ML20128K191

From kanterella
Jump to navigation Jump to search
Deficiency Rept D/N 52 Re LPSI Pump Failures.Pump Evaluation Necessary for Final Rept Not Yet Received.Final Rept to Be Provided as Soon as Info Received
ML20128K191
Person / Time
Site: Satsop
Issue date: 07/01/1985
From: Kohler A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
D-N-#52, GO3-85-364, NUDOCS 8507240062
Download: ML20128K191 (2)


Text

,

f kh 1 P.ECEIVED NRC Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 '(206)482 4428 g gp . 5 W G w REGICHVHW July 1, 1985 G03-85-364 Docket No. 50-508 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

NUCLEAR PROJECT N0. 3 POTENTIAL 10CFR50.55(e) DEFICIENCY LOW PRESSUoE SAFETY INJECTION PUMP FAILURES, D/N #52

Reference:

Letter (G03-84-402), A. D. Kohler to T. W. Bishop, same subject, dated June 22, 1984.

The referenced letter provided your office with an Interim Report of the subject deficiency and noted that a Final Report would be submitted upon receipt of information from Combustion Engineering (CE). At the time, it was anticipated that the Final Report. would be provided by. June 30, 1985. However, Ebasco has not received the Palo Verde' Nuclear Generating Station LPSI Pump Evaluation which is the basis for our Final Report.

N fDR Dock on S

t fIE'31

j'.lgV U. S. Nuclear Regulatory Commission, Region V Page Two-July 1, 1985

.G03-85-364 A final report will be prepared as soon as the required information is received from CE. Should you have any questions or desire further information, please contact me directly.

b.OCLf. . Kohler

/ Acting WNP-3 Program Director cc: -Mr. J. A. Adams, NESCO Mr. R. M. Boucher, Pacific Power & Light Company Mr. W. L. Bryan, Washington Water Power Company Mr. J. Crnich, Ebasco - Elma Ebasco, Elma l Mr.-J. R. Lewis, Bonnevile Power Administration Mr. R. V. Myers, Puget Sound Power & Light Mr. J. Porrovecchio - Ebasco, New York Mr. D. Smithpeter, BPA Mr. S. F. Swearngin, BPA Mr. A. A. Tuzes, Combustion Engineering Mr. L. D. Weislogel, Pacific Power & Light Company Mr. B. D. Withers, Portland General Electric Company l Mr. H. Worchel - Ebasco, New York l Document Control Desk - U. S. NRC l

l l

j l

l'

-- - - , - -