Reactor Water Recirculation
From kanterella
Jump to navigation
Jump to search
Reactor Water Recirculation
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Electrohydraulic Control
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
JAFP-25-0046, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation
FitzPatrick
5 September 2025
License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation
IR 05000333/2025002
FitzPatrick
7 August 2025
Integrated Inspection Report 05000333/2025002
NUREG-1307, Rev. 20, Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities Final Report
28 February 2025
NUREG-1307, Rev. 20, Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities Final Report
IR 05000333/2024004
FitzPatrick
11 February 2025
Integrated Inspection Report 05000333/2024004
JAFP-24-0053, License Amendment Request to Eliminate Remaining Main Steam Line Radiation Monitor Initiated Isolation Functions
FitzPatrick
26 November 2024
License Amendment Request to Eliminate Remaining Main Steam Line Radiation Monitor Initiated Isolation Functions
ML24319A080
Fermi
07200071
8 November 2024
5 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
IR 05000333/2024002
FitzPatrick
7 August 2024
Integrated Inspection Report 05000333/2024002
IR 05000333/2023004
FitzPatrick
7 February 2024
Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001
JAFP-23-0064, Emergency Plan Document Revision
FitzPatrick
15 November 2023
Emergency Plan Document Revision
IR 05000333/2023003
FitzPatrick
13 November 2023
Integrated Inspection Report 05000333/2023003
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties