RNP-RA/02-0035, February 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2
ML020730069
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/11/2002
From: Fletcher B
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/02-0035
Download: ML020730069 (5)


Text

TS 5.6.4 TRM 6.2 4 CP&L Serial: RNP-RA/02-0035 MAR 1 1 200Z United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specification (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Carolina Power & Light (CP&L) Company submits the enclosed report of operating statistics and shutdown experience for the month of February 2002. In accordance with TS Section 5.6.4, this report is being submitted to the NRC by the 15th day of the month following the calendar month covered by the report.

If you have any questions concerning this matter, please contact Mr. C. T. Baucom.

Sincerely, B. L. Fletcher III Manager - Regulatory Affairs DJS/djs Attachments I. Plant Performance Data System Appendix C - Operating Data Report II. Appendix B - Average Daily Power Level III. Appendix D - Unit Shutdowns and Power Reductions c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II A. G. Hansen, NRC, NRR Robinson Nuclear Plant 3581 W. Entrance Road Hartsvillie, SC 29550

Attachment I to Serial: RNP-RA/02-0035 PLANT PERFORMANCE DATA SYSTEM PAGE 1 of 1 APPENDIX C - OPERATING DATA REPORT RPD36-O00 DOCKET NO. 050-0261 UNIT CP&L CO. HBRSEP, UNIT NO. 2 RUN DATE 3/04/02 RUN TIME 8:01:45 COMPLETED BY TOM FREEMAN OPERATING STATUS TELEPHONE (843) 857-1403 UNIT NAME: H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), NOTES:

UNIT NO. 2

2. REPORTING PERIOD: FEBRUARY 2002
3. LICENSED THERMAL POWER (MWT): 2300
4. NAMEPLATE RATING (GROSS MWE): 739.0
5. DESIGN ELECTRICAL RATING (NET MWE): 700.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 683.0
8. IF CHANGES OCCUR IN CAPACITY RATING (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None
10. REASONS FOR RESTRICTION, IF ANY:

THIS YR TO CUMULATIVE MONTH DATE

11. HOURS IN REPORTING PERIOD 672.00 1416.00 271752.00
12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 205223.59
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 3314.65
14. HOURS GENERATOR ON LINE 672.00 1416.00 201934.26
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
16. GROSS THERMAL ENERGY GEN. (MWH) 1544451.84 3208141.20 426137657.52
17. GROSS ELEC. ENERGY GEN. (MWH) 512549.00 1062908.00 138660216.00
18. NET ELEC. ENERGY GENERATED (MWH) 489299.00 1014219.00 131345568.00
19. UNIT SERVICE FACTOR 100.00 100.00 74.31
20. UNIT AVAILABILITY FACTOR 100.00 100.00 74.32
21. UNIT CAP. FACTOR (USING MDC NET) 106.61 104.87 71.98
22. UNIT CAP. FACTOR (USING DER NET) 104.02 102.32 69.05
23. UNIT FORCED OUTAGE RATE .00 .00 11.49
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Attachment II to Serial: RNP-RA/02-0035 Page 1 of 1 APPENDIX B - AVERAGE DAILY POWER LEVE L RPD39-000 DOCKET NO. 050-0261 UNIT CP&L CO, HBRSEP, UNIT NO. 2 RUN DATE 3/04/02 RUN TIME 08:01:45 COMPLETED BY THOMAS FREEMAN TELEPHONE (843) 857-1403 FEBRUARY 2002 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 729* 17 729*

2 727* 18 728*

3 728* 19 729

  • 4 728* 20 729*

5 730* 21 729*

730* 22 727

  • 6 730* 23 727*

7 8 730* 24 728*

9 729* 25 728*

10 729* 26 728*

11 727

  • 27 728*

12 728* 28 729*

13 728*

14 728*

15 728*

16 722*

  • The maximum dependable net capacity is 683 MWE. The Plant operated above the maximum dependable capacity due to the condenser water inlet temperature <950F.

Attachment III to Serial: RNP-RA/02-0035 Page I of 1 APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 3/06/02 REPORT MONTH: FEBRUARY 2002 COMPLETED BY THOMAS FREEMAN TELEPHONE (843) 857-1403 1 Corrective Actions /

No. Date Type Duration Reason Method of Shutting Down F: Forced (Hours) the Reactor or Reducing Comments 2

S: Scheduled Power 2

Reason: Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at full power the entire month. There were no challenges to the pressurizer power operated relief valves or the pressurizer safety valves during the month. There were no steam generator inspections during the month.

Outgoing Regulatory Affairs Correspondence "Blind Copy" Distribution 1 2- 3 4 5 6 7 8 19 110 Location Name Robinson Nuclear Plant "X X X X X X X X X X Vice President - RNP J.W. Moyer "X X X X X X X X X X DSO T.D. Walt "X X X X X X X X X X Plant Manager T.P. Cleary "X X X X X X X X X X Mgr. Regulatory Affairs J. L. Fletcher X Training Manager S. P. Weise X Training Records P. Brice (w/attachments)

X RESS/Mech T. Freeman "X X X X X X X X Nuclear Assessment Section J. D. Henderson "X X X X X X Nuclear Assessment Section S. Flowers X Emergency Preparedness R. L. Howell X D. Stoddard X E. Martin X X X X X X X X X Docket File - Licensing Licensing Administrator X Personnel Records T. Hodges (w/attachments)

X X X X X X X X X X Records Management Vault (log & send electronic transmittal)

Harris Nuclear Plant 1 2 3 4 5 6 7 8 9 10 Location Name X X X X X X X X X X Supervisor - John Caves (SHNPP 01)

Licensing/Regulatory Programs X X OE Coordinator Kennie Ellis (SHNPP 01)

Brunswick Nuclear Plant 1 2 3 4 1 5 1 6 7 8 9 10 Location Name X X X X X X X X X X Mgr. Regulatory Affairs Dave Dicello (BNP 04)

X X 0 E Coordinator B. Poulk (BNP 04)

One Hannover Square 1 2 3 4 5 6 7 8 9 10 Location Name X X X X X X X X X X Operations and Environmental Support Mike Engelman (OHS 9B5)

- Dept. Mgr.

X X X X X Mgr. Nuclear Performance Analysis Mg. Business Operations (OHS 9)

Progess Energy Building 1 2 3 4 5 6 7 8 9 10 Location Name "X X X X X X X Executive Vice President W. S. Orser (PEB 1223)

"X X X X X X X Senior Vice President &

Chief Nuclear Officer C. S. (Scotty) Hinnant (PEB 1223)

X X X X V.P. NED Jo Donahue (PEB 6)

"X X X X X X X X X X Manager, PE & RAS T.C. Morton (PEB 7)

X Mgr. Nuclear Fuels D. C. Poteralski (PEB 6)

X OE Coordinator James Niedermyer (PEB 7)

"X X X X X X X X X PE & RAS Docket File Robert G. Hill (PEB 7) 1 2 3 4 5 6 7 8 9 10 Location Name "X X X X X X X X NSRC Consultant Mr. Darrell Eisenhut Eisenhut@erols.com "X X X X X X X X NSRC/NSOC Consultant Mr. K. N. Harris (HARD COPY)

"X X X X X X X X NSOC Consultant Mr. J. M. Taylor Jmt4l05@aol.com "X X X X X X X X NSOC Consultant Mr. G. Davis daviscoint@aol.com X X Utility Data Institute 1200 G. St., N.W.

Attn: Barbara Lewis Suite 1100 Washington, DC 20005 blewis @meh.com "X X X X X X X X The Honorable J. A. Sanford Chair- North Carolina Utilities Comm, Post Office Box 29510 Raleigh, NC 27626-0510 (HARD COPY)

X X X X J. H. O'Neill, Esq. (HARD COPY)

X _ ____ X _ 1 1_1_INPO Records Center INPO (HARD COPY)

If you are on distribution for a document type you no longer wish to receive, please notify Licensing/Regulatory Programs at (843) 857-1395.

NRC Inspection Report Violation Responses NRC Annual Tech Spec. & 10 CFR Required Reports (Personnel Monitoring, Primary Coolant & Spiking, Radiological Environmental NRC Monthly Operations Reports

4. EP Plan & Procedures Revisions (S) NRC Semi-Annual Effluent & Waste Disposal Reports Licensee Event Reports/Security Event Reports/Special Reports NRC Bulletin/Generic Letter Responses/General Correspondence
8. Nuclear Assessment Department Assessment Responses
9. Industrial Security Plan Revision
10. CFR 55 & 10 CFR 50,74 Correspondence V:\Regulatory Affairs\licrp\Administrative\Regulatory Affairs Distribution Lists.doc Rev. 4 - February 15, 2002