Part 21 Rept Re 911107 C Feedwater Isolation Valve Actuator Failure Due to Defect in Poppet Seal.Seal Replaced & Testing by Independent Lab Being Performed to Determine Physical Properties of Original Poppet Seals
ML20102B121
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/10/1992
From: Haile D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Scarfo G
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
REF-PT21-92 NUDOCS 9207280188
Download: ML20102B121 (2)


Text

___

r-7 POWER REACTOR lEVENTNUMEER:

23834 FACILITY: SUMMER REGION:

2 NOTIFICATION DATE: 07/10/92 UNIT:

[1] [ ] [ ]

STATE: SC NOTIFICATION TIME: 17:32 [ET)

RX TYPE: [1] W-3-LP EVENT DATE:

07/10/92 EVENT TIME:

16:00[EDT)

NRC NOTIFIED BY: DAVID HAILE LAST UPDATE DATE:

07/10/92 HQ OPS OFFICER:

THOMAS ANDREWS NOTIFICATIONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION:

CDEG 21. 21(c) (3) (i)

DEFECTS / NONCOMPLIANCE UNIT SCRAM CODE RX CRIT INIT PWR INIT RX MODE CURR PWR CURR RX MODE 1

N Y

100 POWER OPERATION 100 POWER OPERATION EVENT TEXT

{THEEVALUATIONOFANIDENTIFIEDDEFECtPOTENTIALLYASSOCI ED WITH A SUBSTANTIAL SAFETY HAZARD AS DESCRIBED IN AN INTERIM REPORT SUBMITTED ON JANUARY 6, 1992 HAS BEEN BEEN COMPLETED.

THIS EVALUATION RESULTED IN A DETERMINATION THAT THE SUBSTANTIAL SAFETY HA3ARD DID EXIST.

ON NOVEMBER 7, 1991, THE

'C' FEEDWATER ISOLATION VALVE ACTUATOR (XVG-1611C-0-FW) FAILED DURING POST MODIFICATION TESTING.

THE FAILURE HAS BEEN TRACKED TO A ' POPPET' SEAL IN THE CONTROL VALVE ASSEMBLY WHICH CONTROLS THE OPENING AND CLOSING OF THE FEEDWATER ISOLATION VALVE.

SUBSEQUENTLY, SEVERAL ADDITIONAL FAILURES OCCURRED DURING EXTENDED TESTING.

AS A RESULT, A NEW DESIGN ' POPPET' SEAL WAS EXTENSIVELY TESTED AND PLACED INTO SERVICE, RESOLVING THE PROBLEM.

AT THIS TIME, THE LICENSEE IS EVALUATING THE FAILURES AS FOLLOWS:

1.

TESTING BY AN INDEriNDENT LAB TO DETERMINE THE PHYSICAL PROPERTIES OF THE ORIGINAL ' POPPET' SEALS.

2.

COMPARING 'AS FOUND' PHYSICAL PROPERTIES OF THE ' POPPET' SEALS TO

'AS SPECIFIED' PROPERTIES.

3.

PERFORMING ' FINITE ELEMENT' ANALYSIS ON THE ORIGINAL AND NEW

' POPPET' SEAL DESIGNS.

4.

DEVELOPING CONCLUSIONS AS TO 10 CFR 20.21 REPORTABILITY.

THE LICENSEE EXPECTS TO COMPLETE THIS EVALUATION BY JULY 15, 1992.

L

/ Continued on next page)

I iv 9207280188 920710

/, / ! L,.1 PDR ADOCK 05000395

/

{li PDR g

v

l TACILITY: SUMMER PAGE # 2 OF EVENT NUMBER: 23834 Til S NOTIFICATION IS BEING MADE PER THE REQUIREMENTS OF 0 CFR

21. 21(C) ( 3) (I). A WRITTEN REPORT WILL BE SUBMITTED WITHIN 30 DAYS.

THE NRC RESIDENT INSPECTOR HAS BEEN NOTIFIED.

NO OTHER NOTIFICATIONS ARE REQUIRED OR ANTICIPATED.

p M

e W

k

-