RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | 12 October 2023 | Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | Subsequent License Renewal |
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination |
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination Weld Overlay Finite Element Analysis |
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | 7 July 2023 | Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | 20 June 2023 | Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | FLEX License Renewal Subsequent License Renewal Environmental Justice Power Uprate Measurement Uncertainty Recapture |
RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report | 26 April 2023 | Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report | |
RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities | 9 March 2023 | Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities | Incorporated by reference Commercial Grade |
RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations | 7 October 2022 | Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations | |
RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a | 2 September 2022 | Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal EVT-1 Affidavit |
RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 | 25 July 2022 | Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 | Boric Acid Hydrostatic Aging Management License Renewal Subsequent License Renewal Power Uprate Measurement Uncertainty Recapture Affidavit |
RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b | 8 July 2022 | Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b | Stress corrosion cracking Subsequent License Renewal Affidavit |
RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a | 8 June 2022 | Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a | Aging Management Subsequent License Renewal Thermography |
RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 | 27 May 2022 | Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 | Boric Acid Aging Management Subsequent License Renewal |
RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a | 20 May 2022 | Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a | Subsequent License Renewal |
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | 13 May 2022 | Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | Health Physics Network High winds |
RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L | 11 May 2022 | Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L | Aging Management License Renewal Subsequent License Renewal |
RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 | 22 April 2022 | Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 | Boric Acid Coatings Nondestructive Examination Aging Management Flow Accelerated Corrosion Eddy Current Testing Subsequent License Renewal |
RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 | 20 April 2022 | Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 | Aging Management Subsequent License Renewal |
RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW | 14 April 2022 | Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW | Unanalyzed Condition Stroke time Surveillance Frequency Control Program Time Critical Operator Action |
RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates | 31 March 2022 | Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates | Aging Management Subsequent License Renewal Thermography |
RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 | 22 March 2022 | Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 | Fire Barrier Aging Management License Renewal Subsequent License Renewal Fire Protection Program |
ML22075A203 | 11 March 2022 | Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting | Aging Management |
ML22074A002 | 11 March 2022 | Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP | Aging Management |
RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 | 21 February 2022 | Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 | Aging Management Subsequent License Renewal |
RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 | 21 January 2022 | Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 | Aging Management License Renewal Subsequent License Renewal |
RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material | 20 January 2022 | Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material | Stress corrosion cracking |
RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a | 7 January 2022 | Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a | Boric Acid Weld Overlay Coatings Operating Basis Earthquake Aging Management License Renewal Subsequent License Renewal Dissimilar Metal Weld Power change Flow Induced Vibration Exclusive Use Affidavit Thermal fatigue |
ML22019A118 | 7 January 2022 | Enclosures 1,2 & 3: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E, Environmental Report - Index of Duke Energy'S Responses, Responses to NRC Requests for Confirmation of Information and NRC Reque | FLEX License Renewal Subsequent License Renewal Environmental Justice Stolen Power Uprate Measurement Uncertainty Recapture |
ML22019A123 | 7 January 2022 | Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information and Request for Confirmation of Information | License Renewal Subsequent License Renewal |
ML22019A120 | 7 January 2022 | Appendix K | |
ML22019A119 | 7 January 2022 | Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist | Safe Shutdown Temporary Modification FLEX Foreign Material Exclusion License Renewal Power Uprate Measurement Uncertainty Recapture |
ML22019A124 | 7 January 2022 | Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents | Safe Shutdown Ultimate heat sink Hydrostatic License Renewal Biofouling Siren Power Uprate Measurement Uncertainty Recapture |
ML22019A121 | 7 January 2022 | Appendix 13-B Peer Reviewer Communication Log | |
ML22019A122 | 7 January 2022 | Calculation of Permeability by the Falling Head Method | |
RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station | 7 January 2022 | Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station | Zebra Mussel |
ML22007A015 | 7 January 2022 | Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information | FLEX License Renewal Subsequent License Renewal Environmental Justice Power Uprate Measurement Uncertainty Recapture |
RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 2 | 17 December 2021 | Response to NRC Requests for Confirmation of Information - Set 2 | Aging Management License Renewal Subsequent License Renewal |
RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 | 2 December 2021 | Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 | Fire Barrier Operating Basis Earthquake Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal Fire Protection Program |
RA-21-0269, Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-28 | 9 November 2021 | Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-28 | |
RA-21-0270, Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853 | 28 October 2021 | Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853 | Weld Overlay Stress corrosion cracking |
RA-21-0242, Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection | 31 August 2021 | Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection | Weld Overlay Nondestructive Examination Stress corrosion cracking |
RA-21-0219, Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals | 5 August 2021 | Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals | Subsequent License Renewal Power change Exclusive Use Affidavit |
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 11 March 2021 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Tornado Missile Met Tower Emergency Lighting Incorporated by reference FLEX Open House Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Siren Overexposure |
RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 | 11 February 2021 | Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( | |
RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information | 17 September 2020 | Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information | Safe Shutdown Ultimate heat sink Time Critical Operator Action GOTHIC |
RA-19-0281, Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093) | 31 July 2019 | Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093) | |
RA-19-0301, Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information | 31 July 2019 | Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information | Safe Shutdown Loop seal Ultimate heat sink Tornado Missile Internal Flooding Probabilistic Risk Assessment Finite Element Analysis FLEX Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection TORMIS Earthquake Fuel cladding Affidavit |
RA-19-0134, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-05 | 7 March 2019 | Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-05 | |
RA-19-0116, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-05 | 26 February 2019 | Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-05 | |
RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | 11 February 2019 | Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | |