Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML21196A076, ML22045A053, ML22111A314, ML22193A254, ML22349A148, ML24255A332, RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1, RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3, RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4, RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3, RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a, RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L, RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a, RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6, RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a, RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b
|
MONTHYEARML21158A1932021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses Project stage: Request RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 Project stage: Request ML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 Project stage: Request ML21196A0762021-07-23023 July 2021 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review Project stage: Other ML21271A5862021-09-21021 September 2021, 22 September 2021, 28 September 2021 SLRA - RAI B2.1.27-1 Project stage: Request ML21270A2492021-09-27027 September 2021 Beyond Nuclear and Sierra Club Hearing Request Project stage: Request ML21295A7182021-10-22022 October 2021 Applicant'S Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club Project stage: Request RA-21-0281, Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-12021-10-22022 October 2021 Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-1 Project stage: Response to RAI ML21295A7172021-10-22022 October 2021 Notices of Appearance for Tracey M. Leroy, Paul M. Bessette, and Ryan K. Lighty on Behalf of Duke Energy Carolinas, LLC Project stage: Request RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 Project stage: Supplement ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 Project stage: Request ML21313A2322021-11-0404 November 2021 SLRA - Requests for Confirmation of Information - Set 1 Project stage: Request RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 Project stage: Supplement ML21327A2772021-11-23023 November 2021 SLRA - Requests for Additional Information (Set 1) + 2nd Round RAI B2.1.27-1a Project stage: Request ML21335A2692021-12-0101 December 2021 Petitioners' Response to Duke Motion to Strike Portion of Petitioners' Reply Project stage: Request RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 Project stage: Other RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 Project stage: Supplement RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 Project stage: Request RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a Project stage: Response to RAI ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information Project stage: Response to RAI ML22024A0592022-01-19019 January 2022 ONS - Electrical On-Site and OE Audit (Virtual) - Continued Project stage: Request ML22024A0022022-01-19019 January 2022, 20 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Duke Energy Project stage: Request ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence Project stage: Request ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections Project stage: Request ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min Project stage: Request ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses Project stage: Request ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs Project stage: Request ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects Project stage: Request ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring Project stage: Request ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection Project stage: Request ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System Project stage: Request ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators Project stage: Request ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion Project stage: Request ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping Project stage: Request ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System Project stage: Request ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler Project stage: Request ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening Project stage: Request ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling Project stage: Request ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress Project stage: Request ML22024A0512022-01-20020 January 2022 Breakout Questions - Trp 149.4 - LBB Project stage: Request ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS Project stage: Request ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance Project stage: Request ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural Project stage: Request ML22024A0372022-01-20020 January 2022 Breakout Questions - Trp 74 - Concrete Project stage: Request ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures Project stage: Request ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring Project stage: Request ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls Project stage: Request ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J Project stage: Request ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl Project stage: Request ML22024A0292022-01-20020 January 2022 Breakout Questions - Trp 41 - IWE Project stage: Request 2021-12-17
[Table View] |
|
---|
Category:Letter type:RA
MONTHYEARRA-24-0259, Transmittal of Core Operating Limits Reports (COLR) for Oconee Nuclear Station (ONS) Unit 1 Cycle 33 (Revision 2), ONS Unit 2 Cycle 32 (Revision 1 and ONS Unit 3 Cycle 33 (Revisions O and 1)2024-10-16016 October 2024 Transmittal of Core Operating Limits Reports (COLR) for Oconee Nuclear Station (ONS) Unit 1 Cycle 33 (Revision 2), ONS Unit 2 Cycle 32 (Revision 1 and ONS Unit 3 Cycle 33 (Revisions O and 1) RA-24-0244, Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan2024-09-30030 September 2024 Snubber Program Plan Revision, AD-EG-ONS-1618, Oconee Nuclear Station Snubber Program Plan RA-24-0229, Transmittal of Refuel 32 (O3R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2024-09-23023 September 2024 Transmittal of Refuel 32 (O3R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-24-0215, Registration for Use of General License Spent Fuel Cask Numbers 177 and 1782024-08-15015 August 2024 Registration for Use of General License Spent Fuel Cask Numbers 177 and 178 RA-24-0197, Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition2024-07-31031 July 2024 Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition RA-24-0092, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis2024-07-29029 July 2024 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis RA-24-0136, Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 52024-05-24024 May 2024 Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 5 RA-24-0152, Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2024-05-22022 May 2024 Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-24-0132, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Steam Generator Tube Inspection Report2024-05-14014 May 2024 Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Steam Generator Tube Inspection Report RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0096, Instrumentation and Control Safety Systems NRC Review of Framatome TXS-Compact Topical Report2024-04-24024 April 2024 Instrumentation and Control Safety Systems NRC Review of Framatome TXS-Compact Topical Report RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0103, Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval2024-04-19019 April 2024 Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0073, Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2024-03-21021 March 2024 Transmittal of Oconee Unit 2, Refuel 31 (O2R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-24-0071, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications RA-24-0072, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee RA-24-0053, Registration for Use of General License Spent Fuel Cask Number 1762024-02-20020 February 2024 Registration for Use of General License Spent Fuel Cask Number 176 RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 12023-05-0404 May 2023 Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-27027 April 2023 Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 2024-09-30
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-24-0197, Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition2024-07-31031 July 2024 Subsequent License Renewal Application Response to Request for Additional Information 2024 Annual Update and Subsequent License Renewal Application Supplement 5 Addition RA-24-0103, Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval2024-04-19019 April 2024 Response to Request for Additional Information (RAI) Regarding License Amendment Request for a One-Time Extension to the Integrated Leak Rate Test Interval RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.62022-07-25025 July 2022 Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b2022-07-0808 July 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a2022-06-0808 June 2022 Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-12022-05-27027 May 2022 Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a2022-05-20020 May 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L2022-05-11011 May 2022 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 42022-04-22022 April 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-32022-04-20020 April 2022 Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW2022-04-14014 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates2022-03-31031 March 2022 Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 42022-03-22022 March 2022 Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 32022-02-21021 February 2022 Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 32022-01-21021 January 2022 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material2022-01-20020 January 2022 Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a ML22019A1182022-01-0707 January 2022 Enclosures 1,2 & 3: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E, Environmental Report - Index of Duke Energy'S Responses, Responses to NRC Requests for Confirmation of Information and NRC Reque ML22019A1232022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information and Request for Confirmation of Information ML22019A1202022-01-0707 January 2022 Appendix K ML22019A1242022-01-0707 January 2022 Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents ML22019A1192022-01-0707 January 2022 Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist ML22019A1212022-01-0707 January 2022 Appendix 13-B Peer Reviewer Communication Log ML22019A1222022-01-0707 January 2022 Calculation of Permeability by the Falling Head Method RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station2022-01-0707 January 2022 Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 RA-21-0269, Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-282021-11-0909 November 2021 Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-28 RA-21-0270, Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-8532021-10-28028 October 2021 Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853 RA-21-0242, Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection2021-08-31031 August 2021 Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection RA-21-0219, Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals2021-08-0505 August 2021 Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information2020-09-17017 September 2020 Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information RA-19-0281, Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093)2019-07-31031 July 2019 Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093) RA-19-0301, Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information2019-07-31031 July 2019 Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information RA-19-0134, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-052019-03-0707 March 2019 Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-05 2024-07-31
[Table view] |
Text
Steven M. Snider Vice President Oconee Nuclear Station Duke Energy ON01VP l 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3478 f: 864.873.5791 Steve.Snider @duke-energy.com RA-22-0137 May 20, 2022 10 CFR 50.4 10 CFR Part 54 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, DPR-47, DPR-55 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a
References:
- 1. Duke Energy Letter (RA-21-0132) dated June 7, 2021, Application for Subsequent Renewed Operating Licenses, (ADAMS Accession Number ML21158A193)
- 2. NRC Letter dated July 22, 2021, Oconee Nuclear Station, Units 1, 2, and 3 - Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding Duke Energy Carolinas Application for Subsequent License Renewal (ADAMS Accession Number ML21194A245)
- 3. NRC E-mail dated September 22, 2021, Oconee SLRA - Request for Additional Information B2.1.27-1 (ADAMS Accession Number ML21271A586)
- 4. Duke Energy Letter (RA-21-0281) dated October 22, 2021, Subsequent License Renewal Application, Response to Request for Additional Information B2.1.27-1 (ADAMS Accession Number ML21295A035)
- 5. NRC E-mail dated November 23, 2021, Oconee SLRA - Request for Additional Information - Set 1 and Second Round Request for Additional Information RAI B2.1.27-1a (ADAMS Accession Number ML21327A277)
- 6. Duke Energy Letter (RA-21-0332) dated January 7, 2022, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a (ADAMS Accession Number ML22010A129)
- 7. NRC E-mail dated January 11, 2022, Oconee SLRA - Request for Additional Information - Set 2 (ADAMS Accession Numbers ML22012A043 and ML22012A042)
- 8. Duke Energy Letter (RA-22-0036) dated February 14, 2022, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 2 (ADAMS Accession Number ML22045A021)
- 9. NRC E-mail dated January 18, 2022, Oconee SLRA - Request for Additional Information Set 3 (ADAMS Accession Numbers ML22019A103 and ML22019A104)
U.S. Nuclear Regulatory Commission May 20, 2022 Page 2
- 10. Duke Energy Letter (RA-22-0040) dated February 21, 2022, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 3 (ADAMS Accession Numbers ML22052A002)
- 11. NRC E-mail dated March 16, 2022, Oconee SLRA - Request for Additional Information Set 4 (ADAMS Accession Numbers ML22080A077 and ML22080A079)
- 12. NRC E-mail dated March 21, 2022, Oconee SLRA - 2nd Round RAI B4.1-3 (ADAMS Accession Numbers ML22080A077 and ML22080A079)
- 13. NRC E-mail dated March 29, 2022, Oconee SLRA - 2nd Round RAI 4.6.1-1a (ADAMS Accession Number ML22091A091)
- 14. Duke Energy Letter (RA-22-0129) dated April 20, 2022, Subsequent License Renewal Application Responses to Oconee SLRA - 2nd Round RAI B4.1-3 (ADAMS Accession Number ML22110A207)
- 15. Duke Energy Letter (RA-22-0124) dated April 22, 2022, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 (ADAMS Accession Numbers ML22112A016)
By letter dated June 7, 2021 (Reference 1), Duke Energy Carolinas, LLC (Duke Energy) submitted an application for the subsequent license renewal of Renewed Facility Operating License Numbers DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear Station (ONS), Units 1, 2, and 3 to the U.S. Nuclear Regulatory Commission (NRC). On July 22, 2021 (Reference 2), the NRC determined that ONS subsequent license renewal application (SLRA) was acceptable and sufficient for docketing. In emails from NRC to Steve Snider (Duke Energy) dated September 22, 2021, November 23, 2021, January 11, 2022, January 18, 2022, March 16, 2022, and March 21, 2022 (References 3, 5, 7, 9, 11, and 12), the NRC transmitted specific requests for additional information (RAl) to support completion of the Safety Review. The responses were provided to the NRC on October 22, 2021, January 7, 2022, February 14, 2022, February 21, 2022, April 20, 2022, and April 22, 2022 (References 4, 6, 8, 10, 14, and 15).
In an email from Angela X. Wu (NRC) to Steve Snider (Duke Energy) dated March 29, 2022 (Reference 13), the NRC transmitted a second round for RAl 4.6.1-1a to support completion of the Safety Review. contains the response for RAI 4.6.1-1a. As directed by the NRC Project Manager, the revised due date for this response is May 20, 2022. This submittal contains no new or revised regulatory commitments.
Should you have any questions regarding this submittal, please contact Paul Guill at (704) 382-4753 or by email at paul.guill@duke-energy.com.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 20, 2022.
Sincerely, Steven M. Snider Site Vice President Oconee Nuclear Station
Enclosure:
- 1. Response to ONS SLRA Second Round RAI 4.6.1-1a
U.S. Nuclear Regulatory Commission May 20, 2022 Page 3 CC: W/O
Enclosures:
Laura A. Dudes Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Angela X. Wu, Project manager (by electronic mail only)
U.S. Nuclear Regulatory Commission Mail Stop 11 G3 11555 Rockville Pike Rockville, Maryland 20852 Shawn A. Williams, Project Manager (by electronic mail only)
U.S. Nuclear Regulatory Commission Mail Stop 8 B1A 11555 Rockville Pike Rockville, Maryland 20852 Jared Nadel (by electronic mail only)
NRC Senior Resident Inspector Oconee Nuclear Station Anuradha Nair (by electronic mail only: naira@dhec.sc.gov)
Bureau Environmental Health Services Department of Health & Environmental Control 2600 Bull Street Columbia, South Carolina 29201
U.S. Nuclear Regulatory Commission May 20, 2022 Page 4 BCC: W/O
Enclosures:
T.P. Gillespie K. Henderson S.D. Capps T.M. Hamilton P.V. Fisk H.T. Grant S.A. Dalton M.C. Nolan L. Grzeck S.M. Snider R.K. Nader G.D. Robison T.M. LeRoy P.F. Guill R.V. Gambrell File: (Corporate)
Electronic Licensing Library (ELL)
ENCLOSURE 1 OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 SUBSEQUENT LICENSE RENEWAL APPLICATION RESPONSE TO ONS SLRA 2ND ROUND RAI 4.6.1-1a
Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Response to ONS SLRA 2nd Round RAI 4.6.1-1a Enclosure 1 Response to ONS SLRA 2nd Round RAI 4.6.1-1a Request for Additional Information (RAI) 4.6.1-1a:
Regulatory Basis:
Title 10 of the Code of Federal Regulations (CFR) Section 54.21(a)(3) requires an applicant to demonstrate that the effects of aging for each structure and component identified in 10 CFR 54.21(a)(1) will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. One of the findings that the U.S. Nuclear Regulatory Commission (NRC) staff must make to issue a renewed license (10 CFR 54.29(a)) is that actions have been identified and have been or will be taken with respect to managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis.
Per 10 CFR 54.21(c), the applicant is required to evaluate time limited aging analyses (TLAA) and disposition them in accordance with (c)(1)(i), (c)(1)(ii), or (c)(1)(iii). SRP-SLR Section 4.6.1.1 states, in part: The ASME Code contains explicit requirements for fatigue parameter evaluations (fatigue analyses or fatigue waivers), which are TLAAs.
In order to complete its review and enable making a finding under 10 CFR 54.29(a), the staff requires additional information in regard to the matters described below.
Background:
SLRA Section 4.6.1, Containment Liner Plate and Cold Penetrations, as amended by response to RAI 4.6.1-1 by letter dated February 14, 2022 (ADAMS Accession No. ML22045A021) states, in part:
For 80-years of operation, the accumulated effects of containment liner and cold penetration loading conditions were evaluated to contemporary standards in accordance with the ASME Code,Section III, Paragraph N-415, to validate that a detailed fatigue analysis would not be warranted. The containment liner plate and cold penetration materials of construction listed in Table 4.6.1-1 above, in particular the carbon steel SA-516 Grade 70 material, meets all six criteria in the ASME Code,Section III, Subsection N-415.1 for the 500 applied design cycles for these components. This evaluation is bounding for the liner plate and cold penetrations, including mechanical, electrical, equipment and personnel-related penetrations.
TLAA Disposition: 10 CFR 54.21(c)(1)(ii)
The fatigue waiver analysis associated with the containment liner plate and cold penetrations meets all six criteria in the ASME Code,Section III, Subsection N-415.1 and will remain valid for the subsequent period of extended operation, in accordance with 10 CFR 54.21(c)(1)(ii).
The related review procedures in SRP-SLR Section 4.6.3.1.1.2 states, in part: The revised fatigue parameter evaluations [fatigue analyses or fatigue waivers] based on the projected number of occurrences and severities of cyclic loads are reviewed to ensure that the calculated fatigue parameters remain less than the allowed values at the end of the subsequent period of extended operation.
1
Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Response to ONS SLRA 2nd Round RAI 4.6.1-1a Issue:
The fatigue waiver evaluation that the applicant stated, in the response to RAI 4.6.1-1, to have performed for the containment liner plate and cold penetrations (including mechanical, electrical, and equipment and personnel-related penetrations) in accordance with the ASME Code,Section III, paragraph N-415.1 was not available for required staff verification during the audit (see audit report section for SLRA TLAA Section 4.6.1, Containment Liner Plate in ADAMS Accession No. ML22045A053). Therefore, the staff was unable to verify the claimed fatigue waiver analysis during the audit. Further, SLRA Section 4.6.1, as amended by the response to RAI 4.6.1-1, does not appear to provide sufficient technical detail that demonstrates how the fatigue waiver analyses satisfied all the six acceptance criteria in the ASME Code,Section III, paragraph N415.1, for the containment liner plate and each of the cold penetrations for which it is credited. The staff needs additional information to verify the applicants fatigue waiver analyses to make its regulatory finding for the TLAA.
Request:
Provide the fatigue waiver analyses of record (calculation that includes material and cyclic inputs and fatigue parameter evaluations) that demonstrates how the six criteria in the ASME Code,Section III, paragraph N415.1 (1965 edition code of record) were shown to be met for the containment liner plate and each of the cold penetrations for which it is credited.
Alternatively, describe in sufficient technical detail (providing reference to the analysis of record, including material and cyclic inputs and fatigue parameter evaluations) how each of the six acceptance criteria in the ASME Code,Section III, paragraph N415.1 (1965 edition code of record) were satisfied for the containment liner plate and each of the cold penetrations for which the fatigue waiver analysis is credited.
Response to RAI 4.6.1-1a:
As part of subsequent license renewal (SLR), a fatigue exemption evaluation was performed for the containment liner plate and cold penetrations and is documented in Oconee plant calculation OSC-2077-03-SLR-1009, Supporting Analysis for Subsequent License Renewal (SLR) - Reactor Building Liner Plate and Penetration Design & Licensing Bases Review to Support a Fatigue Exemption Evaluation for ONS SLR Application. Cold penetrations are defined as mechanical, electrical, equipment and personnel hatches, and fuel transfer tube, excluding the main steam and main feedwater penetrations. As described in Oconee UFSAR Section 3.8.1.5.3, the containment liner plate and penetrations are designed in accordance with the 1965 Edition of the ASME Boiler and Pressure Vessel Code,Section III, Nuclear Vessels. The fatigue exemption evaluation for the Oconee containment liner plate and cold penetrations was performed in accordance with 1965 ASME Section III, Article 4, Paragraph 415.1 (ASME Code). The evaluation demonstrates that the Oconee containment liner plate and cold penetrations meet the six criteria for fatigue exemption, and therefore these components do not require an explicit Code fatigue analysis.
The design conditions for the Oconee containment liner plate and penetrations are described in the Oconee UFSAR Section 3.1.49 and include a design pressure of 60 pounds per square inch gauge (psig) and a design temperature of 300 degrees Fahrenheit (300°F). The operating pressure for the containment liner and penetrations is 5 psig as shown in Technical Specification 3.6.4. As determined from operational data, the maximum average reactor building operating temperature for Oconee Units 1, 2, and 3 is 140°F. Oconee UFSAR Section 3.8.1.5.3 describes the fatigue loads that are considered in the design of the containment liner plate and penetrations. The bounding full range temperature and pressure cycles for the Oconee Units is 500 cycles, which includes Type A integrated leak rate tests required by 10 CFR 50, Appendix J. The materials of construction for the Oconee containment liner 2
Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Response to ONS SLRA 2nd Round RAI 4.6.1-1a plates and penetrations are described in Table 4.6.1-1 below. Each material was considered for the evaluation, and it was determined that SA-516 Grade 70 was the limiting material based on design stress intensities. All material values used in the fatigue exemption evaluation are taken from Tables N-421, N-426, and N-427 of the 1965 Edition of the ASME Code,Section III.
Table 4.6.1-1: ONS Liner Plate and Cold Penetrations Materials of Construction ASTM Material Type Components Carbon A36 Containment Liner Plate Steel Containment Liner Carbon SA-516 Grade 70 Mech. Penetrations Plate Steel Elec. Penetrations Carbon Mech. Penetrations A-333 Grade 6 Pipe Steel Elec. Penetrations Carbon Mech. Penetrations A-155 Pipe Steel Elec. Penetrations Carbon A36 Elec. Penetrations Rod Steel Carbon Mech. Penetrations Pipe Cap/Dished SA-516 Grade 70 Steel Elec. Penetrations Head Carbon SA-106 Grade C Mech. Penetrations Pipe Steel Carbon A-350 Grade LF2 Elec. Penetrations Forging Steel Carbon A-234 Grade WPB Elec. Penetrations Fittings Steel Stainless SA-182 F304 Elec. Penetrations Flange Steel Stainless SA-316 Mech. Penetrations Plate Steel Criteria (a) from Paragraph N-415.1 of the 1965 Edition of the ASME Code,Section III, describes the specified number of times (including startup and shutdown) that the pressure will be cycled from atmospheric pressure to operating pressure and back to atmospheric pressure. The allowed number of cycles is calculated as 3 times the design stress intensity, Sm, at the operating temperature and is compared to the applied cycles. The material used for the fatigue exemption evaluation is SA-516, Grade 70 (Table N-421, SA-212, Grade B, 70 kips per square inch (ksi) minimum tensile). At the specified operating temperature for the containment liner plate and penetrations, this results in an S m value of 23.22 ksi. Figure N-415(A) of the 1965 Edition of the ASME Code,Section III, provides the 3
Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Response to ONS SLRA 2nd Round RAI 4.6.1-1a allowable amplitude of alternating stress intensity, Sa, for carbon and alloy steels. At a value of 3 times Sm, the allowed number of cycles is 1600. This value is greater than the 500 full range temperature and pressure cycles for the containment liner plate and penetrations and therefore Criteria (a) is met.
Criteria (b) from Paragraph 415.1 of the 1965 Edition of the ASME Code,Section III, describes that the full range of pressure fluctuations during normal operation shall not exceed the quantity (1/3) x design pressure x (Sa/Sm). Sa is the value obtained from the applicable fatigue curve for the total specified number of significant pressure fluctuations and is 105 ksi. S m is taken from Table N-421 from ASME Code,Section III and is 23.22 ksi as described in Criteria (a). The quantity of the full range of pressure fluctuations during normal operation is calculated as 90 psig. Therefore, the normal pressure fluctuations would have to be greater than 90 psig to be fatigue significant. Normal service conditions for the containment liner plate and penetrations are -2.45 to 1.2 psig, and Type A integrated leak rate tests are 60 psig. Both normal service conditions and Type A integrated leak rate tests are less than 90 psig, which is the pressure fluctuation to be considered fatigue significant. Therefore, neither the normal pressure fluctuations or the Type A integrated leak rate tests are fatigue significant and Criteria (b) is met.
Criteria (c) from Paragraph N-415.1 of the 1965 Edition of the ASME Code,Section III, describes the allowable temperature difference during normal operation startup and shutdown and is based on mean operating temperature and Sa. The minimum operating temperature for the Oconee Units is 70°F and the maximum operating temperature is 140°F. This results in a mean operating temperature of 105°F.
Sa was determined in Criteria (b) and is 105 ksi at the maximum operating temperature of 140°F. The modulus of elasticity and the coefficient of thermal expansion were extracted from Tables N-426 and N-427 of the 1965 Edition of the ASME Code,Section III at a mean operating temperature of 105°F. This resulted in an allowable temperature difference of 301°F for 500 cycles, which is less than the temperature difference of 70°F during normal operation and Criteria (c) is met.
Criteria (d) from Paragraph N-415.1 of the 1965 Edition of the ASME Code,Section III, describes that the allowable temperature difference during normal operation does not exceed the quantity S a where Sa is the allowed stress for 106 thermal expansion. As defined previously, the Sa for 500 cycles is 105 ksi and the Sa for 106 cycles is 12.5 ksi as shown in Figure N-415(A) of the ASME Code. The values for the modulus of elasticity and the coefficient of thermal expansion are taken from Tables N-426 and N-427 of the 1965 Edition of the ASME Code,Section III at a mean operating temperature of 105°F. The allowed temperature difference for 106 cycles is 36°F and the allowed temperature difference at 500 cycles is 301°F. To be significant, a temperature difference greater than 36°F would be required, thus all 500 cycles are significant. Since the actual temperature difference is 70°F (from 70°F to 140°F) and the allowed temperature difference is 301°F, Criteria (d) is met.
Criteria (e) from Paragraph N-415.1 of the 1965 Edition of the ASME Code,Section III, describes the allowable temperature difference during normal operation for dissimilar materials. A significant temperature difference is defined as a value greater than Sa/[2(E1 1 - E2 2)], where Sa is the allowed stress for the weaker material. The dissimilar metals in the Oconee containment liner plate and penetrations are carbon steel and stainless steel. The values of S a for carbon steel are taken from Figure N-415(A) of the ASME Code, and the values of Sa for stainless steel are taken from Figure N-415(B) of the ASME Code. For each material the values of Sa are considered for 500 cycles and 106 cycles. For carbon steel these values are 105 ksi and 12.5 ksi. For stainless steel the values are 136 ksi and 26 ksi. The values for the modulus of elasticity and coefficient of thermal expansion of each material were taken from Tables N-426 and N-427 of the 1965 Edition of the ASME Code,Section III at a mean operating temperature of 105°F. Using the Sa for the weaker material, the resulting allowed temperature difference at 106 cycles is 79°F. To be significant, a temperature difference greater than 4
Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Response to ONS SLRA 2nd Round RAI 4.6.1-1a 79°F would be required, thus all 500 cycles are not fatigue significant. Since the actual temperature difference value is 70°F and the 500 cycles are not fatigue significant, Criteria (e) is met.
Criteria (f) from Paragraph N-415.1 of the 1965 Edition of the ASME Code,Section III, describes that the specified full range of mechanical loads, excluding pressure but including pipe reactions, does not result in load stresses whose range exceeds Sa. The cycles considered for this evaluation were 106 cycles and 7000 cycles. The Sa value was taken from Figure N-415(A) for each number of cycles and resulted in values of 12.5 ksi and 42.85 ksi. For comparison, the S a value for stainless steel was taken from Figure N-415(B) and resulted in a value of 64.425 ksi. Therefore, the carbon steel is the limiting fatigue material.
Reactor building penetrations were designed primarily for faulted loads and their associated allowable stress values. Normal loads were not considered to be design limiting. Initially, the imposed penetration faulted loads were conservatively compared to their resultant normal stress allowable values of 18.7 ksi. In specific cases where the faulted loads exceeded normal allowable values, (Penetrations 7 and 9, specifically) additional analyses were performed. In these cases, normal loads were compared to resultant normal allowable stresses (19.25 ksi) and faulted loads to faulted allowable stress values (25.3 ksi).
Oconee now qualifies the reactor building penetrations within the various piping analysis calculations.
The current penetration qualification process compares faulted loads to faulted load allowable values.
In some cases, as in the 1980s, normal loads are compared to normal allowable loads. Those penetration loads are not 'converted' into normal penetration stresses, as the allowable loads reflect the allowable normal and faulted stresses (19.25 and 25.3 ksi, respectively) developed in the 1980s.
Maintaining penetration loads below their load allowable values keeps the resulting normal penetration stresses below 19.25 ksi, well below the Sa value for the penetration material. Thus, the moment loads meet the Sa allowable for the piping materials, and Criteria (f) is met.
In summary, the fatigue exemption evaluation described above meets all six criteria defined in the 1965 Edition of the ASME Code,Section III, Nuclear Vessels. The evaluation bounds the containment liner plate and cold penetrations that are part of the Oconee Units. The information provided herein supports the response to RAI 4.6.1-1, included in RAI Set 2 (ML22045A021), that updated the Oconee SLRA Sections 4.6.1 and A4.6.1 to describe the fatigue exemption evaluation for the containment liner plate and cold penetrations.
5