Part 21 Rept Re Deviation in Quality of Shielded Instrumentation Cables.Initially Reported on 820412.Problem Determined Not to Be Reportable Per Part 21
ML20072R015
Person / Time
Site: Satsop
Issue date: 03/25/1983
From: Littlehales G
ROCKBESTOS CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-83 NUDOCS 8304050412
Download: ML20072R015 (1)


Text

{{#Wiki_filter:.

  ~

TI-I E 170CK13Et-FI'OS CONIIMNY g

                          , 860 NORTH MAIN STREET EXTENSION, P.0, BOX 5778, WALLINGFORD, cT 06492 TE LE PHONE : (203) 265 G500 TWX: 710476-0050 TLX: 956042 March 25, 1983 Director - Region I Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Sir:

Our letter of April 12, 1982, (copy attached) described a deviation from procurement documents in certain instrumentation cable shipped to WPPSS Nuclear Project number 3, and advised of a possible future 10 CFR 21 report. The deviation concerned points of deformation in the insulation at which the wall thickness was reduced below the specified minimum thickness. We have determined that this deviation could not have created a substantial safety hazard under LOCA conditions after forty years of service. The purchaser, Ebasco Services, Inc. participated in this investigation and has approved our report of testing. We will therefore consider this matter closed. Very truly yours, THE ROCKBESTOS COMPANY i 0 $ c G. G. Littlehales ! Manager - Quality Assurance GGL/1mh l cc: E. S. Reed R. J. Gehm l E. J. D'Aquanno ( F. C. Schwelm A. H. Lybeck 2 ggf0 J i \ l 8304050412 830325

PDR ADOCK 05000508 S PDR l1 i ._s_.__

i i

                                                                                  ' t. C:7.HH AL
  • Coctified By k/Etf/ --

g TI-IE IROCKBESTOS COM PANY

                    **j 860 NORTH MAIN STREET EXTENSION, P.O. BOX 778, WALLINGFORD, CT 06492 wk               TELEPHONE: (203) 265-6500 TWX: 710-476-0050 .TLX: 956042 Aprilil2, 1982 Director - Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Sir:

The purpose of this letter is to advise you of a possible future 10 CFR 21 report regarding a quantity of two conductor shielded instrumentation cable shipped to WPPSS Nuclear Project 3 under Contract No. 3240-628. The cable in question contained points of deformation in the conductor insulation which caused wall thickness at these points to fall below the specification minimum. This deformation was caused by improper adjustment of printing equipment during application of identification printing to the overall cable jacket. The affected cable has been returned to Rockbestos, and our investigation is proceeding to determine whether the deviation could have created a sub-stantial safety hazard under LOCA conditions after 40 years of service. If the results of our investigation should indicate a reportable defect, we will proceed in accordance with the requirements of 10 CFR 21. " Very truly yours, THE ROCKBESTOS COMPANY Lyn /W .

                                                                'J / / LL CD/..<2e G. G. Littlehales Manager - Quality Assurance GGL:kt cc:   E. S. Reed R. J. Gehm E. J. D'Aquanno F. C. Schwelm A. H. Lybeck A OtVISION OF THE MARMON GAOUP, INC