987Deficiency Rept Re Natural Frequency of ASME III Active Valves.Initially Reported on 870413.Interim/final Rept Will Be Submitted by 870527
ML20207F10318 December 1986Final Deficiency Rept Re Four Elgar Corp Static Uninterruptible Power Supply Units That Could Potentially Result in Failure of Class 1E 120-volt Vital Ac Bus. Condition Not Reportable Per 10CFR50.55(e)
ML20214W77126 November 1986Interim Deficiency Rept Re Uninterruptible Power Supply Assembly Deficiencies.Initially Reported on 860708. Final Rept Will Be Provided by 870116
ML20215G53510 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20215G68010 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20212N13725 August 1986Part 21 Rept Re Potentially Defective Operation of Synchro-Start Products,Inc Synchronizing Speed Switches Used in Auxiliary Generating Equipment.Initally Reported on 860820.Next Rept Will Be Submitted by 860926
ML20205G0208 August 1986Interim Deficiency Rept 64 Re Uninterruptible Power Supply Assembly Defects.Initially Reported on 860708.Cracked or Stressed Fuse Blocks Will Be Replaced by Nov 1986.Final Rept Anticipated by 861201
ML20202H22726 March 1986Part 21 & Final Deficiency Rept D/N 62 Re Potential Overspeed Trip in Diesel Generators Mfg by Colt Industries. Initially Reported on 860224.Vendor Forwarded Proposed Mods Whereby Air Will Be Positively Vented After Engine StartedSafe Shutdown
ML20151Y8144 February 1986Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost CylinderSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Design basis earthquake
Process Control Program
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
ML20137J46027 December 1985Interim Deficiency Rept Re Rejectable Suction Nozzle Weld Defect on Ingersoll-Rand HPSI Pump.Initially Reported on 851127.C-E Performing Technical Review of Defect.Final Rept Will Be Submitted Upon Receipt of C-E Review ResultsSafe Shutdown Earthquake
ML20133E11127 September 1985Final Part 21 & Deficiency Rept D/N 59 Re Possible Fractured or Cracked Welds on Louis Allis Emergency Standby Generators.Initially Reported on 850624.Item Not Reportable Per 10CFR50.55(e)
ML20209H8384 September 1985Final Part 21 & Deficiency Rept 58 Re Titus Products Tension Wires.Initially Reported on 850311.Tension Wires Replaced & Air push-on Locknuts Installed to Secure Wires to Shafts of Air Deflection Blades
ML20133P16124 July 1985Interim Part 21 & Deficiency Rept D/N 59 Re Cracked Welds on Diesel Generator Air Deflectors Supplied by Louis-Allis Co. Initially Reported on 850624.Corrective Actions Not Received from Vendor.Next Rept Expected by 850927
ML20128K1911 July 1985Deficiency Rept D/N 52 Re LPSI Pump Failures.Pump Evaluation Necessary for Final Rept Not Yet Received.Final Rept to Be Provided as Soon as Info Received
ML20115J9201 April 1985Final Deficiency Rept Re Brown Boveri Voltage Balance Relays W/Excessive Operating Time.Initially Reported on 850227. Relays Removed from Control Panels & Returned to Vendor for Replacements.Item Not Reportable Per 10CFR50.55(e)Safe Shutdown
ML20115D04929 March 1985Interim Deficiency Rept (D/N 58) Re Titus Model 272 Grille Tension Wire Failing to Remain in Place.Initially Reported on 850311.Existing Tension Wires Will Be Replaced
ML20112E6637 March 1985Interim Deficiency Rept Re Failure of Borg-Warner 2-inch HPSI Header Isolation Valves.Initially Reported on 850204. Opening Torque Switch Light Bypassed & Valve Yoke Tack Welded to Valve Body
ML20113A53827 December 1984Final Part 21 & Deficiency Rept Re Damaged Wires on Westinghouse Ds/Dsl Circuit Breakers.Initially Reported on 841012.Damaged Wires Will Be Replaced & Addl Wire Ties InstalledSafe Shutdown
ML20101B1573 December 1984Corrected Final Deficiency Rept (D/N 55) Re Foxboro N-2AC Module Fuse Pin Damage.Fabrication Dates for Defective Modules Should Be May 1981 - Jul 1982
ML20100F91121 November 1984Final Deficiency Rept (D/N 55) Re Foxboro N-2AC Module Fuse Pin Damage.Initially Reported on 841026.Defective Modules Will Be Replaced Prior to Startup
ML20100H59916 November 1984Deficiency Rept (D/N 54) Re Defective Westinghouse Ds/Dsl Circuit Breakers.Field Insp of All Applicable Class 1E Circuit Breakers in Progress to Determine Extent of Problem. Next Rept Will Be Submitted by 841228
ML20099H19613 November 1984Part 21 & Final Deficiency Rept (D/N 53) Re Rockbestos Cable Insulation Damage.Initially Reported on 841012.Four Installed Cables Having Reworked Areas Will Be Identified & Either Removed or Abandoned
ML20099F4916 November 1984Interim Deficiency Rept D/N 51 Re Potential Defect in Reactor Coolant Pump.Initially Reported on 830927.Final Rept Will Be Submitted Upon Receipt of C-E Specific Repair Program
ML20094Q8047 August 1984Part 21 Rept Re Tension Wires on Titus Grille,Model 272, Not Remaining in Place When Deflection Blades Closed. Affected Job Sites Identified in Encl.Products Being Tested Provide Acceptable Fix for Retention
ML20094Q8287 August 1984Part 21 Rept Re Failure of Tension Wires Used for Adjustment of Blades on Grille Model 272.Testing to Identify Rework Methods to Be Utilized in Progress
ML20092M79922 June 1984Interim Deficiency Rept D/N 52 Re LPSI Pump Failures. Initially Reported on 840523.Corrective Action Will Be Proposed Upon Completion of Investigation.Final Rept Will Be Provided by 850630
ML17325B67020 June 1984Final Deficiency Rept (D/N#49) Re Nonconforming Weld Repair of Beam Cope Burn Cuts.Initially Reported on 830624.Total of 1,442 Beam Assemblies Examined,Including 3,318 Coped Corners.All Physical Repair Activities CompletedBoric Acid
ML20197H1744 June 1984Interim Deficiency Rept Re C-E Sys 80 Reactor Coolant Pump Hydraulic Defect.Initially Reported on 830927.Design Problems Identified & Corrected.Next Rept Will Be Submitted by 841101
ML20080G53631 January 1984Interim Deficiency Rept D/N 49 Re Nonconforming Weld Repair of Beam Cope Burn Cuts.Cb&I Will Complete Investigation & Forwards Results to Ebasco by Apr 1984.Final Rept Expected by 840615
ML20083B6816 December 1983Final Deficiency Rept Re Main Steam & Feedwater Penetration Anchors.Initially Reported on 830426.No Addl Deficiencies Found.Ebasco Procedures RevisedSafe Shutdown Earthquake
ML20082E6458 November 1983Interim Deficiency Rept D/N 49 Re Nonconforming Weld Repair of Beam Cope Burn Cuts.Initially Reported on 830722.Similar Deficiencies May Have Occurred in Jet Impingement Barrier Matls.Final Rept Will Be Submitted by 840215
ML20082E36131 October 1983Interim Deficiency Rept 51 Re Reactor Coolant Pump Defect. Initially Reported on 830927.Cause Under Investigation. Existing Design Will Be Retested W/Addl Instrumentation. Final Rept Will Be Provided by 840601
ML20076L5952 September 1983Final Deficiency Rept 50 Re Cracked Weld & Loose Parts in C-E Steam Generators.Initially Reported on 830801.Documented Missing,Damaged or Defective Parts & Loose Parts TightenedLiquid penetrant
ML20080D32617 August 1983Interim Deficiency Rept NY-QA-5 Re Main Steam & Feedwater Penetration Anchors.Addl Time Required to Complete Comprehensive Evaluation.Final Rept Submittal Anticipated by 831205
ML20077Q5131 August 1983Interim Deficiency Rept NY-QA-5 Re Main Steam & Feedwater Penetration Anchors.Initially Reported on 830609.Pipe Rupture Analysis & Seismic Analyses Conducted.Final Rept Expected by 830915
ML20024D17122 July 1983Interim Deficiency Rept Re Nonconforming Weld Repair of Beam Cope Burn Cuts.Initially Reported on 830624.Cause & Extent of Burn Cuts & Nonconforming Weld Problem Investigated.Final Rept Scheduled for 840215
ML20024A4389 June 1983Interim Deficiency Rept NY-QA-5 Re Main Steam & Feedwater Penetration Anchor Stress Analyses.Initially Reported on 830426.Engineering Procedure Revised & Analyses Performed. Final Rept Expected by 830729
ML20069M43720 April 1983Final Deficiency Rept Re Rockbestos Insulated Cable Type D60-1.Initially Reported on 821203.Dented Cable to Be Reworked to Restore Cable to Original Specified Thickness. Deficiency Determined Not Reportable Under 10CFR50.55(e)
ML20074A7576 April 1983Supplemental Final Deficiency Rept Re Safety Injection Tank safe-end Indications (D/N 23).Safe-end-to-nozzle-welds for Injection Tanks Reradiographed,Approved & Accepted Per Spec & ASME Code Requirements
ML20072R01525 March 1983Part 21 Rept Re Deviation in Quality of Shielded Instrumentation Cables.Initially Reported on 820412.Problem Determined Not to Be Reportable Per Part 21
ML20069E69514 March 1983Final Deficiency Rept Re Failure of Structural Welds to Meet Aws Min Weld Size Requirements.Initially Reported on 821124. Condition Not Reportable Per 10CFR50.55(e) Based on Satisfactory Completion of Qualification Testing
ML20071D3672 March 1983Final Deficiency Rept Re Safety Injection Tank safe-end Indications (D/N 23).All Linear Indications Found in safe-end-to-nozzle Welds of Safety Injection Tanks 3 & 4 Removed & Rewelded Per ASME Section XI Plan
ML20071D7142 March 1983Final Deficiency Rept Re Safety Injection Tanks - safe-end Indications.All Linear Indications in safe-end-to-nozzle- Welds in Safety Injection Tanks 3 & 4 Removed & Rewelded Per ASME Section XI Plan.Final Radiographs Verified Repairs
ML20065B58411 February 1983Final Deficiency Rept D/N 44 Re Compressible Matl - Embedded Containment Penetrations.Initially Reported on 820921.Load Case Test Results Confirm Subj Deficiency Not Reportable Per 10CFR50.55(e)
ML20065B5078 February 1983Final Deficiency Rept D/N 46 Re Diffuser Retaining Cap Screws on Reactor Coolant Pumps.Initially Reported on 821105.Cap Screw Matl Heat Treatment Changed So Matl Not Susceptible to Hydrogen Corrosion CrackingCoast down
ML20070V9808 February 1983Final Deficiency Rept Re Failed Diffuser Retaining Cap Screws to Sys 80 Reactor Coolant Pumps.Cap Screw Matl Heat Treatment Will Be Changed to Prevent Hydrogen Embrittlement/ Stress Corrosion Cracking.Not Reportable Per 10CFR50.55(e)Coast down