MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:License-Monthly Operating Report
MONTHYEARRNP-RA/05-0035, March 2005 Monthly Operating Reports for H. B. Robinson Steam Electric Plant (Hbrsep), Unit No. 22005-04-11011 April 2005 March 2005 Monthly Operating Reports for H. B. Robinson Steam Electric Plant (Hbrsep), Unit No. 2 RNP-RA/05-0025, February 2005 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 22005-03-10010 March 2005 February 2005 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2 RNP-RA/05-0002, December 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 22005-01-0707 January 2005 December 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2 RNP-RA/04-0149, November 2004 Monthly Operating Report for the H. B. Robinson, Unit 22004-12-0707 December 2004 November 2004 Monthly Operating Report for the H. B. Robinson, Unit 2 RNP-RA/04-0132, September 2004 Monthly Operating Report for H.B. Robinson, Unit 22004-10-11011 October 2004 September 2004 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/04-0117, August 2004 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 22004-09-0303 September 2004 August 2004 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 2 RNP-RA/04-0103, July 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 22004-08-0404 August 2004 July 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 2 RNP-RA/04-0087, June 2004 Monthly Operating Report for H. B. Robinson, Unit 22004-07-0808 July 2004 June 2004 Monthly Operating Report for H. B. Robinson, Unit 2 RNP-RA/04-0052, April 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 22004-05-11011 May 2004 April 2004 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit No. 2 RNP-RA/04-0041, March 2004 Monthly Operating Report for H.B. Robinson, Unit 22004-04-0505 April 2004 March 2004 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/04-0030, February 2004 Monthly Operating Report for H.B. Robinson, Unit 22004-03-0505 March 2004 February 2004 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/04-0020, January 2004 Monthly Operating Report for H.B. Robinson, Unit 22004-02-0505 February 2004 January 2004 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/04-0004, December 2003 Monthly Operating Report for H.B. Robinson, Unit 22004-01-0606 January 2004 December 2003 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/03-0155, November 2003 Monthly Operating Report for H.B. Robinson, Unit 22003-12-0909 December 2003 November 2003 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/03-0140, October 2003 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 22003-11-0606 November 2003 October 2003 Monthly Operating Report for H B Robinson Steam Electric Plant Unit 2 RNP-RA/03-0132, September 2003 Monthly Operating Report for H. B. Robinson, Unit 22003-10-10010 October 2003 September 2003 Monthly Operating Report for H. B. Robinson, Unit 2 RNP-RA/03-0115, August 2003 Monthly Operating Report for H. B. Robinson, Unit 22003-09-0909 September 2003 August 2003 Monthly Operating Report for H. B. Robinson, Unit 2 RNP-RA/03-0105, July 2003 Monthly Operating Report for H.B. Robinson, Unit 22003-08-12012 August 2003 July 2003 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/03-0085, June 2003 Monthly Operating Report for H. B. Robinson, Unit 22003-07-10010 July 2003 June 2003 Monthly Operating Report for H. B. Robinson, Unit 2 RNP-RA/03-0079, May 2003 Monthly Operating Report for H.B. Robinson, Unit 22003-06-10010 June 2003 May 2003 Monthly Operating Report for H.B. Robinson, Unit 2 RNP-RA/03-0062, April 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No.22003-05-0606 May 2003 April 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No.2 RNP-RA/03-0042, March 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 22003-04-0404 April 2003 March 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2 RNP-RA/03-0033, February 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 22003-03-0707 March 2003 February 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 RNP-RA/03-0021, January 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 22003-02-10010 February 2003 January 2003 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit No. 2 RNP-RA/03-0004, December 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 22003-01-10010 January 2003 December 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 RNP-RA/02-0185, November 2002 Monthly Operating Report for H. B. Robinson, Unit 22002-12-13013 December 2002 November 2002 Monthly Operating Report for H. B. Robinson, Unit 2 RNP-RA/02-0174, October 2002 Monthly Operating Report for H B Robinson Unit 22002-11-14014 November 2002 October 2002 Monthly Operating Report for H B Robinson Unit 2 RNP-RA/02-0153, September 2002 Monthly Operating Report for Robinson Unit 22002-10-0707 October 2002 September 2002 Monthly Operating Report for Robinson Unit 2 RNP-RA/02-0142, August 2002 Monthly Operating Report for H. B. Robinson Unit 22002-09-12012 September 2002 August 2002 Monthly Operating Report for H. B. Robinson Unit 2 RNP-RA/02-0119, July 2002 Monthly Operating Report for H. B. Robinson Unit 22002-08-13013 August 2002 July 2002 Monthly Operating Report for H. B. Robinson Unit 2 RNP-RA/02-0102, June 2002 Monthly Operating Report for H.B. Robinson Steam Electric Co., Unit 22002-07-10010 July 2002 June 2002 Monthly Operating Report for H.B. Robinson Steam Electric Co., Unit 2 RNP-RA/02-0088, May 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 22002-06-0505 June 2002 May 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 RNP-RA/02-0075, April 2002 Monthly Operating Report for H. B. Robinson Unit 22002-05-14014 May 2002 April 2002 Monthly Operating Report for H. B. Robinson Unit 2 RNP-RA/02-0050, March 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 22002-04-11011 April 2002 March 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 RNP-RA/02-0035, February 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 22002-03-11011 March 2002 February 2002 Monthly Operating Report for H.B. Robinson Steam Electric Plant, Unit 2 RNP-RA/02-0019, January 2002 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 22002-02-12012 February 2002 January 2002 Monthly Operating Report for H. B. Robinson Steam Electric Plant, Unit 2 RNP-RA/02-0001, December 2001 Monthly Operating Report for H. B. Robinson, Unit 22002-01-0707 January 2002 December 2001 Monthly Operating Report for H. B. Robinson, Unit 2 2005-04-11
[Table view] |
Text
TS 5.6.4 TRM 6.2 CP&L AProgres Energy Corrpany TS 5.6.8 Serial: RNP-RA/02-0174 NOV 1 4 2002 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 MONTHLY OPERATING REPORT Ladies and Gentlemen:
In accordance with the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications (TS) Section 5.6.4, "Monthly Operating Reports," and HBRSEP, Unit No. 2, Technical Requirements Manual (TRM) Section 6.2, "Monthly Operating Report," Carolina Power & Light Company submits the enclosed report of operating statistics and shutdown experience for the month of October 2002.
Attachment I provides the Monthly Operating Report in accordance with TS Section 5.6.4 and TRM 6.2. Attachment I[ provides the Steam Generator Tube Inspection Report information required by TS Section 5.6.8.b.
If you have any questions concerning this matter, please contact me.
Sincerely, C. T. Baucom Supervisor - Licensing/Regulatory Programs Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/02-0174 Page 2 of 2 CAC/cac Attachments I. Monthly Operating Report II. Steam Generator Tube Inspection Report c: NRC Resident Inspector, HBRSEP L. A. Reyes, NRC, Region II R. Subbaratnam, NRC, NRR
Attachment I to Serial: RNP-RAI02-0174 Page 1 of 2 MONTHLY OPERATING REPORT DOCKET NO. 050-0261 UNIT H. B. ROBINSON STEAM ELECTRIC PLANT (HBRSEP), UNIT NO. 2 DATE 11/01/02 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: OCTOBER 2002
- 1. DESIGN ELECTRICAL RATING (NET MWE): 700.0
- 2. MAX DEPENDABLE CAPACITY (NET MWE): 683.0 THIS YR TO CUMULATIVE MONTH DATE
- 3. NUMBER OF HOURS REACTOR CRITICAL 264.00 6815.00 210622.59
- 4. HOURS GENERATOR ON LINE 264.00 6815.00 207333.26
- 5. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 23.20
- 6. NET ELEC. ENERGY GENERATED (MWH) 174514.00 4783565.00 135114914.00
Attachment I to Serial: RNP-RA/02-0174 Page 2 of 2 DOCKET NO. 050-0261 UNIT NAME HBRSEP, UNIT NO. 2 DATE 11/01/02 COMPLETED BY TOM FREEMAN TELEPHONE (843) 857-1403 REPORTING PERIOD: OCTOBER 2002 No. Date Type Duration Reason' Method of Shutting Down Cause / Corrective Actions / Comments 2
F Forced (Hours) the Reactor or Reducing Power S, Scheduled 02.005 10/11/02 S 481 C 1 Shutdown for Refueling Outage 21.
2 Reason: Method:
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- The unit was operated at or near full power until 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on October 11, 2002, when the unit power reduction was started for Refueling Outage 21.
There were no challenges to the pressurizer safety valves during the month.
Attachment II to Serial: RNP-RA/02-0174 Page 1 of 6 STEAM GENERATOR TUBE INSPECTION REPORT This report summarizes the Steam Generator (SG) Inspection Program and the results of the examination that was performed at the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, during Refueling Outage (RO) 21, as required by the HBRSEP, Unit No. 2, Technical Specifications Section 5.6.8, "Steam Generator Tube Inspection Report."
- 1. Number and Extent of Tubes Inspected The SG Inspection Program included the use of multi-frequency Bobbin Coil, and Motorized Rotating Pancake Coil or Plus Point Coil (RPC) probes. RPC examinations were performed in SGs A, B, and C on approximately 20% of the inlet (hot leg) side historical manufacturing buff marks, dents, and on suspect bobbin indications (diagnostics). RPC examinations were also performed on 50% of the u-bend region of row 1 and 2. SGs A, B, and C had approximately 50% of open tubes tested with a Bobbin Coil probe, and 50% of the hot leg top-of-tubesheet (T'FS) area tested with RPC probes.
SG - -- Inspection Number Of Tubes A Cold Leg RPC Special Interest 46 A Cold Leg Bobbin 1871 A Hot Leg Bobbin Rows 1 and 2 93 A Hot Leg RPC Special Interest 111 A Hot Leg RPC Top of Tubesheet 1313 A Hot Leg RPC Rows l and 2 U-bend RPC 93 B Cold Leg RPC Special Interest 25 B Cold Leg Bobbin 1806 B Cold Leg RPC Rows 1 and 2 U-bend RPC 30 B Hot Leg Bobbin Rows 1 and 2 139 B Hot Leg RPC Special Interest 107 B Hot Leg RPC Top of Tubesheet 1522 B Hot Leg RPC Rows 1 and 2 U-bend RPC 65 C Cold Leg RPC Special Interest 20 C Cold Leg Bobbin 1709 C Hot Leg Bobbin Rows 1 and 2 133 C Hot Leg RPC Special Interest 57 C Hot Leg RPC Top of Tubesheet 1522 C Hot Leg RPC Rows 1 and 2 U-bend RPC 84
Attachment II to Serial: RNP-RA/02-0174 Page 2 of 6
- 2. Location and Wall Thickness Penetration Location definitions:
CTS Cold leg top-of-tubesheet HTS Hot leg top-of-tubesheet FBH Flow distribution baffle on hot leg side 02A Anti-vibration bar 2 03A Anti-vibration bar 3 04A Anti-vibration bar 4 02C Cold leg second support plate 02H Hot leg second support plate 03C Cold leg third support plate 03H Hot leg third support plate 06C Cold leg sixth support plate 06H Hot leg sixth support plate Tube Identification SG (Row and Column) Location % Depth A R37C50 HTS/0.04 41 A R38C50 HTS/0.07 41 A R37C51 HTS/0.04 37 A R4C39 03C/-0.88 37 A R23C14 HTS/0.05 26 A R33C41 HTS/0.04 26 A R34C41 HTS/0.13 25 A R41C53 HTS/0.08 29 A R15C35 02C/+51.00 20 A R24C54 03H1/-0.75 20 A RICI CTS/13.72 10 A R7C1 CTS/0.68 14 A R1C2 CTS/13.74 11 A R11C2 CTS/0.55 11 A R1C3 CTS/15.66 13 A R13C3 CTS/0.48 12 A R1C4 CTS/15.78 20 A R16C4 CTS/0.41 10 A R1C5 CTS/15.54 7 A RlC6 CTS/15.57 11 A R23C7 CTS/0.71 11 A R26C9 CTS/0.62 13 A R33C15 CTS/0.54 9 A R37C20 HTS/0.64 15
Attachment II to Serial: RNP-RAIO2-0174 Page 3 of 6 Tube Identification SG (Row and Column) Locaton %Depth A R40C25 CTS/O.47 14 A R42C30 CTS/O.47 13
____________HTS/O.62 11 A R43C33 CTS/0.56 10 A R44C36 CTSIO.60 14 A R43C37 CTS/0.55 10
____________CTS/1.75 10 A R45C41 CTSIO.62 19 A R45C47 CTSI2.74 13
____________CTS/6.74 11 A R45C52 CTSIO.49 17
_____________CTS/3.72 8 A R44C57 CTSIO.59 21 HTS/O.70 12
____________HTS/1.20 14 A R43C60 CTSIO.56 17 A R42C63 CTS/0.61 11I
_____________HTS/0.66 13 A R40C68 HTS/O.68 16
_____________HTS/O.75 15 A R36C74 HTS/O.64 12 A R31C80 CTSIO.55 I11 A R26C84 CTS/0.61 13 A R23C86 CTS/0.62 13 A R19C87 CTSI7.62 12 A RIC89 HTS/15.54 13 A R11C91 CTS/0.67 12 A R7C92 CTSIO.61 9 B RICI CTSI9.62 15 CTS/12.71 18 CTSI12.75 16 CTS/13.10 25
___ ___________CTSI15.26 16 B R2C1 CTS/10.07 17
_____________CTS/1 1.52 16 B R6C1 CTS/0.49 15 B R7CI CTSIO.63 14 CTSI1.14 15 CTS/12.47 19 B R11C2 CTS/0.48 17 B R16C4 CTS/0.44 15 B R23C7 HTS/O.94 16
Attachment IRto Serial: RNP-RA/02-O 174 Page 4 of 6 Tube Identification
,SG (Row and Column) Location % Depth B R26C9 HTS/0.54 17 B R7C16 CTSI15.94 17 B R34C18 FBHIO.60 20 B R37C20 HTS/0.60 20 B R40C25 CTSIO.51 21 B RIC27 CTSI16.33 41 B R2C42 CTSI1.50 24 B R34C43 HTS/0.O1 20 B R5C48 CTS/1.46 22
____________CTSI1.71 27 B R5C49 CTSI1.78 28 B R24C65 02H10.36 30 B R1C67 06C1-0.53 22 06C/-0.62 10
_____________06C/0.56 7 B R33C78 CTSIO.62 18 B R26C84 CTSIO.69 20 B RIC92 CTSI8.55 15 CTSI9.62 16 CTSI1O.92 24 CTSI1O.92 16 CTSI1 1.86 16 HTS/1.94 13 HTS/2.82 17
____________HTS/14.12 14 B R2C92 CTS/10.66 15 C R45C41 06H1-0.98 50 C R7C1 CTSIO.64 15 C R44C38 HTS/0.48 16 C R34C50 HTS/-0.03 14 C R34C5 1 HTS/0.05 7 C R44C57 HTS/0.58 16
_____________HTSI1.18 15 C R33C78 HTFS/0.66 18 C R3C91 HTS/0.32 23 C R37C45 03A/0.0 6 04A/0.0 4 03A/0. 15 6 04A/0.02 4 C R35C61 02A/-0.21 5
___ __ __ __ __ __ I_ 03A/0. 13 3 I to Serial: RNP-RAI02-0174 Page 5 of 6 Tube Identification SG (Row-and Column) Location- %-Depth' C R38C62 02A/-0.23 3 03A/-0.31 11 C R31C13 06C/-0.44 5 06C/+0.63 6 The facility had zero primary-to-secondary leakage at the time the refueling outage was commenced.
- 3. Identification of Tubes Plugged Steam Generator., ,Tube 4Comments - '
A R37C50 Wear is at top of tubesheet at hot leg side due to transient loose part. No loose part was determined to be present. This tube was last examined during Refueling Outage (RO) 19 in 1999 and there has been a slight change in the indication. The indication depth is below plugging limit required by the Technical Specifications. The indication was bounded by inspection of the surrounding tubes.
The tube was preventatively plugged.
A R38C50 Wear is at top of tubesheet at hot leg side due to transient loose part. No loose part was determined to be present. This tube was last examined in 1999 (RO-19) and there has been a slight change in the indication. The indication depth is below plugging limit required by the Technical Specifications. The indication was bounded by inspection of the surrounding tubes. The tube was preventatively plugged.
A R37C51 Wear is at top of tubesheet at hot leg side due to transient loose part. No loose part was determined to be present. This tube was last examined in 1996 (RO-17) and there was no indication present.
The indication depth is below plugging limit required by the Technical Specifications. The indication was bounded by inspection of the surrounding tubes. The tube was preventatively plugged.
Attachment II to Serial: RNP-RAI02-0174 Page 6 of 6
- Steam' Generator J Tube Comments A R4C39 Indication is attributed to mechanical wear. No loose part was determined to be present. This tube was last examined in 1996 (RO-17) and there was no indication present. The indication depth is below plugging limit required by the Technical Specifications.
The tube was preventatively plugged.
B R1C27 Peripheral tube in blowdown lane with mechanical wear. The cause of this indication was attributed to impact by maintenance equipment. The indication correlates with equipment insertion down the blowdown lane. The indication depth is below plugging limit required by the Technical Specifications. The tube was preventatively plugged.
B R34C43 Indication is attributed to wear due to loose part. The loose part was determined to be still present. The indication was bounded by examining surrounding tubes, with no other indications found. The indication depth is below plugging limit required by the Technical Specifications. The tube was preventatively plugged and staked.
B R24C65 Indication is attributed to wear at the flow distribution baffle on hot leg side. No loose part was determined to be present. This tube was last examined in 1998 (RO-18) and there was no indication present. The indication depth is below plugging limit required by the Technical Specifications. The tube was preventatively plugged.
C R45C41 Wear is below the 6h support plate on the hot leg side and is indicative of transient loose part wear. No loose part was determined to be present. This tube was last examined in 2001 (RO-20) and there was no indication present. Adjacent tubes were examined, with no indications or loose parts found.