Final Deficiency Rept 84-04 Re out-of-tolerance Radiographic Film Densities.Initially Reported on 840406. Unit 1 Production Welds Repaired &/Or Reradiographed & Welder Qualifications Evaluated & Confirmed
ML20206B137
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/11/1986
From: Miosi A
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1765K, 84-04, 84-4, NUDOCS 8606190013
Download: ML20206B137 (2)


Text

__ -. __ - _ _ . _ _ __

_ Commonwealth Edison

\ Z 72 West Adams Street, Chicreo,lilinois V Address Reply to: Post Offica Box 767 Chicago, Illinois 60690-0767 June 11, 1986 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-04 Final Report Radiograph Film Density r i NRC Docket Nos. 50-456 and 50-457

References:

(a) E.D. Swartz letter to J.G. Keppler dated April 6, 1984 a

(b) E.D. Swartz letter to J.G. Keppler j dated August 16, 1984 l (c) D.H. Smith letter to J.G. Keppler j dated December 21, 1984
(d) D.H. Smith letter to J.G. Keppler
dated March 21, 1985 (e) A.D. Miosi letter to J.G. Keppler
dated November 1, 1985

Dear Mr. Keppler:

The above references provided information concerning a deficiency reportable pursuant to 10 CFR 50.55(e) regarding out of tolerance radiograpnic film densities at our Braidwood Station. The purpose of this letter is to inform you that the Unit 1 corrective actions identified to resolve this issue are now complete. Those l corrective actions remaining to resolve the Unit 2 related items are being tracked by CECO NCR 788. This letter is considered to be a final report. v i In our last submittal we identified three corrective actions remaining to be completed; resolution of 32 production welds, close out of Phillips Getschow NCRs, and evaluation / resolution of Power Systems Inc. (PSI) welder qualifications. Of the 32 production welds, 13 affecting Unit 1 were repaired and/or re-radiographed as necessary, and the associated.Phillips Getschow NCR's #5207, #5208, and #5209 have been

, closed. The qualifications of 84 PSI welders were evaluated in i i accordance'with the disposition provided in CECO NCR 609 Rev. 2. I l The results of this evaluation confirm the ability of the subject i i welders to' perform sound welds. These steps finalize corrective I i actions for Unit 1.

i l 8606190013 860611 . A

$DR ADOCK 05000456 ' b )0 PDR qg  ;-

- .---- -.- .. - -- - _ - . . . - . .-- +

Subsequent to the issuance of Reference (e), NCR 609 Rev. 1 was divided into two separate CECO NCRs: 609 Rev. 2 for Unit 1 and 788 for Unit 2. This was to facilitate resolution of the issue. As indicated above NCR 609 Rev. 2 is now complete. NCR 788 for Unit 2 will be complete following access and inspection of 19 containment spray welds. Resolution of NCR 788 will complete the corrective actions for Unit 2.

Please address any questions that you or your staff may have concerning this matter to this office.

Very truly yours,

((f L A.D.0Miosi Nuclear Licensing Administrator ADM/pav Enclosure cc: NRC Resident Inspector - Braidwood 1765K