RNP-RA/02-0153, September 2002 Monthly Operating Report for Robinson Unit 2

From kanterella
Jump to navigation Jump to search
September 2002 Monthly Operating Report for Robinson Unit 2
ML022820061
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/07/2002
From: Baucom C
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/02-0153, TRM 6.2, TS 5.6.4
Download: ML022820061 (3)


Text

TS 5.6.4 TRM 6.2 C"" CP&L N A Progress Energy Company Serial: RNP-RA/02-0153 OCT 0 7 2002 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specification (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Carolina Power and Light (CP&L) Company submits the enclosed report of operating statistics and shutdown experience for the month of September 2002.

Sincerely,

  • ýd )&6uý C. T. Baucom Supervisor - Licensing/Regulatory Programs DJS/djs Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II R. Subbaratnam, NRC, NRR 7C2/

Robinson Nuclear Plant 3581 West Entrance Road Hartsville. SC 29550

Attachment to Serial: RNP-RA/02-0153 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 10/01/02 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: SEPTEMBER 2002

1. DESIGN ELECTRICAL RATING (NET MWE): 700.0
2. MAX DEPENDABLE CAPACITY (NET MWE): 683.0 THIS YR TO CUMULATIVE MONTH DATE
3. NUMBER OF HOURS REACTOR CRITICAL 720.00 6551.00 210358.59
4. HOURS GENERATOR ON LINE 720.00 6551.00 207069.26
5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 505457.00 4609051.00 134940400.00

Attachment to Serial: RNP-RA/02-O153 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 10/01/02 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: SEPTEMBER 2002 No. Date Type Duration Reason1 Method of Shutting Down Cause I Corrective Actions / Comments F. Forced (Hours) the Reactor or Reducing 2

S Scheduled Power N/A N/A None N/A N/A N/A I 2 Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5- Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at full power the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month. There were no steam generator inspections during the month.