RBG-17-358, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Investigation Incomplete.Interim or Final Rept Will Be Provided by 840424

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Investigation Incomplete.Interim or Final Rept Will Be Provided by 840424
ML20087M838
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/23/1984
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
DR-121, RBG-17-358, NUDOCS 8404020050
Download: ML20087M838 (1)


Text

, . - - .,

?

k GULF STATES UTILITIES COMPANY POST OFFICE DOX 2951 =

BEAUMONT. TEXAS 77704 AREA CODE 409 838 6631 March 23, 1984 RBG- 17,358 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-121 .

Gulf States Utilities Company has not completed its investigationofDR-121concerningMCCequipmentsuppliol2' ggg I.T.E. Gould, Incorporated. An interim or final status /)I q.

report will be provided by April 24, 1984. QQ 2 6l984 ,

Sincerely, ,

R J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/ /kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Resident Inspector-Site 8404020050 840323 PDR ADOCK 05000458 c S PDR p

~

[

t0