Interim Deficiency Rept 84-16 Re Adequacy of ASME Matl Procurement Documentation.Approx 337 Heat/Lot Numbers Needing Addl Documentation or Corrective Action to Conform W/Asme Code Resolved.Final Rept Expected in Jan 1986
ML20210A109
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/04/1985
From: Miosi A
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0852K, 84-16, 852K, NUDOCS 8511140219
Download: ML20210A109 (2)


Text

s

- 9 J :.m .(fmr) o.,,,,,,,,,,,.a.,,, o.a.,,

one Fir t Nahonal Pt 2% Chicago. Hlinois

[

-\ ~!^ D Address Reply to: Post Office Box 767 w -N / Chicago, Illinois 60690 November 4, 1985 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III4 799 Roosevelt Road Glen Ellyn, IL 60137

SUBJECT:

Braidwood Station Units 1 ano 2 10 CFR 50.'55(e)'No. 84-16 Interim Report ASME Material Procurement Documentation NRC Docket Nos.-50-456/457 References (a): D. H. Smith lettcr to J. G. Keppler dated October 2, 1984.

-(b): D. H. Smith letter to J. G. Keppler dated November 28, 1985.

(c):- D. H. Smith letter to J. G. Keppler

~

dated February 8, 1985.

(d): D. H. Smith letter to J. G. Keppler dated April 12, 1985.

(e): A..D. Miosi letter to J. G. Keppler dated August 2, 1985.

Dear Mr. Keppler:

The above references provided information concerning a

- potential" deficiency reportable pursuant to 10 CFR SU.55(e)

- regarding the adequacy of ASME Material procurement Documentation at our Braidwood Station. The purpose of this letter is to provide an updated status of the corrective actions taken to resolve this issue. This letter is considered to be a Interim Report.

As previously reported, of the estimated total 4300 heat / lot numbers, an estimated 2200 required additional documentation from the manufacturer / supplier or corrective action to associated records. At this time 95% of these 2200 heat / numbers

'have been resolved. An estimated 377 of the total heat / Jot numbers require some additional corrective action to bring the documentation into conformance with ASME'Section III requirements. This additional ' corrective action has been completed for approximately-three quarters of the documentation. Commonwealth Edison Company is

$1140219851104 i A

S 05000456

'NOV 5198b-

7:

. presently. working on the remaining documentation in order to complete the corrective action. It.is estimated the entire review effort is approximately 98% complete.

.It is anticipated that a final report will be submitted in January, 1986 indicating the results of the corrective action.

Please address ar questions that you or your staff may have concerning this matter to this office.

Very truly yours, Ody Mu A. D. Miosi Nuclear Licensing Administrator

./klj cc: NRC Resident Inspector - Braidwood Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 0852K

,