Interim Deficiency Rept D/N 51 Re Potential Defect in Reactor Coolant Pump.Initially Reported on 830927.Final Rept Will Be Submitted Upon Receipt of C-E Specific Repair Program
ML20099F491
Person / Time
Site: Satsop
Issue date: 11/06/1984
From: Rohler A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
D-N-#51, G3-84-702, GO3-84-702, NUDOCS 8411260451
Download: ML20099F491 (2)


Text

._ _. ._ _

y ,. ,

f.5CEIVED HRC Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-44381 N0'! -3 M C 54

!!EG!!#WM5 November 6, 1984 G03-84-702 O .U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, Collfurnia 94596-5368 Attention: Mr. D. F. Kirsch, Director, Acting Division of Resident Reactor Projects and Engineering Programs

Subject:

DOCKET 50-508 NUCLEAR PROJECT N0. 3 P0TENTIAL 10 CFR 50.55(e) DEFICIENCY REACTOR COOLANT PUMP DEFICIENCIES D/N #51

Reference:

G03-84-367, A. D. Kohler to T. W. Bishop, same subject, dated June 4, 1984.

On September 27, 1983, the Supply System notified your office of a potential 10 CFR 50.55 (e) deficiency concerning the subject condition.

The referenced letter subsequently provided a status of corrective actions and noted that a final report would be submitted by November 1984.

To-date, Ebasco has not received adequate information from Combustion Engineering (CE) to fully address the deficiencies and corrective actions. CE is in the process of developing a specific repair program for deficiencies found in the WNP-3 reactor coolant pumps on the basis of the fix and test experience for identical reactor coolant pumps at Palo Verde Nuclear Generating Stations 1 and 2. Upon receipt of the problem resolution from CE (i.e., specific repair program) and considering available Supply System resources, a final report will be provided to your office.

lk$D 6

0 IF 27

~-4 "Should you have -any questions or : desire further information, please contact me directly.

f. Y m,

.] A. D. Kohler (760) II6 Bi Program Director, WNP-3 DRC/cae cc: Mr. J. A. Adams, NESCO .

Mr. E. M. Burton, Pacific Power & Light Company Ebasco, Elma Mr. R. D. Hill. Puget Sound Power & Light Company Mr. P. Inman, The Washington Water Power Company Mr. D. Smithpeter, BPA Mr. A. A. Tuzes, Combustion Engineering Mr. B. D. Withers, Portland General Electric Company Mr. M. K. Yates Ebasco, New York l

.