Issue date | Title | Topic | |
---|---|---|---|
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20140A966 | 29 May 1997 | Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum | Finite Element Analysis |
NSD-NRC-97-5093, Part 21 Rept Re W Identified Defects That Could Create Substantial Safety Hazard Should Defect Remain Uncorrected. Plans to Complete Proper Refurbishment of All of Returned Breakers Being Established | 14 May 1997 | Part 21 Rept Re W Identified Defects That Could Create Substantial Safety Hazard Should Defect Remain Uncorrected. Plans to Complete Proper Refurbishment of All of Returned Breakers Being Established | |
ML20137G626 | 25 March 1997 | Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber | Finite Element Analysis |
ML20135E381 | 3 March 1997 | Part 21 Rept Re Output Drift W/Increasing Temperature on Several RTD Amplifiers Noted During Installation of RTD by-pass Mod at Station.Action to Identify All Circuit Cards W/Affected Date Codes,Identified | |
ML20117G464 | 14 May 1996 | Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs | |
ML20097J635 | 30 January 1996 | Part 21 Rept Re Intermittent Failure of DG Relay Mfg by Amerace Electronic Components.Suspect Relays at Plants Identified & Replaced.Amerace Indicated That Operators & QC Personnel Made Aware of Need for Proper Soldering | |
ML20096E651 | 18 January 1996 | Part 21 Rept Re Failure of MOV Motor Pinion Gear Mfg by Limitorque at Byron Station.Replacement & Insp Activities Initiated for Potentially Impacted Populations of MOVs at Byron & Braidwood Stations | Time of Discovery |
ML20094R739 | 28 November 1995 | Potential Part 21 Rept Re Ksv EDG Sys Mfg by Cooper-Bessemer Reciprocating Products Div,Div of Cooper Cameron Corp. Recommends That All Utils Verify Open Oil Passage in Assembly | |
ML20077D343 | 29 November 1994 | Part 21 Rept Re Suspect Master Connecting Rods & Contains Info Location in Engine for Rods | |
ML20078G305 | 9 November 1994 | Rev to Part 21 Rept Re Potential Problem W/Master Power Connecting Rods.Vendor Recommends Listed Utils Perform Visual Insp of Master Rods to Determine Applicability of Rept | |
ML20071J189 | 22 July 1994 | Final Part 21 Rept Re Cracks Found in Body to Bonnet Nuts on Copes-Vulcan Airoperated Valves.Operability Evaluation for Byron Units 1 & 2,of Affected Valves W/Nuts of Heat Numbers H & I Completed on 940622 | Time of Discovery |
ML20073S954 | 27 June 1994 | Part 21 Rept Re Incorrect Matl Supply Discovered on Unshipped Order.Pump Div Will Notify Enertech W/ Recommendation That Items Supplied W/Incorrect Matl Be Removed & Destroyed | |
ML20070A144 | 22 June 1994 | Part 21 Rept Re Conditions Which Affect Hydraulic Valve Operators Supplied by Bw/Ip to Enertech Co & Listed Utils. Vendor Will Notify Enertech W/Recommendations That All Items Supplied W/Incorrect Matl Be Removed & Destroyed | |
ML20059L986 | 11 November 1993 | Part 21 Rept Re Deviation Wherein Fully Open Butterfly Valve Located 15 Pipe Diameters Upstream of Sensors Was Disturbing Flow Profile Enough to Cause Ultrasonic Meter to Indicate 3 to 4% Low.Customers Notified & Valve Removed | |
ML20127M520 | 24 November 1992 | Final Part 21 Rept Re Reject Lot Serial Numbers of Defective Fuel Nozzle Tips,Consisting of Corrected Page 6 of 921102 Rept Re Reject Lots for Fuel Injector Assembly | |
ML17223A745 | 26 January 1990 | Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N | |
ML20149H821 | 11 February 1988 | Final Deficiency Rept 457/87-01 Re Diesel Engine Generator Rocker Arm Failure.Initially Reported on 870217.Util Took Steps to Determine Strength of Rocker Arms.Low Strength Rocker Arms Replaced W/New Rocker Arms | |
ML20214H822 | 15 May 1987 | Interim Deficiency Rept Re Diesel Engine Generator Rocker Arm Failure.Initially Reported on 870217.Test/replacement Program Started,Contingent on Receipt of Replacement Exhaust Rocker Arms from Cooper-Bessemer | |
ML20206Q882 | 2 April 1987 | Interim Deficiency Rept Re Diesel Engine Generator Rocker Arm Failure.Initially Reported on 870217.Investigation Emcompasses Both Metallurgical Analysis & Mechanical Interactions.Next Rept Will Be Submitted by 870501 | |
ML20205B669 | 17 March 1987 | Deficiency Rept Re Diesel Engine Generator Rocker Arm Failure.Initially Reported on 870217.Diesel Generator Repaired by Honing Out Crosshead to Crosshead Guide Clearance to 0.006 Inches.Next Rept Submitted by 870430 | |
ML20211P721 | 23 February 1987 | Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly | |
ML20207P180 | 29 December 1986 | Final Deficiency Rept 86-02 Re Rejectable Indications During Preservice Insp on Loop 1 Steam Generator.Actions Necessary to Resolve Items Completed,Per Suppls 1 & 2 to NUREG-1002 | |
ML20212D972 | 23 December 1986 | Interim Deficiency Rept 84-14 Re Weld & Grindout Identified During Preservice Insp.Initially Reported on 841121.New Data Demonstrates That Indication Size Meets ASME Section XI 1WB-3512,1977 Edition.Indication Grindout No Longer Needed | |
ML20215F953 | 19 December 1986 | Part 21 Rept Re Design Error Uncovered in Certain Safety Shutdown Circuits for Standby Diesel Generator.Switches 12E0-1,12E0-2,33E0-1 & 33E0-2 Not Intended to Initiate Emergency Mode Trip as Drawings Indicate | |
ML20210N656 | 26 September 1986 | Final Deficiency Rept 85-06 Re Failure of Diesel Generators 1A & 1B to Sustain Adequate Prime During Testing.Initially Reported on 850822.Fuel Oil Sys Modified & Tested | |
ML20210F478 | 17 September 1986 | Final Part 21 & Deficiency Rept 86-06 Re Fastener Matl Supplied by Cardinal Industrial Products.Initially Reported on 860617.Fastener Matl Met ASME Code Requirements. Documentation of Corrective Actions Available Onsite | |
ML20203N193 | 16 September 1986 | Final Deficiency Repts 84-05 & 84-15 Re Inconsistencies in Documentation of Gk Newberg Structural Steel Installations & Welding Program,Respectively.Initially Reported on 840417. Installation Travelers Reviewed.Deficiencies Resolved | |
ML20214M318 | 4 September 1986 | Potential Part 21 Rept Re Contromatics Actuator W/Jackscrew/ Handwheel Emergency Override Operator.Jackscrew/Handwheel Should Be Used for Emergency Manual Operation Only.Encl Ltr Also Sent to Listed Utils/Ae Firms | |
ML20214P512 | 2 September 1986 | Final Deficiency Rept 83-08 Re Fabrication of Pullman Sheet Metal Duct Fittings W/O Approved Design Documentation. Initially Reported on 830630.Unit 1 Fitting Mods Completed on 860501.Reworking of 12 Fittings Remain for Unit 2 | |
ML20212K274 | 12 August 1986 | Final Deficiency Repts 84-05 & 84-11 Re Boeing Steam Generator Snubber Failure.Initially Reported on 840628. Snubber Functional Test Results Reviewed & Acceptable. Snubbers Refurbished for Listed Units | |
ML20205F721 | 12 August 1986 | Revised Final Deficiency Rept 84-12 Re Removal of Name Plates from ASME Large Bore Spool Pieces.Initially Reported on 840824.Replacement Identification Plate Not Attached to Installed Spool Pieces.Procedure Revised to Reflect Change | |
ML20212B379 | 29 July 1986 | Interim Deficiency Rept 86-06 Re Fastener Matl Supplied by Cardinal Industrial Products.Initially Reported on 860617. Matls Over 1 Inch in Diameter Shipped During 840109-850815 & Not Included in Notification Ltrs Acceptable | |
ML20206B137 | 11 June 1986 | Final Deficiency Rept 84-04 Re out-of-tolerance Radiographic Film Densities.Initially Reported on 840406. Unit 1 Production Welds Repaired &/Or Reradiographed & Welder Qualifications Evaluated & Confirmed | |
ML20211F197 | 5 June 1986 | Final Deficiency Repts 86-03 by & 86-05 Bw Re Cold Leg Safety Injection Pipe Vibration & Cracks.Initially Reported on 860430.D Loops Changed to 5-D Bends & Support Added for Addl Stiffness | |
ML20211E347 | 4 June 1986 | Final Deficiency Repts 84-06(BY) & 84-14(BW) Re Large Laminar Indication in Steam Generator Snubber Piston Rod End Blade.Initially Reported on 840731.Rod End & Six End Caps Replaced | |
ML20198E898 | 20 May 1986 | Final Deficiency Repts 86-01 & 86-03 Re Defective Spot Welds on Cable Tray Hanger Strut Matl.Initially Reported on 860306.Engineering Evaluation Performed for Hangers Remaining W/Suspect Control Numbers | |
ML20210L044 | 22 April 1986 | Final Deficiency Repts 86-02 for Byron & 86-04 for Braidwood Re Failures of Diesel engine-generator Rocker Arm.Initially Reported on 860327 by Util & 860311 by Cooper Industries Under Part 21 | |
ML20210E080 | 18 March 1986 | Final Deficiency Rept 84-17 Re Concrete Expansion Anchor Installations.Sargent & Lundy Evaluation Complete.No Significant Design Discrepancies Noted.Util Nonconformance Repts 658 & 659 Closed | |
ML20137Z500 | 6 March 1986 | Interim Deficiency Rept 86-03 Re Defective Spot Welds on Cable Tray Hanger Strut Matl.Initially Reported on 860121. Unit 2 Containment Hangers Will Be Replaced & Unit 1 Hangers Will Be Repaired or Replaced | |
ML20153F369 | 11 February 1986 | Interim Deficiency Rept 86-02 Re Rejectable Indications in Weld Seams of Loop 1 Steam Generator & Pressurizer.Initially Reported on 860115.Fracture Mechanics Analysis Performed. Final Rept Will Be Submitted Upon Resolution of Issue | |
ML20153F581 | 11 February 1986 | Final Deficiency Rept 86-01 Re Misorientation of Burnable Poison Rods A6P2D in Westinghouse Fuel Assembly C54S. Initially Reported on 860114.Assembly A6P2D Returned to Mfg for Repair.Vendor Will Change Mfg & Insp Practices | |
TXX-4692, Final Deficiency Rept CP-86-03 Re Sealing Techniques Used in Installation of Class 1E Instruments.Initially Reported on 860110.Seal Assemblies Provided for Class 1E Devices W/ Exception of Svc Water Intake Areas | 7 February 1986 | Final Deficiency Rept CP-86-03 Re Sealing Techniques Used in Installation of Class 1E Instruments.Initially Reported on 860110.Seal Assemblies Provided for Class 1E Devices W/ Exception of Svc Water Intake Areas | |
ML20137R772 | 29 January 1986 | Final Deficiency Rept 84-16 Re Adequacy of ASME Matl Procurement Documentation.Initially Reported on 841002. Review of Documentation for Approx 4,300 Heat/Lot Numbers Re Site Procured ASME Matls Complete | |
ML20151Y392 | 29 January 1986 | Final Deficiency Rept 85-02 Re Tank & HX Welding.Initially Reported on 850221.Util Evaluating Westinghouse Response to Insp Results.Other vendor-supplied Items Submitted to Sargent & Lundy for Evaluation | |
ML20137N529 | 21 January 1986 | Final Deficiency Rept 85-03 Re Defects Identified During Instrumentation Installation Reverification Program. Safety-related ASME Section III & Class H Instrument Installations Made Prior to Feb 1984 Reinspected | |
ML20137G742 | 13 January 1986 | Final Deficiency Rept 82-07 Re Adequacy of safety-related Mechanical Equipment Installed Prior to Sept 1982.Encl Rept Documents Results of Completed Retrofit Program.Issue Closed | |
ML20137H724 | 7 January 1986 | Final Part 21 & Deficiency Rept 84-10 Re Wall Thickness Inadequacies for Small Bore ASME Class Ii,Iii & Class H Piping.Initially Reported on 840720.Util & Sargent & Lundy Program Verified Acceptability of safety-related Piping Sys | |
ML20136G515 | 12 November 1985 | Final Deficiency Rept 83-07 Re Matl Traceability Verification Program. Matl Traceability Verification at Braidwood, Encl | Non-Destructive Examination Hydrostatic Nondestructive Examination Scaffolding |
ML20210A109 | 4 November 1985 | Interim Deficiency Rept 84-16 Re Adequacy of ASME Matl Procurement Documentation.Approx 337 Heat/Lot Numbers Needing Addl Documentation or Corrective Action to Conform W/Asme Code Resolved.Final Rept Expected in Jan 1986 |