Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML21196A076, ML22045A053, ML22111A314, ML22193A254, ML22349A148, ML24255A332, RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1, RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3, RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4, RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3, RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a, RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L, RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a, RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6, RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a, RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b
|
MONTHYEARML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 Project stage: Request ML21158A1932021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses Project stage: Request RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 Project stage: Request ML21196A0762021-07-23023 July 2021 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review Project stage: Other ML21271A5862021-09-21021 September 2021, 22 September 2021, 28 September 2021 SLRA - RAI B2.1.27-1 Project stage: Request ML21270A2492021-09-27027 September 2021 Beyond Nuclear and Sierra Club Hearing Request Project stage: Request RA-21-0281, Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-12021-10-22022 October 2021 Subsequent License Renewal Application, Response to NRC Request for Additional Information B2.1.27-1 Project stage: Response to RAI ML21295A7182021-10-22022 October 2021 Applicants Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club Project stage: Request ML21295A7172021-10-22022 October 2021 Notices of Appearance for Tracey M. Leroy, Paul M. Bessette, and Ryan K. Lighty on Behalf of Duke Energy Carolinas, LLC Project stage: Request RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 Project stage: Supplement ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 Project stage: Request ML21313A2322021-11-0404 November 2021 SLRA - Requests for Confirmation of Information - Set 1 Project stage: Request RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 Project stage: Supplement ML21327A2772021-11-23023 November 2021 SLRA - Requests for Additional Information (Set 1) + 2nd Round RAI B2.1.27-1a Project stage: Request ML21335A2692021-12-0101 December 2021 Petitioners Response to Duke Motion to Strike Portion of Petitioners Reply Project stage: Request RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 Project stage: Other RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 Project stage: Supplement RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 Project stage: Request RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a Project stage: Response to RAI ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information Project stage: Response to RAI ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs Project stage: Request ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators Project stage: Request ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections Project stage: Request ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring Project stage: Request ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses Project stage: Request ML22024A0022022-01-19019 January 2022, 20 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Duke Energy Project stage: Request ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System Project stage: Request ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping Project stage: Request ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection Project stage: Request ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min Project stage: Request ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening Project stage: Request ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence Project stage: Request ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System Project stage: Request ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects Project stage: Request ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion Project stage: Request ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler Project stage: Request ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J Project stage: Request ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring Project stage: Request ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures Project stage: Request ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl Project stage: Request ML22024A0082022-01-20020 January 2022 Breakout Questions - Trp 2 - Water Chemistry Project stage: Request ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance Project stage: Request ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS Project stage: Request ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural Project stage: Request ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling Project stage: Request ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls Project stage: Request ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress Project stage: Request ML22024A0062022-01-20020 January 2022 Breakout Questions - Structural Scoping and Screening Project stage: Request ML22024A0172022-01-20020 January 2022 Breakout Questions - Trp 18 - Bolting Integrity Project stage: Request ML22024A0092022-01-20020 January 2022 Breakout Questions - Trp 3 - RPV Closure Head Studs Project stage: Request 2021-12-17
[Table View] |
Text
ONS SLRA: Breakout Questions SLRA Section B2.1.29 - ASME XI, Subsection IWL AMP TRP: 042 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request 1
B2.1.29 N/A AR 01817471 on CERTREC discusses a lack of adequate records for IWL exams on Unit 2.
How has this issue been addressed to ensure proper records are taken moving forward? Can you point to inspection procedures that clearly identify what needs to be recorded during each inspection?
2 B2.1.29 OE #2 B-205 SLRA OE #2 and associated AR01828181 discusses cracking on the Unit 1 dome and the possible installation of a protective coating system.
Was the coating system installed?
Has similar cracking been seen on Units 2 or 3 and if so were similar corrective actions taken?
Please provide ARs or WOs on the portal documenting the resolution (i.e., WO showing the installation of the coating system, follow-up inspections, etc.)
3 B2.1.29 OE #3 B-205 SLRA OE#3 discusses high concrete temperatures around the Unit 1 main steam penetration.
Were Units 2 and 3 checked for similar high temperature issues? If so what was the resolution, if not why not?
4 B2.1.29 N/A AR01830970 discusses spalling around tendon bearing plates.
If available, please load pictures of this issue on to Certrec for staff review.
5 B2.1.29 N/A AR02081433 discusses indications found during tendon inspections.
Please provide documentation on Certrec showing the
resolution of these issues.
Include photos if available.
6 N/A N/A NRC Information Notice (IN) 99-10 notes that during a 1998 walkdown NRC staff observed tendon grease leakage from hoop tendons on all three containments.
During the recent SLR walkdowns, NRC staff once again identified grease stains on the containment structures.
Explain if the grease leakage is an ongoing issue or if the stains seen during recent walkdowns are inactive and indications from past leakage.
If the leakage is active please explain how it is being age-managed.
7 3.5.2.2.1.7 3-1211 SRP-SLR guidance says a plant-specific program is not necessary if the concrete was constructed with air content of 3 to 8 percent.
Provide documentation on the portal demonstrating the air content of the containment structures.
8 4.5, B3.4 and B2.1.29 B-204 Section 4.5 of SLR-ONS-AMPR-X.S1 (Containment Tendon AMP Basis Doc) states, the calculations for tendon prestressing losses and predicted tendon forces are consistent with NRC RG 1.35.1.
However, SLRA Section B2.1.29 (ASME Section XI, Subsection IWL) contains an exception to element 6 which states, the predicted lower limit values consider the same factors, but are not in complete accordance with RG 1.35.1 for determining predicted lower limit values.
Please explain this apparent discrepancy and elaborate on the justification for the exception in SLRA Section B2.1.29.