Final Part 21 & Deficiency Rept 86-06 Re Fastener Matl Supplied by Cardinal Industrial Products.Initially Reported on 860617.Fastener Matl Met ASME Code Requirements. Documentation of Corrective Actions Available Onsite
ML20210F478
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/17/1986
From: Miosi A
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-86-323-000 2120K, 86-06, 86-6, PT21-86-323, PT21-86-323-000, NUDOCS 8609250229
Download: ML20210F478 (2)


Text

-- -

~,

y Commonwrith Edison 72 West Adams Street, Chicago, Illinois U

Address Reply to: Post Office Box 767 Chicago, Illinois 60690 - 0767 September 17, 1986 Mr. James G. Keppler Regional Administrator

)()(

Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 i 10 CFR 50.55(e) No. 86-06 Final Report

~

Fastener Material Supplied by Cardinal Industrial Products NRC Docket Nos. 50-456 and 50-457

References:

(a) A.D. Miosi letter to J.G. Keppler dated July 29, 1986 i

Dear Mr. Keppler:

On June 17, 1986, Commonwealth Edison Company notified Mr.

P. Pelke of your office of a deficiency reportable pursuant to 10 CFR 50.55(e) relative to fastener material supplied by Cardinal Industrial Products. This deficiency was assigned number 86-06 for Braidwood Units 1 and 2 for your tracking purposes. The purpose of this letter is to inform you that all identified corrective actions are now complete and this is considered to be a final report.

Description of Deficiency Notifications relative to fastener materials supplied by Cardinal Industrial Products have indicated that these shipped loose fastener materials, which have been supplied to Commonwealth Edison Company either may not comply with the purchase order requirements or have unresolved technical questions.

Analysis of Safety Implications As designated by the corrective action, the fastener l materials which were identified on the notifications were either l evaluated and found to meet ASME code requirements, removed from stock, or replaced. If the items that were removed or replaced were found deficient and had gone undetected, the use of such items could have affected safety-related systems or their functions.

8609250229 860717 p11 t o PDR ADOCK 05000456 S pop SEP N

Corrective Action Taken Reference (a) provided a summary of the corrective actions necessary to resolve the identified deficiencies. The corrective actions are complete and documented details of these are included in Nonconformance Report No. 679, Revision 1. This report is available on site for NRC review.

Please address any questions that you may have concerning this matter to this office.

Very truly yours, a; MW A.D. Miosi Nuclear-Licensing Administrator ADM/pav Enclosure cc: NRC Resident Inspector - Braidwood 2120K