Part 21 Rept Re Nozzle Weld Defects in Chemical & Vol Control Sys Connections at RCP Seal Injection Nozzles & Ccws Connections at RCP Thermal Barrier Heat Exchanger Inlet & Outlet Nozzles Supplied by W
ML20113B207
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/17/1996
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-96 RC-96-0157, RC-96-157, NUDOCS 9606260244
Download: ML20113B207 (1)


Text

_ - _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

a South Carolina Electric & Gas Company Gary J. Taylor e P.O. Box 88 Vice President

, e Jenkinsville, SC 29065 Nuclear Operations (803) 345 4344 SCE&G Ascnanscarpany June 17,1996 RC-96-0157 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

i

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)

DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 INTERIM PART 21 REPORT (SSH 960004)

South Carolina Electric & Gas Company (SCE&G) submits this letter in accordance with 10CFR21.21(a)(2) as an interim report of an identified defect potentially associated with a substantial safety hazard.

On April 28,1996, Nonconformance Notice (NCN) 5415 was initiated to address the nozzle weld defects in the Chemical and Volume Control System connections at the reactor coolant pump seal injection line nozzles and Com sonent Cooling Water System connections at the reactor coolant pump thermal aarrier heat exchanger I j

inlet and outlet nozzles.

The subject condition 76 N SCE&G suspects that weabears to beinathe flaws existe heneric originalhardware defect nozzle welds in manufacturing.

supplied by Westinghouse.

SCE&G has taken the following actions:

All nine (9) nozzles were inspected. Six (6) nozzles revealed indications of cracking and were repaired using the TIG welding process, and satisfactorily reinspected.

The original equipment manufacturer has been contacted.

SCE&G expects to complete the evaluation of 10CFR21 reportability prior to September 1,1996.

If you require any further information, please contact Mr. Michael J. Zaccone at (803) 345-4328.

Ve trulyyo s, 9606260244 96o617

[DR ADOCK 05000395 g PDR Gar j aylo MJZ/GJT/nkk c: J. L. Skolds J. B. Knotts, J r.