.[O~N Commonwe:lth Edison
) One Fast National Plaza. Chicago, lit;nois C "7 Address Reply to: Post Office Box 767 gj Chicago, Illinois 60690 March 18, 1986 Mr.' James G. Keppler Regional Administrator U.S. Nuclear. Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Il 60137
SUBJECT:
Braidwood Station Units 1 and 2
.10 CFR 50.55(e) No. 84-17 Final Report Concrete Expansion Anchor Inspection Deficiencies NRC Docket Nos. 50-456/457
REFERENCE:
(a)
D.H. Smith letter to J.G. Keppler dated November 9, 1984 (b)
D.H. Smith letter to J.G. Keppler dated February 4, 1985 (c)
A.D. Miosi letter to J.G. Keppler dated May 7, 1985 (d)
A.D. Miosi letter to J.G. Keppler dated September 19, 1985
Dear Mr. Keppler:
The above references provided information concerning a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding existing concrete expansion anchor (CEA) installations. The purpose of this letter is to inform you the corrective actions identified by Commonwealth Edison to address this issue are now complete. This is considered to be a final report.
As discussed in Reference (d), Sargent & Lundy (S&L) had requested the site contractors to clarify information relative to their inspection results.
These clarifications were necessary in order for S&L to complete their evaluation of the inspection results.
S&L's ovaluation is now complete and no design significant discrepancies were identified. Commonwealth Edison Company Nonconformance Reports Number 658 (Unit 1) and 659 (Unit 2), which tracked the resolution of this issue, are now closed. All documentation is available for your inspection.
Please address any questions regarding this item to this office.
Very truly yours, A.D. Miosi Nuclear Licensing Administrator cc: NRC Resident Inspector - Braidwood Director of Inspection & Enforcement US Nuclear Regulatory Commission Washington DC 20555 1442K m 20 M 35c2 }
\\
-