ML20094Q828

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Failure of Tension Wires Used for Adjustment of Blades on Grille Model 272.Testing to Identify Rework Methods to Be Utilized in Progress
ML20094Q828
Person / Time
Site: Satsop
Issue date: 08/07/1984
From: Stewart Schneider
PHILLIPS INDUSTRIES, INC.
To: Nutt W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
REF-PT21-84-420-000 PT21-84-420, PT21-84-420-000, NUDOCS 8408200349
Download: ML20094Q828 (1)


Text


TITUS PRODUCTS ms g g,,, ,,

214-699-1030 Division of Philips Industries Inc.

SD - SON Manufacturing Quakty Components for Better Building . August 7, 1984 Washington Public Power Supply System Unit III P.O. Box 1223 Elma, Washington 98541 Attention: Wayne Nutt Construction Supervisor

Subject:

Model 272 Grille, Tension Wires It has recently come to our attention that some of the tension wires used for adjustment of the blades on Grille Model 272 will not remain in place when the blades are closed.

A review is being conducted for the total number of grilles supplied and will be forthcoming identifying the total scope.

Testing is being conducted to identify rework methods to be utilized. Upon completion Titus will schedule personnel to complete rework.

Titus Products has notified the Nuclear Regulatory Commission of this situation in accordance with the requirements of 10 CFR Part 21.

We will be contacting you with further information and making arrangements to rework the subject grilles.

Sincerely, TITUS PRODUCTS DIVISION S teven L. Schneider President cc: Ned Ryan Marv DeHart Richard Yarges 8400200 00 DR AD 0 PDR I/ (A 1 0 LASCO DIVISIONeLAU DIVISIONoMALTA DIVISIONeM ANUFACTURED HOUSING /RECRE ATIONAt. VEHICLE GROUP RUSKIN DIVISIONeTITUS PRODUCTS DIVISION

_ _ _ ___