- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML21196A076, ML22045A053, ML22111A314, ML22193A254, ML22349A148, ML24255A332, RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1, RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3, RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4, RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3, RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a, RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L, RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a, RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6, RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a, RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b
|
MONTHYEARML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 Project stage: Request ML21158A1932021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses Project stage: Request RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 Project stage: Request ML21196A0762021-07-23023 July 2021 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review Project stage: Other ML21271A5862021-09-21021 September 2021, 22 September 2021, 28 September 2021 SLRA - RAI B2.1.27-1 Project stage: Request ML21270A2492021-09-27027 September 2021 Beyond Nuclear and Sierra Club Hearing Request Project stage: Request RA-21-0281, Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-12021-10-22022 October 2021 Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-1 Project stage: Response to RAI ML21295A7182021-10-22022 October 2021 Applicants Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club Project stage: Request ML21295A7172021-10-22022 October 2021 Notices of Appearance for Tracey M. Leroy, Paul M. Bessette, and Ryan K. Lighty on Behalf of Duke Energy Carolinas, LLC Project stage: Request RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 Project stage: Supplement ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 Project stage: Request ML21313A2322021-11-0404 November 2021 SLRA - Requests for Confirmation of Information - Set 1 Project stage: Request RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 Project stage: Supplement ML21327A2772021-11-23023 November 2021 SLRA - Requests for Additional Information (Set 1) + 2nd Round RAI B2.1.27-1a Project stage: Request ML21335A2692021-12-0101 December 2021 Petitioners Response to Duke Motion to Strike Portion of Petitioners Reply Project stage: Request RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 Project stage: Other RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 Project stage: Supplement RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 Project stage: Request RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a Project stage: Response to RAI ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information Project stage: Response to RAI ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs Project stage: Request ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators Project stage: Request ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections Project stage: Request ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring Project stage: Request ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses Project stage: Request ML22024A0022022-01-19019 January 2022, 20 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Duke Energy Project stage: Request ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System Project stage: Request ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping Project stage: Request ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection Project stage: Request ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min Project stage: Request ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening Project stage: Request ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence Project stage: Request ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System Project stage: Request ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects Project stage: Request ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion Project stage: Request ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler Project stage: Request ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J Project stage: Request ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring Project stage: Request ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures Project stage: Request ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl Project stage: Request ML22024A0082022-01-20020 January 2022 Breakout Questions - Trp 2 - Water Chemistry Project stage: Request ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance Project stage: Request ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS Project stage: Request ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural Project stage: Request ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling Project stage: Request ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls Project stage: Request ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress Project stage: Request ML22024A0062022-01-20020 January 2022 Breakout Questions - Structural Scoping and Screening Project stage: Request ML22024A0172022-01-20020 January 2022 Breakout Questions - Trp 18 - Bolting Integrity Project stage: Request ML22024A0092022-01-20020 January 2022 Breakout Questions - Trp 3 - RPV Closure Head Studs Project stage: Request 2021-12-17
[Table View] |
Text
Oconee SLRA: Breakout Questions SLRA Section B2.1.9, Bolting Integrity AMP: B2.1.9 l TRP: 18 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request 1
B2.1.9 B - 86 SLRA Section B2.1.9, Bolting Integrity, states that the AMP is an existing condition monitoring program which manages loss of preload, cracking, and loss of material related to closure bolting on pressure-retaining components.
However, based on review of documents on the portal, it is not clear if the existing program already manages leakage for systems where leakage is difficult to detect, or if leakage for these systems will be managed through updates to an existing procedure. Based on the documentation on the portal, it appears a new procedure will be developed.
Program
Description:
Clarify/confirm that the bolting integrity AMP is an existing program, except for managing the sampling and direct inspection for piping systems that are difficult to detect leakage.
Explain/discuss how management of leakage for systems where leakage is difficult to detect is being addressed as an enhancement or via a completely new.
2 B2.1.9 B - 88 The GALL-SLR Report AMP XI.M18 recommends that selection of bolting material and the use of lubricants and sealants is in accordance with the guidelines of EPRI Reports 1015336 and 1015337 and the additional recommendations of NUREG-1339 to prevent or mitigate stress corrosion cracking (SCC).
SLRA Enhancement No. 1 seeks to revise applicable procedure and specifications to include reference to EPRI Report 1015336, EPRI Report 1015337, and NUREG-1339, as appropriate.
However, it is not clear how just including the references will ensure that adequate preventive actions are implemented within Preventive Actions:
Clarify how the enhancement will be consistent with the GALL-SLR Report AMP recommendation to ensure that selection of bolting material and the use of lubricants and sealants are in accordance with the provided guidance and not just a reference.
Clarify how the program will be consistent with the GALL-SLR report AMP recommendation to ensure that molybdenum disulfide
Oconee SLRA: Breakout Questions SLRA Section B2.1.9, Bolting Integrity AMP: B2.1.9 l TRP: 18 the procedures. The staff notes that the intent of the recommended preventive actions in GALL-SLR Report XI.M18 is to implement within the procedures the specified preventive or mitigative actions from these guidelines.
The GALL-SLR Report emphasizes the industry guidance recommendation to restrict the use of molybdenum disulfide (MoS2) as a lubricant since it has been shown to be a potential contributor to SCC.
However, no restriction was identified in the program for its use. The staff noted that the AMP recommends the use of Loctite N-5000 or equivalent for lubrication, but no restriction on MoS2 was identified. The staff also noted some procedure markup addressing this, but no enhancement in the SLRA has been provided.
The GALL-SLR Report recommends including preventive actions which limits the use of bolting material to those with an actual measured yield strength less than 150 ksi.
However, it is not clear whether the AMP already considers this as a preventive action or if an exception was made since the staff couldnt verify it within the provided references.
(MoS2) is not used as a lubricant.
Clarify where the existing program includes preventive measures to ensure that bolting material with an actual measured yield strength of less than 150 ksi is being used.
3 B2.1.9 B - 86 The GALL-SLR Report AMP XI.M18 recommends monitoring for crack Detection of Aging Effects:
Oconee SLRA: Breakout Questions SLRA Section B2.1.9, Bolting Integrity AMP: B2.1.9 l TRP: 18 initiation, loss of preload, or loss of material as bolting degradation that may result in leakage from the mating surfaces or joint connections of pressure boundary components.
However, it is not clear where Oconee implements these inspection criteria in their existing procedures.
The GALL-SLR Report AMP recommends the SLRA to state how the aging effects associated with closure bolting of components that are not normally pressurized will be managed.
However, it is not clear where this is addressed in the SLRA and/or how Oconee will address this concern.
Clarify how/where the existing program ensures that degradation of pressure boundary closure bolting due to crack initiation, loss of preload, or loss of material that may result in leakage from the mating surfaces or joint connections of pressure boundary components is being detected during inspections.
Clarify how/where the existing program ensures that closure bolting of components that are not normally pressurized will be managed (e.g.,
checking the torque to the extent that the closure bolting is not loose) during the inspections.
4 B2.1.9 B - 88 The GALL-SLR Report AMP XI.M18 recommends the inspections results be evaluated and, when practical, degradations be projected until the next scheduled inspection to ensure that components intended function will be maintained throughout the SPEO.
The staff noted AD-MN-ALL-0006 generally addresses this within the procedure for general leakages. However, it is not clear how Oconee addresses this for closure bolting in locations that preclude detection of joint Monitoring and Trending:
Clarify how the GALL-SLR report AMP recommendation related to projection of inspection results to the next inspection is addressed by the existing AMP or how it will be addressed.
Oconee SLRA: Breakout Questions SLRA Section B2.1.9, Bolting Integrity AMP: B2.1.9 l TRP: 18 leakage, or where the piping systems contain air or gas for which leakage is difficult to detect.
5 B2.1.9 B - 88 The GALL-SLR Report AMP XI.M18, Corrective Action program element recommends, for sampling-based inspections, to conduct additional inspections if one of the inspections does not meet the acceptance criteria.
SLRA AMP Enhancement No. 5 seems to imply that additional inspections will be performed when sample-based inspections, in general, not meet the acceptance criteria. Therefore, it is not clear if the procedure will implement this additional inspection for each inspection that did not meet the acceptance criteria.
It is noted that the proposed draft procedure (Section 8.1) states that for each unsat inspection result However, it is not stated as clearly in the SLRA enhancement that is being evaluated.
The GALL-SLR Report AMP also seeks to ensure that, at multi-unit sites, the additional inspections include inspections at all of the units with the same material, environment, and aging effect combination.
SLRA Enhancement No. 5 will enhance the AMP to ensure that additional inspections of similar bolting will be performed at all three units Corrective Actions:
Clarify if the intent of this enhancement is to implement additional inspections for each inspection that did not meet the acceptance criteria or a more general approach of once when any sample-based inspection as a whole does not meet the acceptance criteria. Enhancement may need to be clarified, as necessary.
Clarify if inspections of similar bolting (enhancement No. 5) is intended to be bolting in other units having the same material, environment, and aging effect combination.
Oconee SLRA: Breakout Questions SLRA Section B2.1.9, Bolting Integrity AMP: B2.1.9 l TRP: 18 6
A2.9 A-10 The FSAR Supplement states, in part, that closure bolting on pressure-retaining components and mechanical bolting that are submerged or closure bolting on pressure-retaining components located in piping systems that contain air or gas is inspected by alternate means, However, it is not clear why the testing by alternate means was omitted. It is noted that enhancement No. 4 includes the use of other testing methods (e.g., soap bubble testing) to detect cracking for this system.
FSAR Supplement:
Clarify why testing by alternate means (e.g.,
inspected or tested) was not included as part of the FSAR supplement summary description.