RNP-RA/03-0021, January 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2
ML030440050
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/10/2003
From: Baucom C
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/03-0021
Download: ML030440050 (3)


Text

TS 5.6.4 TRM 6.2

ý Progress Energy Serial: RNP-RA/03-0021 FEB 1-02 003 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with the H. B. Robinson Steam Electric Plant (HIBRSEP), Unit No. 2, Technical Specifications (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Carolina Power

& Light Company submits the attached report of operating statistics and shutdown experience for the month of January 2003.

If you have any questions concerning this matter, please contact me.

Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs JMG/jmg Attachment c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II C. Patel, NRC, NRR Progress Energy Carolinas, Inc 3581 West Entrance Road Hartsville, SC 29550 *L9f

Attachment to Serial: RNP-RA/03-0021 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 02/06/03 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: JANUARY 2003

1. DESIGN ELECTRICAL RATING (NET MWE): 765
2. MAX DEPENDABLE CAPACITY (NET MWE): 710 THIS YR TO MONTH DATE CUMMIJLATIVE
3. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 212542.19
4. HOURS GENERATOR ON LINE 744 00 744.00 209222.26
5. UNIT RESERVE SHUTDOWN HOURS 000 0.00 23.20
6. NET ELEC. ENERGY GENERATED (MWH) 558647.00 558647.00 136496105.00

Attachment to Serial: RNP-RAI03-0021 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 02/06/03 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: JANUARY 2003 No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Conmnents 2

F Forced (Hours) the Reactor or Reducing Power S Scheduled 2

Reason Method:

A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restnction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

The unit operated at full power for the entire month. There were no challenges to the pressurizer safety valves during the month.