ML20101B157

From kanterella
Jump to navigation Jump to search
Corrected Final Deficiency Rept (D/N 55) Re Foxboro N-2AC Module Fuse Pin Damage.Fabrication Dates for Defective Modules Should Be May 1981 - Jul 1982
ML20101B157
Person / Time
Site: Satsop
Issue date: 12/03/1984
From: Kohler A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
(DN#55), G, GO3-84-753, O-84-753, NUDOCS 8412200137
Download: ML20101B157 (1)


Text

. . .

fiECayEg vite Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)48 M428 ~7 fy ll: lp REG!mlllv-Docket No.: 50-508 December 3, 1984 G03-84-753 U.S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 945 % -5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

NUCLEAR PROJECT N0. 3 P0TENTIAL 10CFR50.55(e) DEFICIENCY FOXBOR0 N-2AC MODULE FUSE PIN DAMAGE (D/N#55)

Reference:

G03-84-733, A. D. Kohler to D. F. Kirsch, same subject, dated ,

November 21, 1984.

The referenced letter provided your office with the final Supply System approved report for the subject 10CFR50.55(e) deficiency. In the " Description of the Deficiency" portion of the report it was incorrectly reported that the defective modules were fabricated from May 1,1984 to July 1987. The correct fabrication dates are May 1, 1981 to July 1982.

Should you have any questions or desire further information, please contact me directly.

L A. D. Kohler (760)

WNP-3 Program Director cc: J. Adams, NESCO D. Smithpeter, BPA Ebasco Elma Ebasco, New York INP0 E. M. Burton, Pacific Power & Light Co.

R. D. Hill, Puget Sound Power & Light Company P. Inman, Washington Water Power Company A. A. Tuzes, Combustion Engineering, Inc.

B. D. Withers, Portland General Electric Company Document Control Desk - U.S. NRC B412200137 841203 PDR ADOCK 05000508-S PDR' ,

IQ 52 L _ - - - - - - - - - - - -- --